Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹24.3 LAdmitted-Finance 05 KUKROOSA HANDWARA KUPWARA KUPWARA JAMMU KASHMIR 193224 | KUPWARA | JAMMU AND KASHMIR | 193224 | L1 | Admitted-Finance | ||
| 2 | L2₹25.2 L+₹86,060.80 (3.54%)Admitted-Finance | L2 | Admitted-Finance | ||
| 3 | L3₹26.4 L+₹2.1 L (8.46%)Admitted-Finance | L3 | Admitted-Finance | ||
| 4 | L4₹28.4 L+₹4.1 L (16.7%)Admitted-Finance | L4 | Admitted-Finance |
Tender Value
₹37.1 L
EMD Value
₹74,200
Closing Date
29 May 2026, 4:00 pmClosed
Executive Engineer RnB Division
SUMBAL SONAWARI
Construction of Teacher quarter 2BK at High School Mukhdamyari Zone Hajin.
2026_PWDJK_309721_3
NIT NO 11 OF 2026-27 SUMBAL DIVISION
Open Tender
Civil Works
Percentage
90 days
SUMBAL SONAWARI
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,100
Executive Engineer RnB Division
₹74,200
4 Jun 2026
11 May 2026
30 May 2026
11 May 2026
29 May 2026
11 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by Mechanical ( Hydrallic) means over areas exceeding 30 cms & upto 5 m in depth 1.5m in width as well as 10 sqm. On plan, disposal of excavated earth upto 1 m, disposed earth to be levelled & neatly dressed( all kinds of soils) | 100.11 | cum | 187.3 | ₹18,750.6 |
| 2 | Providing & Laying of stone soling (dully hand packed)including watering dressing and ramming with all carriages, loading un-loading and stacking etc complete. | 29.3 | Cum | 1,000 | ₹29,300 |
| 3 | filling by avaliable excavated earth( excluding rock) in trenchs plinth sides of foundations in layers not exceeding 20 cm in depth consolidated each deposited by ramming and watering lead upto 50 mtr and lift 1.5 mtr | 44.57 | cum | 218.4 | ₹9,734.09 |
| 4 | Providing & laying in position cement concrete of specified grade excld. The cost of centring and shuttering all work upto plinth level(1:4:8 coarse sand 40mm nominal size crushed stone agg.) | 9.65 | Cum | 5,202.2 | ₹50,201.23 |
| 5 | P/L in position specified grade of reinforced cement cencrete excld. The cost of centring, shuttering, finishing and reinforecement-All work upto plinth level. 1:1.5:3 graded stone agg. 20mm nominal size | 19.65 | Cum | 7,275.25 | ₹1,42,958.66 |
| 6 | RCC work in walls, incld. attchd pilasters, buttresses plinth & string courses, columns, pilars, abts, posts and sturts etc upto floor 5 level excld. Cost of cntring, shuttering, finishing and reinforcement 1:1.5:3 graded crshd stne agg. 20mm nominal size | 26.82 | Cum | 9,821 | ₹2,63,399.22 |
| 7 | Providing & laying in position cement concrete of specified grade excld. The cost of centring and shuttering all work upto plinth level M15(1:2:4)coarse sand 20mm nominal size crushed stone agg.) | 35.37 | Cum | 6,540.45 | ₹2,31,335.72 |
| 8 | Centring and shuttering of kit ply including proping, strutting & removal of the same.:Raft and plinth | 178.9 | Sqm | 286.35 | ₹51,228.02 |
| 9 | Lintel band outer, steps, stair base slab, room beam, slab & stair beam | 185.78 | Sqm | 718.2 | ₹1,33,427.2 |
| 10 | Brick work with FPS bricks of class designation 75 in superstructure in cement mortar 1:6 (1 cement, 6 coarse sand) | 64.23 | Cum | 7,571.55 | ₹4,86,320.66 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.23 MB
BOQ_1002453.xls
BOQ • 0.50 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .