Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹50,000
Closing Date
25 Jul 2022, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
ADDITIONAL COLLECTOR (D) MADURAI
0/0 ADDITIONAL COLLECTOR (D) DRDA MADURAI COLLECTORATE MADURAI -625020
Construction of Drainage and Soak Pits _ 12 nos. in AGAMT-II-2021-22 Village panchayats of Chellampatti Block in Madurai District in Package no.CHELM_05
2022_RDTN_238037_1
568/2022/D7 /Chell05/24.06.22
Open Tender
Civil Works
Item Rate
180 days
Chellampatti
Refer Tender document
4 documents required · 4 mandatory
₹0
₹50,000
1 Aug 2022
7 Jul 2022
25 Jul 2022
7 Jul 2022
25 Jul 2022
8 Jul 2022
90 days
Amount
Construction of drainage with Soak Pit in South Street@ Kesavanpatti Village in Karumathur Panchayat
Construction of Drainage:
Earthwork excavation in Ordinary Soil - Earthwork excavating and depositing with in initial lead of 10m and lift of 2m (Forroads, supply channels, desilting of MI Tanks, Pond & Kulam) - 0 to 0.30 m depth
Cement Concrete 1:4:8 mix (one cement, four sand, eight hard broken stone) using 40mm ISS HBG stone jelly for Foundation and flooring including labour charges for mixing concrete watring and laying the concrete complying with standard specifications etc complete.
Cement Concrete in 1 : 3 : 6 mix using 20 mm metal including cost and conveyance of all materials to site and labour charges etc complete
Supplying and errecting shuttering including necessary support for plane surface using steel shuttering for sides of CC pavement including all cost and conveyance of material and labour charges etc complete.
Plastering with cement mortar 1:4mix to 20 mm thick includingcost and conveyance of all materials to site and all labour
Construction of drainage with Vertical Soak Pit in Middle Street@ Kesavanpatti Village in Karumathur Panchayat
Construction of Drainage:
Earthwork excavation in Ordinary Soil - Earthwork excavating and depositing with in initial lead of 10m and lift of 2m (Forroads, supply channels, desilting of MI Tanks, Pond & Kulam) - 0 to 0.30 m depth
Cement Concrete 1:4:8 mix (one cement, four sand, eight hard broken stone) using 40mm ISS HBG stone jelly for Foundation and flooring including labour charges for mixing concrete watring and laying the concrete complying with standard specifications etc complete.
Cement Concrete in 1 : 3 : 6 mix using 20 mm metal including cost and conveyance of all materials to site and labour charges etc complete
Supplying and errecting shuttering including necessary support for plane surface using steel shuttering for sides of CC pavement including all cost and conveyance of material and labour charges etc complete.
Plastering with cement mortar 1:4mix to 20 mm thick includingcost and conveyance of all materials to site and all labour
Construction of drainage with Soak Pit in East Street@ Kesavanpatti Village in Karumathur Panchayat
Construction of Drainage:
Earthwork excavation in Ordinary Soil - Earthwork excavating and depositing with in initial lead of 10m and lift of 2m (Forroads, supply channels, desilting of MI Tanks, Pond & Kulam) - 0 to 0.30 m depth
Cement Concrete 1:4:8 mix (one cement, four sand, eight hard broken stone) using 40mm ISS HBG stone jelly for Foundation and flooring including labour charges for mixing concrete watring and laying the concrete complying with standard specifications etc complete.
Cement Concrete in 1 : 3 : 6 mix using 20 mm metal including cost and conveyance of all materials to site and labour charges etc complete
Supplying and errecting shuttering including necessary support for plane surface using steel shuttering for sides of CC pavement including all cost and conveyance of material and labour charges etc complete.
Plastering with cement mortar 1:4mix to 20 mm thick includingcost and conveyance of all materials to site and all labour
Construction of drainage with Vertical Soak Pit in West Street@ Kesavanpatti Village in Karumathur Panchayat
Construction of Drainage:
Earthwork excavation in Ordinary Soil - Earthwork excavating and depositing with in initial lead of 10m and lift of 2m (Forroads, supply channels, desilting of MI Tanks, Pond & Kulam) - 0 to 0.30 m depth
Cement Concrete 1:4:8 mix (one cement, four sand, eight hard broken stone) using 40mm ISS HBG stone jelly for Foundation and flooring including labour charges for mixing concrete watring and laying the concrete complying with standard specifications etc complete.
Cement Concrete in 1 : 3 : 6 mix using 20 mm metal including cost and conveyance of all materials to site and labour charges etc complete
Supplying and errecting shuttering including necessary support for plane surface using steel shuttering for sides of CC pavement including all cost and conveyance of material and labour charges etc complete.
Plastering with cement mortar 1:4mix to 20 mm thick includingcost and conveyance of all materials to site and all labour
Construction of drainage with Vertical Soak Pit in Vikkiramangalam Main Road Street@ Vikkiramangalam Village and Panchayat
Construction of Drainage:
Earthwork excavation in Ordinary Soil - Earthwork excavating and depositing with in initial lead of 10m and lift of 2m (Forroads, supply channels, desilting of MI Tanks, Pond & Kulam) - 0 to 0.30 m depth
Cement Concrete 1:4:8 mix (one cement, four sand, eight hard broken stone) using 40mm ISS HBG stone jelly for Foundation and flooring including labour charges for mixing concrete watring and laying the concrete complying with standard specifications etc complete.
Cement Concrete in 1 : 3 : 6 mix using 20 mm metal including cost and conveyance of all materials to site and labour charges etc complete
Supplying and errecting shuttering including necessary support for plane surface using steel shuttering for sides of CC pavement including all cost and conveyance of material and labour charges etc complete.
Plastering with cement mortar 1:4mix to 20 mm thick includingcost and conveyance of all materials to site and all labour
Construction of drainage with Vertical Soak Pit@ Kattadevanpatti Village in Veppanauthu Panchayat
Construction of Drainage:
Earthwork excavation in Ordinary Soil - Earthwork excavating and depositing with in initial lead of 10m and lift of 2m (Forroads, supply channels, desilting of MI Tanks, Pond & Kulam) - 0 to 0.30 m depth
Cement Concrete 1:4:8 mix (one cement, four sand, eight hard broken stone) using 40mm ISS HBG stone jelly for Foundation and flooring including labour charges for mixing concrete watring and laying the concrete complying with standard specifications etc complete.
Cement Concrete in 1 : 3 : 6 mix using 20 mm metal including cost and conveyance of all materials to site and labour charges etc complete
Supplying and errecting shuttering including necessary support for plane surface using steel shuttering for sides of CC pavement including all cost and conveyance of material and labour charges etc complete.
Plastering with cement mortar 1:4mix to 20 mm thick includingcost and conveyance of all materials to site and all labour
Construction of drainage with Vertical Soak Pit in Keelapatti Main Street@ Keelapatti Village in Mudalaikulam Panchayat
Construction of Drainage:
Earthwork excavation in Ordinary Soil - Earthwork excavating and depositing with in initial lead of 10m and lift of 2m (Forroads, supply channels, desilting of MI Tanks, Pond & Kulam) - 0 to 0.30 m depth
Cement Concrete 1:4:8 mix (one cement, four sand, eight hard broken stone) using 40mm ISS HBG stone jelly for Foundation and flooring including labour charges for mixing concrete watring and laying the concrete complying with standard specifications etc complete.
Cement Concrete in 1 : 3 : 6 mix using 20 mm metal including cost and conveyance of all materials to site and labour charges etc complete
Supplying and errecting shuttering including necessary support for plane surface using steel shuttering for sides of CC pavement including all cost and conveyance of material and labour charges etc complete.
Plastering with cement mortar 1:4mix to 20 mm thick includingcost and conveyance of all materials to site and all labour
Construction of drainage with Small Culvert and Soak Pit in Keelapatti(Ayyampatti Village)@ Keelapatti Village in Mudalaikulam Panchayat
Construction of Drainage:
Earthwork excavation in Ordinary Soil - Earthwork excavating and depositing with in initial lead of 10m and lift of 2m (Forroads, supply channels, desilting of MI Tanks, Pond & Kulam) - 0 to 0.30 m depth
Cement Concrete 1:4:8 mix (one cement, four sand, eight hard broken stone) using 40mm ISS HBG stone jelly for Foundation and flooring including labour charges for mixing concrete watring and laying the concrete complying with standard specifications etc complete.
Cement Concrete in 1 : 3 : 6 mix using 40 mm metal including cost and onveyance of all materials to site and labour charges etc complete
Cement Concrete in 1 : 3 : 6 mix using 20 mm metal including cost and conveyance of all materials to site and labour charges etc complete
Supplying and errecting shuttering including necessary support for plane surface using steel shuttering for sides of CC pavement including all cost and conveyance of material and labour charges etc complete.
Supplying and fabrication of steel including all cost and conveyance etc., completed
RCement Concrete in 1 : 1.5 : 3 mix using 20 mm metal including cost and onveyance of all materials to site and labour charges etc complete
Plastering with cement mortar 1:4mix to 20 mm thick includingcost and conveyance of all materials to site and all labour
Construction of drainage with Small Culvert and Soak Pit in East Main Street@ Nadumudalaikulam Village in Mudalaikulam Panchayat
Construction of Drainage:
Earthwork excavation in Ordinary Soil - Earthwork excavating and depositing with in initial lead of 10m and lift of 2m (Forroads, supply channels, desilting of MI Tanks, Pond & Kulam) - 0 to 0.30 m depth
Cement Concrete 1:4:8 mix (one cement, four sand, eight hard broken stone) using 40mm ISS HBG stone jelly for Foundation and flooring including labour charges for mixing concrete watring and laying the concrete complying with standard specifications etc complete.
Cement Concrete in 1 : 3 : 6 mix using 40 mm metal including cost and onveyance of all materials to site and labour charges etc complete
Cement Concrete in 1 : 3 : 6 mix using 20 mm metal including cost and conveyance of all materials to site and labour charges etc complete
Supplying and errecting shuttering including necessary support for plane surface using steel shuttering for sides of CC pavement including all cost and conveyance of material and labour charges etc complete.
Supplying and fabrication of steel including all cost and conveyance etc., completed
RCement Concrete in 1 : 1.5 : 3 mix using 20 mm metal including cost and onveyance of all materials to site and labour charges etc complete
Plastering with cement mortar 1:4mix to 20 mm thick includingcost and conveyance of all materials to site and all labour
Construction of drainage with Soak Pit in Vinayagar Kovil Cross Street@ Sadachipatti Village and Panchayat
Construction of Drainage:
Earthwork excavation in Ordinary Soil - Earthwork excavating and depositing with in initial lead of 10m and lift of 2m (Forroads, supply channels, desilting of MI Tanks, Pond & Kulam) - 0 to 0.30 m depth
Cement Concrete 1:4:8 mix (one cement, four sand, eight hard broken stone) using 40mm ISS HBG stone jelly for Foundation and flooring including labour charges for mixing concrete watring and laying the concrete complying with standard specifications etc complete.
Cement Concrete in 1 : 3 : 6 mix using 20 mm metal including cost and conveyance of all materials to site and labour charges etc complete
Supplying and errecting shuttering including necessary support for plane surface using steel shuttering for sides of CC pavement including all cost and conveyance of material and labour charges etc complete.
Plastering with cement mortar 1:4mix to 20 mm thick includingcost and conveyance of all materials to site and all labour
Construction of drainage with Vertical Soak Pit in Middle Street@ Sadachipatti Village and Panchayat
Construction of Drainage:
Earthwork excavation in Ordinary Soil - Earthwork excavating and depositing with in initial lead of 10m and lift of 2m (Forroads, supply channels, desilting of MI Tanks, Pond & Kulam) - 0 to 0.30 m depth
Cement Concrete 1:4:8 mix (one cement, four sand, eight hard broken stone) using 40mm ISS HBG stone jelly for Foundation and flooring including labour charges for mixing concrete watring and laying the concrete complying with standard specifications etc complete.
Cement Concrete in 1 : 3 : 6 mix using 20 mm metal including cost and conveyance of all materials to site and labour charges etc complete
Supplying and errecting shuttering including necessary support for plane surface using steel shuttering for sides of CC pavement including all cost and conveyance of material and labour charges etc complete.
Plastering with cement mortar 1:4mix to 20 mm thick includingcost and conveyance of all materials to site and all labour
Construction of drainage with Vertical Soak Pit and Lid in Main Road Street@ Kattakaruppanpatti Village and Panchayat
Construction of Drainage:
Earthwork excavation in Ordinary Soil - Earthwork excavating and depositing with in initial lead of 10m and lift of 2m (Forroads, supply channels, desilting of MI Tanks, Pond & Kulam) - 0 to 0.30 m depth
Cement Concrete 1:4:8 mix (one cement, four sand, eight hard broken stone) using 40mm ISS HBG stone jelly for Foundation and flooring including labour charges for mixing concrete watring and laying the concrete complying with standard specifications etc complete.
Cement Concrete in 1 : 3 : 6 mix using 20 mm metal including cost and conveyance of all materials to site and labour charges etc complete
Supplying and errecting shuttering including necessary support for plane surface using steel shuttering for sides of CC pavement including all cost and conveyance of material and labour charges etc complete.
Plastering with cement mortar 1:4mix to 20 mm thick includingcost and conveyance of all materials to site and all labour
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
T PANJAVARANAM
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .