EE PHED DN SHAHPURA
EE PHED DN SHAHPURA
Repair And Maintenance Of Pancha Ka Bada Water Supply Scheme In UWSS Jahazpur Tehsil Jahazpur District Bhilwara
2026_PHCJA_540760_1
120/2025-26
Open Tender
Repair and Maintenance Works
365 days
SHAHPURA
AS PER NIT
2 documents required · 2 mandatory
₹1,500
AS PER NIT CONDITION
₹11,535
Yes
19 May 2026
20 Feb 2026
5 Mar 2026
20 Feb 2026
5 Mar 2026
20 Feb 2026
Maintenance of pipelines irrespective of size & material which includes Repairing of Bursts & leakages pollution control, survey & removal of choking, disconnection of illegal connections, Collection & recording minimum 10 nos. residual chlorine samples during daily supply timings, interconnections and all works related to pipeline network in existing distribution /rising main pipe lines of all sizes by digging out suitable size of pit in soft and loose soil/ hard soil including cutting of Black top, WBM & CC top of road of any size at work site. This will also include cutting of pipe ends, fixing of pipe piece with jointing material to make repair leak proof and refilling of pit by excavated sand by ramming it at sides of pipes and up to ground level. For entire job contractor will use their own T & P. Contractor with his own resources shall arrange de-watering, JCB & Tractor compressor if any and restore any amenity at his own cost damaged while performing the work in this item. The works includes daily patrolling and repair the leakages within stipulated time and complete maintenance of pipe line network of rising and distribution pipeline network within the scope of work for per km pipe line per month.(Jointing material shall be provided by the department.)
Minimum labour for a following kms pipelines to be deployed
1 km to 50 km – one fitter-II & one beldar (Total Pipe Line Length 25.85 Km.)
Maintenance of tubewells / openwells which includes round the clock monitoring of tubewells of all sizes, complete repairs / rewinding of submersible pump sets including cost of material components required to repair pumpsets, starters, meters etc. of electric panel of tube wells, Lowering and unlowering of pumpsets complete in all respect, maintenance of log-books & Histroy sheet as directed by Engineer-in-charge for tubewell per month.
8.0 HP to 10.0 HP
13.0 HP to 15.0 HP
Cleaning of over head water reservoirs ( OHSR's) of below mentioned capacity including removal of all silt from reservoir, scrapping of walls, disinfection of reservoir after cleaning and disposal of silt up to 1.00 Km lead and painting the date of cleaning on the reservoir.
Daily/ periodical operation of valves at supply times for specified by department per sluice valve per month. (Valve rod and cap to be arranged by contractor)
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.73 MB
BOQ_963977.xls
BOQ • 0.31 MB
ENIT120PanchkBada.pdf
Tender Documents • 2.17 MB
Download all tender documents and submit your bid