| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.4 CrAccepted-AOC 102 SAIPREM COMPLEX JUNA AUSA ROAD LATUR 413 512 | LATUR | LATUR | MAHARASHTRA | 413512 | ₹3.4 Cr Quoted ₹3.5 Cr | L1 | Accepted-AOC Work Order Done |
| 2 | L2₹3.6 CrRejected-Finance 413 512 | LATUR | MAHARASHTRA | 413512 | ₹3.6 Cr | L2 | Rejected-Finance Financially Rejected |
| 3 | L3₹3.6 CrRejected-Finance MUMBAI 400023 | MUMBAI | MAHARASHTRA | 400023 | ₹3.6 Cr | L3 | Rejected-Finance Financially Rejected |
Tender Value
₹3.2 Cr
EMD Value
₹1.6 L
Closing Date
19 Feb 2026, 5:00 pmClosed
Assistant Director Department Of Archaeology
Assistant Director Department Of Archaeology Chh Sambhajinagar
Naldurd Fort Part two tuljapur dharashiv
2026_TCADM_1277404_1
Etender/Notice 05/2026-27
Open Tender
Civil Works - Others
730 days
Tuljapur
Please Refer Tender Documents
3 documents required · 3 mandatory
₹2,360
₹1.6 L
Soneri Mahal Department Of Archaeology
30 Mar 2026
12 Feb 2026
20 Feb 2026
12 Feb 2026
19 Feb 2026
12 Feb 2026
16 Feb 2026
Removal of plants/ ficus growth by pulling out root system embedded in masnory, cutting stem and application of hing/gur/lime formulation as specified by the Architect or other patented chemical biocide treatment such as biocide 'Glycel' (isoproplamine salt of glyphosate) or other chemical as specified by the Engineer in charge etc. complete
Clearing grass and removal of rubbish upto a distance of 50 metres outside the periphery of the area.
Cutting down trees including trunks and branches with girths above 30 cm to 60 cm and stacking the materials neatly with all lifts and lead of 1000m as directed and earth filling in the depression / pit if any.
Dismantling the existing lights, tublelight, bulbs, fans, independent plug points, wiring including circuit mains of all types along with accessories etc. complete as per specification No.WG-DM / PW.
Providing and fixing double scaffolding system (cup lock type) on the exterior side of building/ structure, including additional rows of scaffolding in stepped manner as per requirement of site, made with 40 mm dia M.S. tube, placed 1.5 metre centre to centre, horizontal & vertical tubes joint with cup & lock system with M.S. Tubes, M.S. tube challis, M.S. clamps and staircase system in the scaffolding for working platform etc. and maintaining it in a serviceable condition for execution of work of cleaning and/or pointing and/ or applying chemical and removing it thereafter. The scaffolding system shall be stiffened with bracings, runners, connecting with the building etc, wherever required, if feasible, for inspection of work at required locations with essential safety features for the workmen etc., complete as per directions and approval of Engineer-in-charge. Note:-(1) The elevational area of the scaffolding shall be measured for payment purpose.(2) The payment will be made once only for execution of all items for such works.
Removing the existing cement/ lime plaster of any thickness without causing dust nuisance and stacking the debris upto a distance of 50 m or spreading in the compound and cleaning the site etc. complete.
Raking out joints in lime or cement mortar and preparing the surface for re-pointing or replastering including disposal of rubbish to the dumping ground within 50 metres lead.
Dismantling the R.C.C. Work 1: 2: 4 and sorting out the materials such as steel etc. as directed and stacking them within the specified lead as directed etc. complete.
Removing brick bat coba including stacking the spoils as directed with all leads, lifts etc, complete..
Removing cement tiles or marble or polished shahabad floor or dado without bed concrete including stacking the materials as directed with all lead, lifts, etc. complete.
Removing lime or lean cement concrete including stacking the spoils as directed with all leads, lifts etc, complete
Removing iron pipe railing having wooden or R.C.C or C.C or iron posts and stacking the materials as directed etc. complete.
Removing doors and windows with frames and stacking the materials as directed with all leads, lifts etc. complete.
Dismantling brick masonary in lime or cement mortar and stacking the materials as directed with all lead, lifts, etc
Dismantling stone masonary in lime or cement mortar including stacking the materials as directed with all lead, lifts, etc..
Lowering down carefully existing stone masonry of the monument manually in proper order including shifting the stone elements up to a distance of 50 meter beyond the monument area and stacking them as directed by Engineer in-charge, removing building rubbish and cleaning the site etc. complete.
Excavation for foundation in soils of all types, sand, gravel and soft murum, removing the excavated material upto a distance of 50 metres beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etc. complete (Lift from 1.5 m to 3.0 m) By Mechanical Means.
Providing dry/ trap/ granite/ quartzite/ gneiss rubble stone soling 15 cm to 20 cm thick including hand packing and compacting etc. complete.
Providing and laying cast in situ 1:2:4 Lime Concrete of trap/ granite/ quartzite/ gneiss metal for foundation and bedding as per detailed specifications and drawings or as directed including bailing out water, centring, formwork, laying/pumping, compacting, roughening them if special finish is to be provided, finishing if required with fine aggregate, preparing the lime mortar in lime miller and then mixing with coursed aggregate in drum mixer as per specifications including bailing out water, watering etc. complete.
Filling in plinth and floors with contractors material/brought from outside and approved by Engineer incharge in layers of 15 cm to 20 cm including watering and compaction etc. complete.
Conveying the excavated materials, debris of brick or stone masonary, R.C.C. slab, water proofing, stone members/ materials, cement/ lime concrete, tiles/ marbles/ stone slab/ brick bat coba, etc. upto 5 km, away from the site and cleaning the site properly.
Providing and applying a Silicon Base Water Repellent Stone Sealers, on Brick/ Stone masonry/ Concrete surfaces in Two coats by spraying. Including cleaning/ sandblasting for removing dirt / cement mortar patches etc. by force water jet, wire brushing etc. complete.
Providing general pest control services to the building to control the nuisance of cockroaches, lizards, pin bores and other insects, etc. with 4 operations in a year and monthly checkup.
Providing anti termite treatment to the sides of flooring of the existing building as per I.S. 6313 (Part-III) by punching holes 6 mm dia. drilled at a distance of 30 cm. centre to centre and injecting one percent of chlorodane emulsion concentrate at the rate of 50 ml per hole and sealing by filling putty etc. complete covering 2 years guarantee on bond paper.
Providing and fixing Indian T.W Columns, beams of size 0.125 x 0.125 and min height - 4.50 m (5 x 5 inch x 15ft) for roofing/ floor/ any wooden members including scaffolding if necessary etc. complete. Teakwood for COMPLEX CARVING : Providing and fixing Ist quality (Superior Quality- Berma) Teakwood for COMPLEX CARVING like decorative arches, decorative columns,decorative design structural members like beams,columns,joist,rafters,purlins,purlin cleats,hip rafters, jack rafters, ridges, wall plates, post plates and posts, pedestals or any other wooden members etc. including removing damage/decayed wood members,fixing stainless steel screws, cutting, sawing,making proper wood jonery, scaffolding if necessary all iron work and applying one coat of primer or as directed by Enginner Incharge etc. complete For wood size = 12" x 12 " “ It is mandatory to use well seasoned and first quality Indian Teak Wood from the Forest Department’s FDCML.”
Providing and fixing Indian T.W beams and Stringer beams of size beam - 0.20 x 0.10 - upto 5 m (7.87 x 4 inch x 17ft) for wooden members including scaffolding if necessary etc. complete. Teakwood in Structural members : Providing and fixing Ist quality (Superior Quality- Berma) Teakwood in structural members likebeams,columns,joist,rafters,purlins,purlin cleats,hip rafters, jack rafters, ridges, wall plates, post plates and posts, pedestals or any other wooden members etc. including removing damage/decayed wood members,fixing stainless steel screws, cutting, sawing,making proper wood jonery, scaffolding if necessary all iron work and applying one coat of primer or as directed by Enginner Incharge etc. complete For wood size = 6" x 7" to 6" x 8" “ It is mandatory to use well seasoned and first quality Indian Teak Wood from the Forest Department’s FDCML.”
Providing and fixing Indian T.W rafters of size length 0.075 x 0.075 - upto 3 m (2.95 x 2.95 inch x 10ft) thick for roofing/ floor/ any wooden members including scaffolding if necessary etc. complete. Teakwood in strctural members : Providing and fixing Ist quality (Superior Quality- Berma) Teakwood in structural members likebeams,columns,joist,rafters,purlins,purlin cleats,hip rafters, jack rafters, ridges, wall plates, post plates and posts, pedestals or any other wooden members etc. including removing damage/decayed wood members,fixing stainless steel screws, cutting, sawing,making proper wood jonery, scaffolding if necessary all iron work and applying one coat of primer or as directed by Enginner Incharge etc. complete For wood size = 6" x 7" to 6" x 8" “ It is mandatory to use well seasoned and first quality Indian Teak Wood from the Forest Department’s FDCML.”
Providing and fixing solid wooden door of thickness 0.050 m including frame,fixing Big and small motifs, defensive bolts, pivot and pointed nails and providing steel roller, track for movement of wooden shutter etc. complete as directed by Engineer in charge (Excluding frame) “ It is mandatory to use well seasoned and first quality Indian Teak Wood from the Forest Department’s FDCML.”
Providing and applying melamine polish of required finish to the wood work by spray machine including knotting and preparing the even surface by scraping, applying French polish, scaffolding if required etc. complete
Providing & applying Polyurethane based wood coating to the new or old work in two coats including knotting, preparing the surface by scrapping, scaffolding etc. complete as per manufacturers specifications and as directed.
Providing and Fixing Decorative / Ornamental grills as per design for compound wall / Fencing including fabricating the grill using M.S. square / round bar, flats and angles including painting with one coat of red oxide zinc chromate primer and two coats of synthetic enamel paint of approved colour and brand etc. complete as directed.
Providing Un-coursed Rubble Masonry of trap stones in lime mortar 1:1½, in foundation and plinth as per detailed specifications and drawings or as directed including the stones to be set in the work as received from the quarry, after merely knocking off weak corners and edges with the masons hammer, the stones shall be carefully laid so as to break joints, no joint shall exceed 12.5 mm. (½″) in thickness, every stone shall be set flush in mortar, the face stone shall be for greater size, and good beds, one through stone shall be inserted at least every 0.80 sq. mete (1 square yard), the joints shall be racked out carefully at least 25 mm. (1″) where pointing or plastering to be done, striking joints where no pointing or plastering is to be done, preparing the lime mortar in lime miller, bailing out water, watering and all exposed masonry work when handed over to be perfectly clean and free from all mortar stains etc. complete.
Providing Ashlar Fine Masonry of trap stones in lime mortar 1:1 for Flooring as per the site requirement of size of stone [0.45 x 0.30 x 0.20 Meter] as per detailed specifications and drawings or as directed including the stones be of approved quality, colour, hard and free from defect of any kind, dressing every stones fine tooled on all beds, joints and faces, full true if the surface are plane or to uniform curves or twists if required, the stones shall be set in fine mortar, the beds or joints being in no case more than 3 mm. (⅛″), the stone shall be laid in regular course not less than 30 cm. (12″) in height averaging 4½ c. ft., the face stone shall be laid header and stretcher alternately, preparing the lime mortar in lime miller, scaffolding, watering and all masonry work when handed over to be perfectly clean and free from all mortar stains etc. complete.
Providing Ashlar Facing Rough-tooled Masonry of trap / granite stones in lime mortar 1:1½with size of stone 0.70 x 0.40 x 0.40 meter in superstructure as per detailed specifications and drawings or as directed including t the stones be of approved quality, colour, hard and free from defect of any kind, he face of stones shall be rough-tooled, rustic (with or without chisel draft, except at quoins), or chamfered as specified, the beds and joints of all ashlar stones to be dressed perfectly true, square and full, headers shall not be less in length than breadth of ashlar stone plus 45 cm. (1ꞌ6″), the stones shall be set in mortar, the beds or joints being in no case more than 3 mm. (⅛″), the stone shall be laid in regular course not less than 30 cm. (12″) in height averaging 4½ c. ft., the face stone shall be laid header and stretcher alternately, preparing the lime mortar in lime miller, scaffolding, watering and all masonry work when handed over to be perfectly clean and free from all mortar stains etc. complete.
Providing Ashlar Rough-tooled Stone Steps of trap / granite stones in lime mortar 1:1½ with size of stone [0.60 x 0.45 x 0.30 Meter] as per detailed specifications and drawings or as directed including the stones be of approved quality, colour, hard and free from defect of any kind, the stones shall be of exact size and shape, the shall be rough-tooled on exposed surface, holes for balusters should be cut in the steps before they are laid, each stone shall rest at least 3.8 cm. (1½″) on that below it, the beds or joints being in no case more than 3 mm. (⅛″), preparing the lime mortar in lime miller, watering and all steps work when handed over to be perfectly clean and free from all mortar stains etc. complete.
Providing and fixing Trap Stone Paving, Second Sort in lime mortar 1:1, with size of stone [0.45 x 0.30 x 0.20 meter], as per detailed specifications and drawings or as directed including all stone slabs to of approved quality, hard, even, sound, durable and uniform thickness, the stones to be not finely chisel-dressed on the surface and the course to be of prescribed width, true for top 25 mm. (1″), the joints running true, the stones to be laid with joints not exceeding 8 mm. (5/16″) thick and to be evenly and firmly bedded flush in mortar on the concrete and no hollow left, side to be dressed true and as per shape at least half the depth from the face, preparing the lime mortar in lime miller, watering and all paving work when handed over to be perfectly clean and free from all mortar stains etc. complete.
Providing and laying cast in situ 1:1:4 Lime Concrete of broken brick metal for coping or waterproofing as per detailed specifications and drawings or as directed including centring, formwork, laying/pumping, compacting, roughening them if special finish is to be provided, finishing if required, with fine aggregate, preparing the lime mortar in lime miller and then mixing with coursed aggregate or surkhi in drum mixer, the concrete must be bitten for two days with pouring water as per specifications, scaffolding, watering and all concrete work when handed over to be perfectly clean and free from all mortar stains, etc. complete.
Providing injection grouting with a slurry of lime and fine screened sand in proportion 1 : 1 with a proper pressurized jet pump, including cleaning, washing and packing the exisitng cracks or holes in the brick or stone masonry properly upwards with the slurry, scaffolding, curing etc. complete
Providing Lime Pointing to stone work in lime mortar 1:1 in superstructure, as per detailed specifications and drawings or as directed including all face or visible work shall be pointed, unless otherwise specified and shall be done while the mortar is fresh, the mortar shall consists of lime and fine sand shall not be ground fine but sand should be finer, the joints of the pointed work shall be neatly defined by the pointing, the lines shall be regular and uniform in breadth and the joints shall be raised or flat as may directed, preparing the lime mortar with 640 gram pulp of wood apple (Belfruit) per cubic metre of lime mortar as a bonding material, scaffolding, watering and all work when handed over to be perfectly clean and free from all mortar stains etc. complete
Providing 12 mm. thick Rough Cast Lime Plaster in single coat in lime mortar 1½:1 in superstructure, as per detailed specifications and drawings or as directed including all joints in masonry and brick work are to be racked out to a depth of at least 20 mm. and the wall to be washed with fresh water and thoroughly wetted for six hours before plastering, the plaster to be applied in an even and uniform coat well pressed in to the joints and to be well beaten for 1½ days with hand tappers, the plaster should also be well sprinkle during the proses of beating with a mixture of 1.10 kg jaggary and 640 gram pulp of wood apple (Belfruit) in 90 to 135 litre of water, the plaster being wetted occasionally with fresh water while the beating is in progress, all exposed angles and junctions with door frame to be carefully finished, all mouldings shall be worked true to template and drawn neat, clean and level, soffits of arches must true arch of circle, preparing the lime mortar in lime miller with 1.60 kg Gugal (a kind of fragrant gum) and 960 gram chopped hemp (fibre of bhendi or tag ) per cubic metre of lime mortar as a bonding material, of lime as a bonding material, scaffolding, watering and all work when handed over to be perfectly clean and free from all mortar stains etc. complete.
Providing and applying integral fine coat, with addition of colour pigments, as paint to the plain lime stucco plaster in 2 layers, including scaffolding, curing, all leads and lifts, etc. complete. 1) The first coat to be laid is a mixture of fine lime and white washing lime in proportion of 2:1,made smooth with wooden rubbers and very lightly beaten. 2)The finishing coat consisting of fine lime, white washing lime, mixed with the appropriate pigment in 1:2:1 proportion is to be applied and well polished with trowels.
Stucco work in lime, surkhi and sand (1:1:1) as per traditional practices and design, the mortar should be prepared by grinding mill only. The thickness varies from 10mm to 100mm as per design.
Providing and applying antifungal wash treatment using 3% solution of sodium pentachlorophenate, of reputed brand and manufacturer, on cleaned sand stone surface at desired locations as per direction of Engineer-in-charge (The rate is inclusive of all materials & labours involved except scaffolding).
Providing Soil Bag Support to the monument with contractor´s soil in proper layers carefully as directed by Engineer in-charge including filling, tying and conveying the bags, removing the soil bags after work up to a distance of 50 meter beyond the monument area and cleaning the site etc. complete.
Providing and fixing colour coated Zincalume ( R ) AZ150 ( min 150 gms/sq.mt. total on each side ) profiled sheets for roofing. The feed material is manufactured out of nominal 0.45 mm Base Metal Thickness ( BMT ) (0.5 mm TCT ), Hi-strength steel with min.550 MPa yield strength, metallic hot dip coated with Aluminium-Zinc alloy (55% aluminium 43.4% zinc 1.6% silicon) with COLORBOND ( R ) steel quality super durable polyester paint coat ( with inorganic pigment). The paint shall have a total coating thickness of nominal 35 um, comprising of nominal 25 um exterior coat on top surface and nominal 10 um reverse coat on back surface. Profile sheet shall have nom. 950-1050 mm effective cover width and nominal 25-30 mm deep ribs with subtle square fluting in the five pan at nominal 180-250 mm center- to-center. The end rib shall be designed for anti-capillary groove. and return leg. The feed material should have coil manufacturers product details marked a regular interval. Including fasteners with min. fastened with min. 25 um Zinc-Tin alloy coated, Hex head, self-drilling screw etc. complete. (weight of profile 4.52 Kilogram/ One Square Metre)
पारंपारिक पद्धतीची नळीची कौले बसिवणे. Providing and fixing country double half round tiled roofing with class ' AA' tiles including securing the last course of tiles near the eaves with steel flat 40 mm x 3 mm and 1.22 mm wire fixing country teak wood sloping battens 25 mm x 12 mm teak wood horizontal battens of 50x25mm on sloping battens all iron works and coal tarring the battens etc. complete. (Excluding ridge and hip tiles).
Providing and fixing Teak wood Eaves Board 15 cm.(6″) wide and 12.5 mm. (½″) thick, as per detailed specifications and drawings or as directed including the planks to be best Moulmein teak to be 12.5 mm. (½″) thick and 15 cm.(6″) in width, of a uniform colour and planed, the planks to be laid truly parallel to the floor so as to cover the end rows of the tiling and to be fixed with screws of the proper length driven countersunk, all joints to be neat and close, scaffolding etc. complete. “ It is mandatory to use well seasoned and first quality Indian Teak Wood from the Forest Department’s FDCML.”
Galvanised iron sheet 1 mm (20 B.W.G.) eaves precoated gutter 200 mm to 230 mm wide and 100 mm to 125 mm deep moulded or half round girth upto 600mm including iron rods, on the edges (throughout the length) and galvanised iron sheet ferrules with fixtures, for outlets wherever required clamped using W.I. clamp 38 mm x 3 mm fixed 1.0 m C/C including making necessary connections with rain water pipes etc complete and as directed.
Providing cultural and directional signage for information dissemination about the temple in GRC as per the design and location provided by the conservation architect.
Providing lettering as part of the signage (Cultural, directional and informatory) for information dissemination about the fort in GRC as per the design and location provided by the conservation architect.
Preparing Lawn - (30cm. Depth) Excavationg the ground to a required depth of 30 cms. Removing and conveying unwanted stuff to a required distance as directed. Filling Fresh garden Soil/ Silt and Manure in excavated area in 3:1 proportion to a height of 30cm. Mixing Garden soil and manure thoroughly, well, leveling, watering on previous night. Planting required variety of lawn grass as directed and maintaining till well established by watering, weeding, clipping, rolling etc. complete.
Maintenance of garden in all respect for keeping gardening in good condition such as weeding, cleaning, watering, cutting, gap filling, manuaring, cutting, and composting and preparation of bed plantation, trees, shrubs, flowerbed with toilet washing and cleaning for a 1 month
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.28 MB
tenderdraftnaldurgkilla.pdf
Tender Documents • 5.47 MB
BOQ_2197982.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid