Loading…
Loading…
Tender Value
₹5.0 L
EMD Value
₹9,900
Closing Date
9 Jul 2026, 6:00 pm7d left
EXECUTIVE ENGINEER
HPPWD Jubbal
SH C/O B/wall in wire Crate at Rd 3/150 to 3/170 and ROFD at RD 3/250 to 3/300
2026_PWD_137910_8
3577-79, Dated 30.06.2026
Open Tender
Civil Works
Jubbal
Please refer Tender documents.
8 documents required · 8 mandatory
₹350
₹9,900
2 Jul 2026
2 Jul 2026
10 Jul 2026
2 Jul 2026
9 Jul 2026
2 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation in earth work in hilly area in all heights and depths in all kinds of soil including saturated soil comprising of mixed soil, ordinary and hard rock. All work of rock cutting by blasting shall be carried out by taking all necessary precautions against soil erosion,damage to hill side.Water pollution, etc and to protect soil stability of hill side rock shall be excavated with chiseling and wedging our rock (where blasting is prohibited).All earth work in cutting/excavation including rock excavation shall be carried out true to line,grades,slops,width,camber,super elevation and level as shown on the drawing as per direction of Engineer in Charge in conformity with the requirement of technical specification for rural roads august 2004 clause 16.2 of general conditions of contract to achieve designed formation width including hauling and stacking of material useful for construction at suitable sites and stage, disposal of unsuitable cut material in specificied manner, trimmingfilling of unevenness blindage and finishing of the road to specified diamensions or as directed by Engineer in charge for smooth riding.The recovery of useful stones shall be made from the contractor and recovery of 71.76 cubic meter useful stones shall be made @ 300/-per cubic meter on prorata basis in each running bill. Any loss to the public and private property during the course of excavation shall be resorted by the contractor what so ever the nature of the same may be.The servicable material will be stacked out specified /dimension in all leads and lifts as per the direction of Engineer in Charge. | 439.33 | Per cubic metre | 296.5 | ₹1,30,261.35 |
| 2 | Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a any lead and lift , dressing of sides and bottom and backfilling in trenches with excavated suitable material.useful material available from excavation to be properly stacked and handed over to the department free of cost including all leads and lifts, as per HPPWD, specification of 1990 volume-I or as directed by the Engineer-In-Charge | 113 | Per cubic metre | 490 | ₹55,370 |
| 3 | Providing and laying of boulder apron laid in wire crates with 4 mm dia GI wire conforming to IS:280 and IS:4826 in 100 mm x 100 mm mesh (woven diagonally) including 10 per cent extra for laps and joints laid with stone boulders weighing not less than 25 kg each as per drawing and technical specifications Clause 1301 including all leads and lifts as per HPPWD, specification of 1990 volume-I as directed by the Engineer-In-Charge | 93.75 | Per cubic metre | 3,300 | ₹3,09,375 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.39 MB
sbd.pdf
Tender Documents • 2.61 MB
BOQ_204213.xls
BOQ • 0.23 MB
Download all tender documents and submit your bid