Loading…
Loading…
| # | Company | Amount | Status |
|---|---|---|---|
| 1 | ₹14.2 CrAdmitted-Finance | ₹14.2 Cr | Admitted-Finance |
| 2 | ₹14.9 CrAdmitted-Finance | ₹14.9 Cr | Admitted-Finance |
| 3 | ₹15.5 CrAdmitted-Finance GALI GOPALPURA MORENA M P | MORENA | MADHYA PRADESH | 476001 | ₹15.5 Cr | Admitted-Finance |
| 4 | ₹17.4 CrAdmitted-Finance SAGAR MADHYA PRADESH | SAGAR | MADHYA PRADESH | 464240 | ₹17.4 Cr | Admitted-Finance |
| 5 | ₹17.5 CrAdmitted-Finance | ₹17.5 Cr | Admitted-Finance |
| Sl No | Description | Qty | Unit | LAXMAN SINGH PARMAR | MONU SHUKLA | Jal Instruments | PANKAJ TIWARI | RAMA INDUSTRIES |
|---|---|---|---|---|---|---|---|---|
| 1.00Name of work | ||||||||
| 1.01 | 1. Construction of 1 Nos. Interception Diversion Structure 2 Nos of Road Gully Chamber.
2. Survey, Design and Construction of 2100 m Length of RCC drain.
3. Survey, Design and Construction of Sewage treatment plant of installed capacity 3.50 MLD and all appurtenant structures and allied works.
4. Providing, Laying & Supply of 350mm diameter pipeline comprising of DIK7 pipe having length of 140 m for Pumping wastewater from pumping station to STP including survey, design, construction of 4.0 No. of Pumping stations and all appurtenant structures and allied works.
5. Reuse of the Treated Sewer for the Green Space and agricultural purposes comprising of DIK-7 pipe of 100mm diameter having the length of 45 meters of distribution pipe. including survey, design, construction of 100 kl sump & Pump of appurtenant structures and allied works.
6. Planting of Trees and their Maintenance for one Year (Planting of trees by the roadside (Avenue trees) in 0.60 m Dia holes and maintaining the plants for one year).
7. Providing and laying of HT Feeder having the length of 3.00 kms and 2 NOS Electrical Substation.
8. Providing, installing, testing, and commissioning of Online Continuous Monitoring System (OCMS) for monitoring water quality characteristics before and after treatment, complete with analyzers, data logger, and remote data transmission. | 1 | Lump sum | 7,09,44,400 ₹7.1 Cr | 7,57,76,965.6 ₹7.6 Cr | 7,34,48,320 ₹7.3 Cr | 8,16,24,800 ₹8.2 Cr | 8,34,21,350 ₹8.3 Cr |
| 1.02Operation and Maintenance Cost next 10 Years | ||||||||
| 1.03 | 1st Year | 1 | Lump sum | 23,81,700 ₹23.8 L | 28,02,000 ₹28.0 L | 21,00,000 ₹21 L | 26,61,900 ₹26.6 L | 26,02,000 ₹26.0 L |
| 1.04 | 2nd Year | 1 | Lump sum | 25,24,602 ₹25.2 L | 29,70,120 ₹29.7 L | 22,26,000 ₹22.3 L | 28,21,614 ₹28.2 L | 27,70,120 ₹27.7 L |
| 1.05 | 3rd Year | 1 | Lump sum | 26,76,077 ₹26.8 L | 31,48,327 ₹31.5 L | 23,59,560 ₹23.6 L | 29,90,910 ₹29.9 L | 29,48,327 ₹29.5 L |
| 1.06 | 4th Year | 1 | Lump sum | 28,36,643 ₹28.4 L | 33,37,227 ₹33.4 L | 25,01,133.6 ₹25.0 L | 31,70,365 ₹31.7 L | 31,37,227 ₹31.4 L |
| 1.07 | 5th Year | 1 | Lump sum | 30,06,841 ₹30.1 L | 35,37,460 ₹35.4 L | 26,51,201.62 ₹26.5 L | 33,60,600 ₹33.6 L | 33,37,450 ₹33.4 L |
| 1.08 | 6th Year | 1 | Lump sum | 31,87,251 ₹31.9 L | 37,39,708 ₹37.4 L | 28,10,273.72 ₹28.1 L | 35,62,222 ₹35.6 L | 35,49,708 ₹35.5 L |
| 1.09 | 7th Year | 1 | Lump sum | 33,78,487 ₹33.8 L | 39,74,691 ₹39.7 L | 29,78,890.14 ₹29.8 L | 37,75,960 ₹37.8 L | 37,74,691 ₹37.7 L |
Updated dates
Tender Value
₹8.3 Cr
EMD Value
₹4.2 L
Closing Date
6 May 2026, 5:30 pmClosed
Chief Municipal Officer
MUNICIPAL COUNCIL BANDA DISTT SAGAR
Interception and Diversion of Nallahs with STP works Project of Banda town under SBM 2.0
2026_UAD_494666_1
724 Dt 25-03-2026
Open Tender
Civil Works - Others
365 days
BANDA
Please refer Tender documents.
3 documents required · 3 mandatory
₹20,000
₹4.2 L
BANDA
9 Jun 2026
26 Mar 2026
8 May 2026
26 Mar 2026
6 May 2026
26 Mar 2026
26 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1Name of work | ||||||
| 1.01 | 1. Construction of 1 Nos. Interception Diversion Structure 2 Nos of Road Gully Chamber.
2. Survey, Design and Construction of 2100 m Length of RCC drain.
3. Survey, Design and Construction of Sewage treatment plant of installed capacity 3.50 MLD and all appurtenant structures and allied works.
4. Providing, Laying & Supply of 350mm diameter pipeline comprising of DIK7 pipe having length of 140 m for Pumping wastewater from pumping station to STP including survey, design, construction of 4.0 No. of Pumping stations and all appurtenant structures and allied works.
5. Reuse of the Treated Sewer for the Green Space and agricultural purposes comprising of DIK-7 pipe of 100mm diameter having the length of 45 meters of distribution pipe. including survey, design, construction of 100 kl sump & Pump of appurtenant structures and allied works.
6. Planting of Trees and their Maintenance for one Year (Planting of trees by the roadside (Avenue trees) in 0.60 m Dia holes and maintaining the plants for one year).
7. Providing and laying of HT Feeder having the length of 3.00 kms and 2 NOS Electrical Substation.
8. Providing, installing, testing, and commissioning of Online Continuous Monitoring System (OCMS) for monitoring water quality characteristics before and after treatment, complete with analyzers, data logger, and remote data transmission. | - | Lump sum | - | - | item1 |
| 1.02 | Operation and Maintenance Cost next 10 Years | - | - | - | - | - |
| 1.03 | 1st Year | - | Lump sum | - | - | item2 |
| 1.04 | 2nd Year | - | Lump sum | - | - | item3 |
| 1.05 | 3rd Year | - | Lump sum | - | - | item4 |
| 1.06 | 4th Year | - | Lump sum | - | - | item5 |
| 1.07 | 5th Year | - | Lump sum | - | - | item6 |
| 1.08 | 6th Year | - | Lump sum | - | - | item7 |
| 1.09 | 7th Year | - | Lump sum | - | - | item8 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.65 MB
Annexure.pdf
Tender Documents • 2.62 MB
Tenderdoc01.pdf
Tender Documents • 1.84 MB
DPR.pdf
Other Document • 6.47 MB
BOQ_589614.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid