Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹28.1 LAccepted-Finance | ₹28.1 L | L1 | Accepted-Finance As per financial evaluation |
| 2 | L2₹29.3 LRejected-Finance | ₹29.3 L | L2 | Rejected-Finance As per financial evaluation |
| 3 | L3₹30.5 LRejected-Finance | ₹30.5 L | L3 | Rejected-Finance As per financial evaluation |
| 4 | Rejected-Technical | - | - | Rejected-Technical as per technical evaluation |
| Sl No | Description | Qty | Unit | CHANDRA BHUSHAN SINGH L1 | M/S APR CONSTRUCTION L2 | LAPANI PROGRESSIVE Pvt. Ltd L3 |
|---|---|---|---|---|---|---|
| 1.00 | U/s Lime (in double packing bag) (Supply of material up to working site) | 27,759 | Kg. | 14.5 ₹4.0 L | 15 ₹4.2 L | 19 ₹5.3 L |
| 2.00 | Surkhi (Machine crushed of well burnt bricks) (Supply of material up to working site) | 41.53 | M3 | 5,660 ₹2.4 L | 5,500 ₹2.3 L | 5,130 ₹2.1 L |
| 3.00 | Coarse sand (from Sone River) (Supply of material up to working site) | 41.53 | M3 | 2,600 ₹1.1 L | 3,000 ₹1.2 L | 4,170 ₹1.7 L |
| 4.00 | Brick agg. 20-25 mm (Supply of material up to working site) | 65.73 | M3 | 3,550 ₹2.3 L | 3,000 ₹2.0 L | 3,800 ₹2.5 L |
| 5.00 | Spl. Size Brick (well burnt 1st class) (15-16 x 10-11 x 3.50 cm) + - 5% in size (Supply of material up to working site) | 1,13,561 | No. | 14 ₹15.9 L | 15 ₹17.0 L | 14 ₹15.9 L |
| 6.00 | Brick Jeera (of well burnt bricks) (Supply of material up to working site) | 4.79 | M3 | 5,660 ₹27,111.40 | 5,500 ₹26,345 | 4,590 ₹21,986.10 |
| 7.00 | Organic material (Supply of material up to working site) | 180.56 | Kg. | 85 ₹15,347.60 | 75 ₹13,542 | 158.1 ₹28,546.54 |
| 8.00 | Chunar Sand Stone (Avg dimension 1.50-2.00 x 0.40 x 0.20) (Supply of material up to working site) | 6.4 | M3 | 22,000 ₹1.4 L | 25,000 ₹1.6 L | 26,240 ₹1.7 L |
| 9.00 | Chunar Sand Stone (Avg. size 1.50-1.70 x 0.50-0.40 x 0.06-0.07 m) (Supply of material up to working site) | 1.02 | M3 | 22,000 ₹22,440 | 25,000 ₹25,500 | 30,958 ₹31,577.16 |
| 10.00 | Supply of the materials for scaffolding work up to working sites, Bamboo 3" | 40 | No. | 220 ₹8,800 | 250 ₹10,000 | 280.5 ₹11,220 |
Tender Value
₹32.3 L
EMD Value
₹80,647
Closing Date
2 Jan 2026, 3:00 pmClosed
SA, ASI, Patna Circle
J C raod anta ghat Patna
as per tender document
2025_ASI_889698_1
3(W)/112/Dec/SR/Shamsher Khan/2025-26/Con(M)
Open Tender
Job Works
180 days
Shamsher nagar
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
Yes
SA ASI
₹80,647
Yes
22 Jan 2026
12 Dec 2025
3 Jan 2026
13 Dec 2025
2 Jan 2026
13 Dec 2025
Select, Excess (+), Less (-) Less (-)
Tender Inviting Authority: Superintending Archaeologist, Archaeological Survey of India, Patna Circle, Patna.
Name of Work: Conservation of Tomb of Shamsher Khan at Shamsher Nagar, Aurangabad (Supply of Materials)
Contract No: 0612-2677623
Name of the Bidder/ Bidding Firm / Company :
Sl. No. Item Description (Supply of material upto working site including carriage of material through head load appx. 560-570 stairs) Item Code / Make Quantity Units Estimated Rate in Rs. P Addition / Deduction Addition / Deduction Values Currency Convertion against each Item Quoted Currency in INR / Other Currency BASIC RATE Including of all taxes in Figures To be entered by the Bidder in Rs. P Excise Duty VAT Freight Charges ( Unloading & Stacking) Any Other Taxes/Duties/Levies Other Taxes 2 IIIrd Party i.e DGS&D / RITES etc Inspection Charges @0.34%+Service Tax Less for Cenvat Credit,if any respect of Supplies Under full Excise Duty Category TOTAL AMOUNT in Rs. P TOTAL AMOUNT TOTAL AMOUNT In Words
1 U/s Lime (in double packing bag) (Supply of material up to working site) 27759 Kg. 158026 Excess(+) Full Conversion INR 1 Chunar Sand Stone (Including carriage charge) (Note: Detail dimension/size of the stone will be shared before supply of the material) 155.49 M3
2 Surkhi (Machine crushed of well burnt bricks) (Supply of material up to working site) 41.53 M3 223 Excess(+) Full Conversion INR 2 Coarse Sand 3.9 M3
3 Coarse sand (from Sone River) (Supply of material up to working site) 41.53 M3 223 Excess(+) Full Conversion INR 3 Surkhi (machine crushed) 3.9 M3
4 Brick agg. 20-25 mm (Supply of material up to working site) 65.73 M3 223 Excess(+) Full Conversion INR 4 Brick Agg. (20-25 mm) 19.24 M3
5 Spl. Size Brick (well burnt 1st class) (15-16 x 10-11 x 3.50 cm) + - 5% in size (Supply of material up to working site) 113561 No. 223 Excess(+) Full Conversion INR 5 U/s Lime (with double packing) 2468 Kg
6 Brick Jeera (of well burnt bricks) (Supply of material up to working site) 4.79 M3 223 Excess(+) Full Conversion INR 6 Organic compound 8.2 Kg
7 Organic material (Supply of material up to working site) 180.56 Kg. 223 Excess(+) Full Conversion INR
8 Chunar Sand Stone (Avg dimension 1.50-2.00 x 0.40 x 0.20) (Supply of material up to working site) 6.4 M3 223 Excess(+) Full Conversion INR
9 Chunar Sand Stone (Avg. size 1.50-1.70 x 0.50-0.40 x 0.06-0.07 m) (Supply of material up to working site) 1.02 M3 223 Excess(+) Full Conversion INR
10 Supply of the materials for scaffolding work up to working sites, Bamboo 3" 40 No. 223 Excess(+) Full Conversion INR
11 Bamboo 1.5" 30 No. 223 Excess(+) Full Conversion INR
12 Challi 20 No. 223 Excess(+) Full Conversion INR
13 Nariyal Rassi 20 Kg. 223 Excess(+) Full Conversion INR
14 Bamboo Ladder (18’-20’) 2 No. 223 Excess(+) Full Conversion INR
15 Juite Rope (in bundle) 2 No. 223 Excess(+) Full Conversion INR
16 Tree Killer 5 No. 223 Excess(+) Full Conversion INR
Total in Figures
Quoted Rate in Figures Select
Quoted Rate in Words
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 6.66 MB
shhamshermaterials.pdf
Tender Documents • 6.65 MB
BOQ_935127.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid