Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹19.2 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹21 L+₹1.8 L (9.49%)Rejected-Finance RAHEJA NIWAS 243 GHORPADE PETH PUNE 411 042 | PUNE | PUNE | MAHARASHTRA | 411042 | L2 | Rejected-Finance Not Reasonable | |
| 3 | L3₹22.9 L+₹3.7 L (19.3%)Rejected-Finance 46 HUSENI LAKDA BAZAAR 242 BELLASIS ROAD MUMBAI 400008 | MUMBAI | MAHARASHTRA | 400008 | L3 | Rejected-Finance Not Reasonable | |
| 4 | L4₹33.8 L+₹14.6 L (76.3%)Rejected-Finance 106 AGARWAL AND COMPANY PROFESSOR COLONY OPP OF WALL FORT CITY RING ROAD NO 01 RAIPUR CHHATTISGARH 492001 | RAIPUR | CHHATTISGARH | 492001 | L4 | Rejected-Finance Not Reasonable | |
| 5 | L5₹36.6 L+₹17.5 L (91.0%)Rejected-Finance | L5 | Rejected-Finance Not Reasonable |
Tender Value
₹44.5 L
EMD Value
₹89,000
Closing Date
6 Mar 2023, 6:00 pmClosed
Saurabh Gupta, EE
GE(W) Colaba, Mumbai
MAINTENANCE OF ALMIRAH AND OTHER FURNITURE AT OTM / MD BUILDINGS AT COLABA UNDER GE (WEST) COLABA, MUMBAI
2023_MES_579778_1
8714/E8
Open Tender
Civil Works
Item Rate
180 days
GE(W) Colaba
Please refer Tender documents.
7 documents required · 7 mandatory
₹500
GE(W) Colaba, Mumbai
₹89,000
Yes
23 Mar 2023
8 Feb 2023
8 Mar 2023
8 Feb 2023
6 Mar 2023
21 Feb 2023
Amount
Table office Officers steel FD-1003/ similar pattern by removing the existing unserviceable part and S&F following similar new parts as per Drg
Hard Top sheet
Drawer
shutter with hinges
Top/bottom long stiffner
Top/bottom short stiffner
Locks
Rubber shoes
Preparation/cleaning of existing decorated surface/rubbing by emery paper, removing all spots, filling all cavity with putty and one coat of synthetic enamel paint for repaired and existing good furniture at furniture yard/Md/OTM buildings under GE (W) Colaba and all as directed by BSO
M&L for running welding (not exceeding 25mm each) of steel items including scraping, preparing surface of welded portion by grinding all as directed by BSO
Form without back (steel frame) FD-77/similar patern, removing the existing unserviceable part and S&F following similar new part as per Drg
Seat plank complete with french polish
Centre support stiffners complete
Top/Bottom short stiffner
Rubber shoes
Preparation/cleaning of existing decorated surface/rubbing by emery paper, removing all spots, filling all cavity with putty one coat of synthetic enamel paint for repaired and existing good furniture at furniture yard/Md/OTM buildings under GE (W) Colaba and all as directed by BSO
M&L for running welding (not exceeding 25mm each) of steel items including scraping preparing surface of welded portion by grinding all as directed by BSO
Chair verandah FD-259 (folding)/similar pattern, removing the existing unserviceable part and S&F following similar new part as per Drg/MAP
seat frame
Back frame
Arm rest
Screw with washers
Flat aluminium gusser
Flat aluminium stay
Stiffner
Rubber shoe/packing
Niwar canning of seat
Niwar canning of back
Preparation/cleaning of existing decorated surface/rubbing by emery paper, removing all spots, filling with putty, silver/aluminium painting for repaired and existing good furniture as directed at site
Almirah Large Steel with four shelf : DRG NO FD-1031
M&L for spot welding/running welding not exceeding 2.5 cm in length to steel items made of steel sheet including scrapping, preparing surfaces, grinding complete all as specified and directed
Removing the unserviceable leg and S & F the new leg in the furniture (Almirah large steel) as per drawing No FD-1031 complete all as specifed and directed
Removing the unserviceable shelf and S&F the new shelf in the furniture (Almirah large steel) as per drawing No FD-1031 complete all as specifed and directed
Removing the unserviceable cleat for shelf in the furniture (Almirah large steel) as per drawing No FD-1031 complete all as specifed and as directed
Removing the unserviceable hinge and S&F the new hinge in the furniture (Almirah large steel) as per drawing No FD-1031 complete all as specifed and directed
Removing the unserviceable shutters left/right sheet and S&F the new shutters left/right in the furniture (Almirah large steel) as per drawing No FD-1031 complete all as specifed and directed
Removing the unserviceable handle and S&F the new handle in the furniture (Almirah large steel) as per drawing No FD-1031 complete all as specifed and directed
Removing the unserviceable locks and S&F the new locks in the furniture (Almirah large steel) as per drawing No FD-1031 complete all as specifed and directed
Removing the unserviceable locking vertical rod complete assembly and S&F the new locking vertical rod complete assembly in the furniture (Almirah large steel) as per drawing No FD-1031 all as specifed and directed
Preparing steel surfaces and applying two coats of synthetic enamel olive green shade over a coat of primer with spray machine in the furniture (Almirah large steel) as per drawing No FD-1031 all as specifed and directed
M&L for repairs of dents on steel surfaces of furniture all as specified and directed
Almirah Medium Steel with four shelf : DRG NO FD-1032
Removing the unserviceable leg and S&F the new leg in the furniture (Almirah small/medium steel) as per drawing No FD-1032 all as specifed and directed
Removing the unserviceable shelf and S&F the new shelf in the furniture (Almirah small/medium steel) as per drawing No FD-1032 all as specifed and directed
Removing the unserviceable cleat for shelf and S&F the new shelf in the furniture (Almirah small/medium steel) as per drawing No FD-1032 all as specifed and directed
Removing the unserviceable hinge and S&F the new hinge in the furniture (Almirah small/medium steel) as per drawing No FD-1032 all as specifed and directed
Removing the unserviceable shutters left/right sheet and S&F the new shutters left/right sheet in the furniture (Almirah small/medium steel) as per drawing No FD-1032 all as specifed and directed
Removing the unserviceable handle and S&F the new handle in the furniture (Almirah small/medium steel) as per drawing No FD-1032 all as specifed and directed
Removing the unserviceable locks and S&F the new locks in the furniture (Almirah small/medium steel) as per drawing No FD-1032 all as specifed and directed
Removing the unserviceable locking vertical rod complete assembly and S&F the new locking vertical rod complete assembly in the furniture (Almirah small/medium steel) as per drawing No FD-1032 all as specifed and directed
Preparing steel surfaces and applying two coats of synthetic enamel olive green shade over a coat of primer with spray machine in the furniture (Almirah small/medium steel) as per drawing No FD-1032 all as specifed and directed
Locker Steel with four shelf : DRG NO FD-1029
Removing the unserviceable leg and S&F the new leg in the furniture (locker steel) as per drawing No FD-1029 all as specifed and directed
Removing the unserviceable shelf and S&F the new shelf in the furniture (locker steel) as per drawing No FD-1029 all as specifed and directed
Removing the unserviceable cleat for shelf and S&F the new cleat for shelf in the furniture (locker steel) as per drawing No FD-1029 all as specifed and directed
Removing the unserviceable conduit pipe and S&F the new conduit pipe in the furniture (locker steel) as per drawing No FD-1029 all as specifed and directed
Removing the unserviceable handle and S&F the new handle in the furniture (locker steel) as per drawing No FD-1029 all as specifed and directed
Removing the unserviceable hasp and staple and S&F the new hasp and staple in the furniture (locker steel) as per drawing No FD-1029 all as specifed and directed
Preparing steel surfaces and applying two coats of synthetic enamel olive green shade over a coat of primer with spray machine in the furniture (locker steel) as per drawing No FD-1029 all as specifed and directed
Charpoy steel with hard top : DRG NO FD/MAP-II/01
Removing the unserviceable stiffener and S&F the new stiffener in the furniture (charpoy steel hard top) drawing No FD/MAP-II/01 all as specified and directed
Removing the unserviceable long rail and S&F the new long rail in the furniture (Charpoy steel hard top) as per drawing No FD/MAP-II/01 all as specified and directed
Removing the unserviceable short rail and S&F the new short rail in the furniture (Charpoy steel hard top) as per drawing No FD/MAP-II/01 all as specified and directed
Removing the unserviceable leg and S&F the new leg in the furniture (Charpoy steel hard top) as per drawing No FD/MAP-II/01 all as specified and directed
Removing the unserviceable top ply wood and S&F the new top ply wood in the furniture (Charpoy steel hard top) as per drawing No FD/MAP-II/01 all as specified and directed
Preparing steel or wooden surfaces and applying French polich (glossy finish) to all exposed wooden surfaces and two coats of synthetic enamel paints over one coat of primer including scrapping old paint, sanding, applying putty to steel surfaces in the furniture (charpoy hard top) as per drawing No FD/MAP-II/01 all as specified and as directed.
Charpoy GI pipe FD-220/similar pattern
Removing the existing all unserviceable ply from frame of charpoy, tightening/refixing the serviceable loose parts of frames, supply & fixing 1948mm Long x 868mm wide single piece fresh new plywood 12mm thick MR grade along with flush/countersunk bolt (06 Nos in Qty ) of dia 10mm, length 50mm and bolt top must be flat and of dia 25mm. Each bolt must consists of two cup washers & one nut. Hole on ply for fixinig bolt must be made at a distance of two inch from centre of long rail.
Removing the existing all unserviceable all MS cleats and supply and fixing 60mmx30mmx5mm MS cleats.
Removing the existing all unserviceable all MS angles, and supply and fixing MS angles of 25mmx25mm having 5mm thickness and of length 868mm.
Removing the existing unserveceable long rail from charpoy GI pipe, tightening all loose parts and S&F long rail made of GI pipe 32mm dia medium Grade ISI marked duly threaded both ends and fixing to charpoy all as per Drg FD-220/Similar pattern all as directed.
Manufacturing of short rail made out of unserveceable long rail, duly threaded both ends and proper fixing in charpoy GI and tightening all loose parts after removing existing unserveceable short rail carefully without damaging/disturbing other parts all as per Drg FD-220/Similar pattern all as directed.
Manufacturing of legs made out of unserveceable short rail, duly threaded one end and proper fixing in charpoy GI and tightening all loose parts after removing existing unserveceable leg rail carefully without damaging/disturbing other parts all as per Drg FD-220/Similar pattern all as directed.
Removing unserveceable elbow and S&F GI elbow 32 mm bore and tightening all loose parts as per Drg FD-220/Similar pattern all as directed.
Removing unserveceable check nut and S&F GI check nut and tightening all loose parts as per Drg FD-220/Similar pattern all as directed.
Table 3'x2' steel FD-1008, 1007 similar patern, removing the existing unserviceable part and S&F following similar new part as per Drg
Hard top sheet
Rubber shoe
Top/Bottom long stiffner
Top/Bottom short stiffner
Drawer for FD -1008 only
Preparation/cleaning of existing decorated surface/rubbing by emery paper, removing all spots, filling all cavity with putty one coat of synthetic enamel paint for repaired and existing good furniture at furniture yard/Md/OTM buildings under GE (W) Colaba and all as directed by BSO
Material and labour for running welding (not exceeding 25mm each) of steel items including scraping preparing surface of welded portion by grinding all as directed by BSO
Table 3'x3' steel FD-1009/ similar patern, removing the existing unserviceable part and S&F following similar new part as per Drg
Hard top sheet
Rubber shoe
Stifner
Preparation/cleaning of existing decorated surface/rubbing by emery paper, removing all spots, filling all cavity with putty and one coat of synthetic enamel paint for repaired and existing good furniture at furniture yard/Md/OTM buildings under GE (W) Colaba and all as directed by BSO
Material and labour for running welding (not exceeding 25mm each) of steel items including scraping preparing surface of welded portion by grinding all as directed by BSO
Table office clerk steel FD-1004/ similar patern, removing the existing unserviceable part and S&F following similar new part as per Drg
Hard Top sheet
Drawer
Locks
Top/Bottom long stifner
Top/Bottom short stifner
Rubber shoe
Preparation/cleaning of existing decorated surface/rubbing by emery paper, removing all spots, filling all cavity with putty one coat of synthetic enamel paint for repaired and existing good furniture at furniture yard/Md/OTM buildings under GE (W) Colaba and all as directed by BSO
Material and labour for running welding (not exceeding 25mm each) of steel items including scraping preparing surface of welded portion by grinding all as directed by BSO
Bidder Name
Unitech Enterprises
Mahesh Traders
agarwal and company
M/s. SHRI SAINATH ENTERPRISES
M/s SK Construction
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .