Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.6 LAccepted-AOC H NO 2 88 A THAKUR WADA OLD FARIDABAD 121002 | FARIDABAD | FARIDABAD | HARYANA | 121002 | ₹1.6 L | L1 | Accepted-AOC L1 |
| 2 | L2₹1.6 L+₹8,039.61 (5.12%)Rejected-AOC H NO G162 SECTOR 10 FARIDABAD 121006 | FARIDABAD | FARIDABAD | HARYANA | 121006 | ₹1.6 L+₹8,039.61 (5.12%) | L2 | Rejected-AOC L2 |
| 3 | L3₹1.7 L+₹11,506.37 (7.33%)Rejected-AOC PLOT NO 73 HOUSE NO 73 SECTOR 18 FARIDABAD 121002 | FARIDABAD | FARIDABAD | HARYANA | 121002 | ₹1.7 L+₹11,506.37 (7.33%) | L3 | Rejected-AOC L3 |
Tender Value
₹1.7 L
EMD Value
₹3,300
Closing Date
31 Mar 2026, 6:00 pmClosed
Sandeep Dahiya
Horticulture Faridabad
HEW 172 Construction of brick toe wall and cement plaster in sector-59 near village kail gaon Faridabad.
2026_HBC_510648_1
20267CF12EC2 53B8 4CD2 8EFA 760F3A3AA39C264HSV
Open Tender
Civil Works
Works
30 days
Faridabad (MC)
as per dnit
2 documents required · 2 mandatory
₹250
₹3,300
Yes
8 Apr 2026
24 Mar 2026
1 Apr 2026
24 Mar 2026
31 Mar 2026
24 Mar 2026
24 Mar 2026 - 26 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | [11.6.1]15 mm cement plaster on the rough side of single or half brick wall of mix : 1. 1:4 (1 cement: 4 fine sand) | - | Sqm | 138 | - |
| 2 | [4.14.1]Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. 1. All kinds of soil. | - | cum | 83 | - |
| 3 | [7.20.2]Brick work with common burnt clay modular bricks of class designation 10.5 in foundation and plinth in: 2. Cement Mortar 1:6 (1 cement : 6 coarse sand) | - | cum | 4,146 | - |
| 4 | Analysis of rate supply and installation of office visitor chair complete in all respect at site of work. | - | Each | 4,000 | - |
| 5 | Analysis of rate supply and installation of Almirah make good interio lockable, grey colour complete in all respect at site of work. | - | Each | 24,000 | - |
| 6 | analysis of rate supply and installation of Executive revolving chair complete in all respect at site of work. | - | Each | 18,700 | - |
| 7 | analysis of rate supply and installation of M.S. Steel Almirah Size 78x36x19 inches complete in all respect at site of work | - | Each | 15,000 | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.99 MB
BOQ_589447.xls
BOQ • 0.36 MB
EMF366Z154693.pdf
Additional Documents • 0.38 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .