Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | l1₹3.0 CrAccepted-AOC BHUCHO | ₹3.0 Cr | l1 | Accepted-AOC l1 |
| 2 | l2₹3.2 Cr+₹18.1 L (6.10%)Rejected-AOC | ₹3.2 Cr+₹18.1 L (6.10%) | l2 | Rejected-AOC l2 |
| 3 | l3₹3.2 Cr+₹23.5 L (7.91%)Rejected-AOC 180 10 STREET NO 10 HARPAL NAGAR NEAR TRIVENI MANDIR BHATTI ROAD BATHINDA 151001 | BATHINDA | PUNJAB | 151001 | ₹3.2 Cr+₹23.5 L (7.91%) | l3 | Rejected-AOC l3 |
| 4 | l4₹3.2 Cr+₹26.2 L (8.84%)Rejected-AOC 13193 GALI NO 9 NAMDEV MARG BATHINDA | ₹3.2 Cr+₹26.2 L (8.84%) | l4 | Rejected-AOC l4 |
| 5 | l5₹3.3 Cr+₹31.9 L (10.8%)Rejected-AOC 646 SECTOR 4 PANCHKULA | PANCHKULA | HARYANA | 133301 | ₹3.3 Cr+₹31.9 L (10.8%) | l5 | Rejected-AOC l5 |
Tender Value
₹3.7 Cr
EMD Value
₹7.4 L
Closing Date
28 Mar 2025, 4:30 pmClosed
Executive Engineer, Kandi Canal stage-2 WRD,PB. H
Executive Engineer, Kandi Canal stage-2 WRD,PB. Hoshiarp
Estimate for the construction of Distribution system of Kathgarh Distributary No. 1 off taking at RD 4100 m of Kathgarh Rising Main off taking at Burji 38810 Right Side of BDC Main canal(Part 2)
2025_WR_136168_1
21/2024-25
Open Tender
Civil Works - Lift Irrigation Schemes
Item Rate
60 days
Hoshiarpur
Please refer Tender documents.
2 documents required · 2 mandatory
₹20,000
Yes
₹7.4 L
Yes
19 Apr 2025
7 Mar 2025
28 Mar 2025
7 Mar 2025
28 Mar 2025
7 Mar 2025
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | CENTRING AND SHUTTERING | - | - | - | - |
| 2 | (9.14) Shuttering for precast and plain or Reinforced concrete blocks, wall plates, bed plates, shelves etc. (For Sluice Valve Chamber slab) | 42.12 | Sq.Mtr | - | - |
| 3 | CONCRETE | - | - | - | - |
| 4 | (10.13) cement concrete
1:2:4 | - | - | - | - |
| 5 | (a) With stone ballast or shingle | - | - | - | - |
| 6 | (ii) mixing by mechanical means using concrete mixer volumetric type (For Sluice Valve Chamber slab). | 14.22 | Cum | - | - |
| 7 | BRICK WORK | - | - | - | - |
| 8 | (11.5) First class burnt brick work laid in cement sand mortar 1:5 in foundation and plinth | 129.67 | cum | - | - |
| 9 | PLASTERING & POINTING | - | - | - | - |
| 10 | (15.7) 12.5 mm thick cement plaster 1:2 cement sand mortar | 986.08 | Sq.Mtr | - | - |
stage.html
html • 0.07 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
BOQ.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .