| # | Company | Amount | Status |
|---|---|---|---|
| 1 | ₹99.8 LAWARDED | AWARDED |
Tender Value
₹99.8 L
EMD Value
₹2 L
Closing Date
20 May 2025, 9:30 pmClosed
Rural Drinking Water and Sanitation Department
SINKING OF BOREWELL FIXING OF MOTOR PUMPSET PROVIDING OF PIPELINE AT 32 VILLAGES OF KUSHTAGI TALUKA
RWSSD/2024-25/WT/WORK_INDENT9171
RWSSD/2024-25/WT/WORK_INDENT9171
Open
Water /sewage treatment tanks
Two Tender Document System(Two Cover)
RWSSD Division Office Koppal
₹2,500
₹2 L
5 May 2025
5 May 2025
21 May 2025
12 May 2025
SINKING OF BOREWELL 32 NOS
Sinking of Borewell of 165mm dia clear using super fast hydraulic rig
of capacity 300 PSIG & above 1100 CMF & above in all strata including
over burdern upto 20 m. Fixing of casing pipes, collars and ...
Sinking of Borewell of 165mm dia clear using super fast hydraulic rig
of capacity 300 PSIG & above 1100 CMF & above in all strata including
over burdern upto 20 m. Fixing of casing pipes, collars and ...
Sinking of Borewell of 165mm dia clear using super fast hydraulic rig
of capacity 300 PSIG & above 1100 CMF & above in all strata including
over burdern upto 20 m. Fixing of casing pipes, collars and ...
Providing PVC ringtite pipes conforming to IS 4985:2000 with latest
amendments and conveying to worksite, rolling and lowering into
trenches, laying true to line and level and perfect linking at joint...
PUMPING MACHINERY 32 NOS
Providing Submersible Pump Set of 150mm dia suitable for bore well and
confirming to IS 8034-2000;3Phase, SS Bowl & Impeller with Low volt
Motor as per specifications, to work site as per necessary am...
Supply and delivery at site Brand new best make PVC insulated cable of
Flat 3 core (sheathed) of nominal cross sectional area as per IS 694-1990
with ISI Mark and as per its latest amendments.1x3x10 S...
Supply and delivery at site of brand new best make pressure gauge
bourdon type as per IS 778/1984 with ISI Mark and as per its latest
amendments.Size 63 mm
Supply and delivery at site of brand new best make gate valve as per IS
778/1984 with ISI Mark and as per its latest amendments.Size 50 mm
Supply and delivery at site of brand new best make non-return valve as
per IS 778/1984 with ISI Mark and as per its latest amendments.Size 50 mm
Supply, installing,testing and commissioning COMMON control panel
consisting of the following INCOMING:1 No set of Phase indicating
lamps with SFU of suitable rating 1 No, Analog Ammeter, 1 No Analog
Supply and delivery at site best indigenous brand new power capacitor as
per IS 2834/1986 with latest amendments with KPTCL authorities and
erection, electrification and commissioning of the same at t...
Supply and delivery at site delivery of best indigenous brand new MCB
(Miniature Circuit Breakers) of required capacity as per IS 88228/1978
and its latest amendments and with ISI Mark of 6/10/16/20/2...
Supply and delivery at site 50mm(2”) dia heavy duty unplasticized PVC
Column pipes with heavy duty collars,rubber profile ring,vibration
control profile ring,freezing and turbulence free leak proof ...
Labour charges for Erection, Electrification and commissioning of Pump
sets, including aligning and balancing of all items including supply and
erection of two pair of supporting clamps, bore well cap...
Labour charges for erection of indoor type panel board and meter board
units with all necessary materials and labour tools and equipments
including cement concrete for foundation/bed etc,complete as p...
Labour charges for erection of outdoor type panel board and meter board
units with all necessary materials and labour, tools and equipments
including providing cement concrete foundation bed etc., com...
Labour charges for providing connection using insulated sheathed
steel wire cable as per IS 1554/ 1988 with latest amendments from KPTCL pole to meter board unit, with all necessary materialstools and...
Providing main connection from pole PVC insulated sheathed steel wire
cable in new trench as per IS 1554/ 1988 with latest amendments with
ISI mark from KPTCL pole to meter board unit.
Providing main connection from pole PVC insulated sheathed steel wire
cable in GI pipe as per IS 1554/ 1988 with latest amendments with ISI
mark from KPTCL pole to meter board unit.
Providing and fixing suitable for 1.1 KV class UG cable filled with
necessary bitumen/insulating compound complete with terminals,
clamps,bolts,nuts and washers etc. with necessary materials and labou...
Earthing: Providing and fixing and wiring earth electrode for grounding
circuits IC cutouts and other equipments on the meter board in the pit.
The pits should be filled up with equal proportion of sa...
PIPELINE WORKS 32 VILLAGES
Earth work excavation for pipelines/cables by Manual
means upto 600 mm trench width, as per drawing
and technical specifications, including setting out,
shoring, strutting, barricading, caution lights...
Earth work excavation for pipelines/cables by Manual
means upto 600 mm trench width, as per drawing
and technical specifications, including setting out,
shoring, strutting, barricading, caution lights...
Earth work excavation for pipelines/cables by Manual
means upto 600 mm trench width, as per drawing
and technical specifications, including setting out,
shoring, strutting, barricading, caution lights...
Earth work excavation for pipelines/cables by Manual
means upto 600 mm trench width, as per drawing
and technical specifications, including setting out,
shoring, strutting, barricading, caution lights...
Earth work excavation for pipelines/cables by Manual
means upto 600 mm trench width, as per drawing
and technical specifications, including setting out,
shoring, strutting, barricading, caution lights...
Earth work excavation for pipelines/cables by Manual
means upto 600 mm trench width, as per drawing
and technical specifications, including setting out,
shoring, strutting, barricading, caution lights...
Earth work excavation for pipelines/cables by Manual
means upto 600 mm trench width, as per drawing
and technical specifications, including setting out,
shoring, strutting, barricading, caution lights...
Earth work excavation for pipelines/cables by Manual
means upto 600 mm trench width, as per drawing
and technical specifications, including setting out,
shoring, strutting, barricading, caution lights...
Earth work excavation for pipelines/cables by Manual
means upto 600 mm trench width, as per drawing
and technical specifications, including setting out,
shoring, strutting, barricading, caution lights...
Earth work excavation for pipelines/cables by Manual
means upto 600 mm trench width, as per drawing
and technical specifications, including setting out,
shoring, strutting, barricading, caution lights...
Earth work excavation for pipelines/cables by Manual
means upto 600 mm trench width, as per drawing
and technical specifications, including setting out,
shoring, strutting, barricading, caution lights...
Earth work excavation for pipelines/cables by Manual
means upto 600 mm trench width, as per drawing
and technical specifications, including setting out,
shoring, strutting, barricading, caution lights...
Earth work excavation for pipelines/cables by Manual
means upto 600 mm trench width, as per drawing
and technical specifications, including setting out,
shoring, strutting, barricading, caution lights...
Earth work excavation for pipelines/cables by Manual
means upto 600 mm trench width, as per drawing
and technical specifications, including setting out,
shoring, strutting, barricading, caution lights...
Earth work excavation for pipelines/cables by Manual
means upto 600 mm trench width, as per drawing
and technical specifications, including setting out,
shoring, strutting, barricading, caution lights...
Earth work excavation for pipelines/cables by Manual
means upto 600 mm trench width, as per drawing
and technical specifications, including setting out,
shoring, strutting, barricading, caution lights...
Earth work excavation for pipelines/cables by Manual
means upto 600 mm trench width, as per drawing
and technical specifications, including setting out,
shoring, strutting, barricading, caution lights...
Earth work excavation for pipelines/cables by Manual
means upto 600 mm trench width, as per drawing
and technical specifications, including setting out,
shoring, strutting, barricading, caution lights...
Earth work excavation for pipelines/cables by Manual
means upto 600 mm trench width, as per drawing
and technical specifications, including setting out,
shoring, strutting, barricading, caution lights...
Earth work excavation for pipelines/cables by Manual
means upto 600 mm trench width, as per drawing
and technical specifications, including setting out,
shoring, strutting, barricading, caution lights...
Earth work excavation for pipelines/cables by Manual
means upto 600 mm trench width, as per drawing
and technical specifications, including setting out,
shoring, strutting, barricading, caution lights...
Earth work excavation for pipelines/cables by Manual
means upto 600 mm trench width, as per drawing
and technical specifications, including setting out,
shoring, strutting, barricading, caution lights...
Earth work excavation for pipelines/cables by Manual
means upto 600 mm trench width, as per drawing
and technical specifications, including setting out,
shoring, strutting, barricading, caution lights...
Earth work excavation for pipelines/cables by Manual
means upto 600 mm trench width, as per drawing
and technical specifications, including setting out,
shoring, strutting, barricading, caution lights...
Earth work excavation for pipelines/cables by Manual
means upto 600 mm trench width, as per drawing
and technical specifications, including setting out,
shoring, strutting, barricading, caution lights...
Earth work excavation for pipelines/cables by Manual
means upto 600 mm trench width, as per drawing
and technical specifications, including setting out,
shoring, strutting, barricading, caution lights...
Earth work excavation for pipelines/cables by Manual
means upto 600 mm trench width, as per drawing
and technical specifications, including setting out,
shoring, strutting, barricading, caution lights...
Earth work excavation for pipelines/cables by Manual
means upto 600 mm trench width, as per drawing
and technical specifications, including setting out,
shoring, strutting, barricading, caution lights...
Earth work excavation for pipelines/cables by Manual
means upto 600 mm trench width, as per drawing
and technical specifications, including setting out,
shoring, strutting, barricading, caution lights...
Earth work excavation for pipelines/cables by Manual
means upto 600 mm trench width, as per drawing
and technical specifications, including setting out,
shoring, strutting, barricading, caution lights...
Earth work excavation for pipelines/cables by Manual
means upto 600 mm trench width, as per drawing
and technical specifications, including setting out,
shoring, strutting, barricading, caution lights...
Earth work excavation for pipelines/cables by Manual
means upto 600 mm trench width, as per drawing
and technical specifications, including setting out,
shoring, strutting, barricading, caution lights...
Providing and installing at site of work P.V.C. pipes including cost of pipes
and specials and labour, including lowering into trenches, laying true
to line, level and perfect linking at joints leak p...
Providing and installing at site of work P.V.C. pipes including cost of pipes
and specials and labour, including lowering into trenches, laying true
to line, level and perfect linking at joints leak p...
Providing and installing at site of work P.V.C. pipes including cost of pipes
and specials and labour, including lowering into trenches, laying true
to line, level and perfect linking at joints leak p...
Providing and installing at site of work P.V.C. pipes including cost of pipes
and specials and labour, including lowering into trenches, laying true
to line, level and perfect linking at joints leak p...
Providing and installing at site of work P.V.C. pipes including cost of pipes
and specials and labour, including lowering into trenches, laying true
to line, level and perfect linking at joints leak p...
Providing and installing at site of work P.V.C. pipes including cost of pipes
and specials and labour, including lowering into trenches, laying true
to line, level and perfect linking at joints leak p...
Providing and installing at site of work P.V.C. pipes including cost of pipes
and specials and labour, including lowering into trenches, laying true
to line, level and perfect linking at joints leak p...
Providing and installing at site of work P.V.C. pipes including cost of pipes
and specials and labour, including lowering into trenches, laying true
to line, level and perfect linking at joints leak p...
Providing and installing at site of work P.V.C. pipes including cost of pipes
and specials and labour, including lowering into trenches, laying true
to line, level and perfect linking at joints leak p...
Providing and installing at site of work P.V.C. pipes including cost of pipes
and specials and labour, including lowering into trenches, laying true
to line, level and perfect linking at joints leak p...
Providing and installing at site of work P.V.C. pipes including cost of pipes
and specials and labour, including lowering into trenches, laying true
to line, level and perfect linking at joints leak p...
Providing and installing at site of work P.V.C. pipes including cost of pipes
and specials and labour, including lowering into trenches, laying true
to line, level and perfect linking at joints leak p...
Providing and installing at site of work P.V.C. pipes including cost of pipes
and specials and labour, including lowering into trenches, laying true
to line, level and perfect linking at joints leak p...
Providing and installing at site of work P.V.C. pipes including cost of pipes
and specials and labour, including lowering into trenches, laying true
to line, level and perfect linking at joints leak p...
Providing and installing at site of work P.V.C. pipes including cost of pipes
and specials and labour, including lowering into trenches, laying true
to line, level and perfect linking at joints leak p...
Providing and installing at site of work P.V.C. pipes including cost of pipes
and specials and labour, including lowering into trenches, laying true
to line, level and perfect linking at joints leak p...
Providing and installing at site of work P.V.C. pipes including cost of pipes
and specials and labour, including lowering into trenches, laying true
to line, level and perfect linking at joints leak p...
Providing and installing at site of work P.V.C. pipes including cost of pipes
and specials and labour, including lowering into trenches, laying true
to line, level and perfect linking at joints leak p...
Providing and installing at site of work P.V.C. pipes including cost of pipes
and specials and labour, including lowering into trenches, laying true
to line, level and perfect linking at joints leak p...
Providing and installing at site of work P.V.C. pipes including cost of pipes
and specials and labour, including lowering into trenches, laying true
to line, level and perfect linking at joints leak p...
Providing and installing at site of work P.V.C. pipes including cost of pipes
and specials and labour, including lowering into trenches, laying true
to line, level and perfect linking at joints leak p...
Providing and installing at site of work P.V.C. pipes including cost of pipes
and specials and labour, including lowering into trenches, laying true
to line, level and perfect linking at joints leak p...
Providing and installing at site of work P.V.C. pipes including cost of pipes
and specials and labour, including lowering into trenches, laying true
to line, level and perfect linking at joints leak p...
Providing and installing at site of work P.V.C. pipes including cost of pipes
and specials and labour, including lowering into trenches, laying true
to line, level and perfect linking at joints leak p...
Providing and installing at site of work P.V.C. pipes including cost of pipes
and specials and labour, including lowering into trenches, laying true
to line, level and perfect linking at joints leak p...
Providing and installing at site of work P.V.C. pipes including cost of pipes
and specials and labour, including lowering into trenches, laying true
to line, level and perfect linking at joints leak p...
Providing and installing at site of work P.V.C. pipes including cost of pipes
and specials and labour, including lowering into trenches, laying true
to line, level and perfect linking at joints leak p...
Providing and installing at site of work P.V.C. pipes including cost of pipes
and specials and labour, including lowering into trenches, laying true
to line, level and perfect linking at joints leak p...
Providing and installing at site of work P.V.C. pipes including cost of pipes
and specials and labour, including lowering into trenches, laying true
to line, level and perfect linking at joints leak p...
Providing and installing at site of work P.V.C. pipes including cost of pipes
and specials and labour, including lowering into trenches, laying true
to line, level and perfect linking at joints leak p...
Providing and installing at site of work P.V.C. pipes including cost of pipes
and specials and labour, including lowering into trenches, laying true
to line, level and perfect linking at joints leak p...
Providing and installing at site of work P.V.C. pipes including cost of pipes
and specials and labour, including lowering into trenches, laying true
to line, level and perfect linking at joints leak p...
Refilling available earth around trenches/pipelines, cables in layers not
exceeding 20 cms in depth, compacting each deposited layer by ramming after
watering with a lead upto 50 m, and lift upto 1.5 ...
Refilling available earth around trenches/pipelines, cables in layers not
exceeding 20 cms in depth, compacting each deposited layer by ramming after
watering with a lead upto 50 m, and lift upto 1.5 ...
Refilling available earth around trenches/pipelines, cables in layers not
exceeding 20 cms in depth, compacting each deposited layer by ramming after
watering with a lead upto 50 m, and lift upto 1.5 ...
Refilling available earth around trenches/pipelines, cables in layers not
exceeding 20 cms in depth, compacting each deposited layer by ramming after
watering with a lead upto 50 m, and lift upto 1.5 ...
Refilling available earth around trenches/pipelines, cables in layers not
exceeding 20 cms in depth, compacting each deposited layer by ramming after
watering with a lead upto 50 m, and lift upto 1.5 ...
Refilling available earth around trenches/pipelines, cables in layers not
exceeding 20 cms in depth, compacting each deposited layer by ramming after
watering with a lead upto 50 m, and lift upto 1.5 ...
Refilling available earth around trenches/pipelines, cables in layers not
exceeding 20 cms in depth, compacting each deposited layer by ramming after
watering with a lead upto 50 m, and lift upto 1.5 ...
Refilling available earth around trenches/pipelines, cables in layers not
exceeding 20 cms in depth, compacting each deposited layer by ramming after
watering with a lead upto 50 m, and lift upto 1.5 ...
Refilling available earth around trenches/pipelines, cables in layers not
exceeding 20 cms in depth, compacting each deposited layer by ramming after
watering with a lead upto 50 m, and lift upto 1.5 ...
Refilling available earth around trenches/pipelines, cables in layers not
exceeding 20 cms in depth, compacting each deposited layer by ramming after
watering with a lead upto 50 m, and lift upto 1.5 ...
Refilling available earth around trenches/pipelines, cables in layers not
exceeding 20 cms in depth, compacting each deposited layer by ramming after
watering with a lead upto 50 m, and lift upto 1.5 ...
Refilling available earth around trenches/pipelines, cables in layers not
exceeding 20 cms in depth, compacting each deposited layer by ramming after
watering with a lead upto 50 m, and lift upto 1.5 ...
Refilling available earth around trenches/pipelines, cables in layers not
exceeding 20 cms in depth, compacting each deposited layer by ramming after
watering with a lead upto 50 m, and lift upto 1.5 ...
Refilling available earth around trenches/pipelines, cables in layers not
exceeding 20 cms in depth, compacting each deposited layer by ramming after
watering with a lead upto 50 m, and lift upto 1.5 ...
Refilling available earth around trenches/pipelines, cables in layers not
exceeding 20 cms in depth, compacting each deposited layer by ramming after
watering with a lead upto 50 m, and lift upto 1.5 ...
Refilling available earth around trenches/pipelines, cables in layers not
exceeding 20 cms in depth, compacting each deposited layer by ramming after
watering with a lead upto 50 m, and lift upto 1.5 ...
Refilling available earth around trenches/pipelines, cables in layers not
exceeding 20 cms in depth, compacting each deposited layer by ramming after
watering with a lead upto 50 m, and lift upto 1.5 ...
Refilling available earth around trenches/pipelines, cables in layers not
exceeding 20 cms in depth, compacting each deposited layer by ramming after
watering with a lead upto 50 m, and lift upto 1.5 ...
Refilling available earth around trenches/pipelines, cables in layers not
exceeding 20 cms in depth, compacting each deposited layer by ramming after
watering with a lead upto 50 m, and lift upto 1.5 ...
Refilling available earth around trenches/pipelines, cables in layers not
exceeding 20 cms in depth, compacting each deposited layer by ramming after
watering with a lead upto 50 m, and lift upto 1.5 ...
Refilling available earth around trenches/pipelines, cables in layers not
exceeding 20 cms in depth, compacting each deposited layer by ramming after
watering with a lead upto 50 m, and lift upto 1.5 ...
Refilling available earth around trenches/pipelines, cables in layers not
exceeding 20 cms in depth, compacting each deposited layer by ramming after
watering with a lead upto 50 m, and lift upto 1.5 ...
Refilling available earth around trenches/pipelines, cables in layers not
exceeding 20 cms in depth, compacting each deposited layer by ramming after
watering with a lead upto 50 m, and lift upto 1.5 ...
Refilling available earth around trenches/pipelines, cables in layers not
exceeding 20 cms in depth, compacting each deposited layer by ramming after
watering with a lead upto 50 m, and lift upto 1.5 ...
Refilling available earth around trenches/pipelines, cables in layers not
exceeding 20 cms in depth, compacting each deposited layer by ramming after
watering with a lead upto 50 m, and lift upto 1.5 ...
Refilling available earth around trenches/pipelines, cables in layers not
exceeding 20 cms in depth, compacting each deposited layer by ramming after
watering with a lead upto 50 m, and lift upto 1.5 ...
Refilling available earth around trenches/pipelines, cables in layers not
exceeding 20 cms in depth, compacting each deposited layer by ramming after
watering with a lead upto 50 m, and lift upto 1.5 ...
Refilling available earth around trenches/pipelines, cables in layers not
exceeding 20 cms in depth, compacting each deposited layer by ramming after
watering with a lead upto 50 m, and lift upto 1.5 ...
Refilling available earth around trenches/pipelines, cables in layers not
exceeding 20 cms in depth, compacting each deposited layer by ramming after
watering with a lead upto 50 m, and lift upto 1.5 ...
Refilling available earth around trenches/pipelines, cables in layers not
exceeding 20 cms in depth, compacting each deposited layer by ramming after
watering with a lead upto 50 m, and lift upto 1.5 ...
Refilling available earth around trenches/pipelines, cables in layers not
exceeding 20 cms in depth, compacting each deposited layer by ramming after
watering with a lead upto 50 m, and lift upto 1.5 ...
Refilling available earth around trenches/pipelines, cables in layers not
exceeding 20 cms in depth, compacting each deposited layer by ramming after
watering with a lead upto 50 m, and lift upto 1.5 ...
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .