Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹13.7 LAccepted-AOC | ₹13.7 L | L1 | Accepted-AOC Lowest bidder |
| 2 | L2₹16.2 L+₹2.5 L (18.5%)Rejected-Finance | ₹16.2 L+₹2.5 L (18.5%) | L2 | Rejected-Finance Higher bidder |
| 3 | L3₹16.3 L+₹2.6 L (19.2%)Rejected-Finance | ₹16.3 L+₹2.6 L (19.2%) | L3 | Rejected-Finance Higher bidder |
| 4 | L4₹18.3 L+₹4.6 L (33.8%)Rejected-Finance M S CHANANA ENGINEERS CONTRACTORS AZAD CHOWK FEROZEPUR CANTT FEROZEPUR PUNJAB 152001 | FIROZEPUR | PUNJAB | 152001 | ₹18.3 L+₹4.6 L (33.8%) | L4 | Rejected-Finance Higher bidder |
Tender Value
Refer Docs
EMD Value
₹32,800
Closing Date
1 May 2021, 6:00 pmClosed
CWE Ferozepur Cantt
HQ CWE Ferozepur Cantt
CWE/FZR-48/2020-21 Repair and maint of central Air Conditioning Plant of 159 GH under GE (East) Ferozepur Cantt
2020_MES_406106_4
CWE/FZR-48/2020-21
Open Tender
Electrical and Maintenance Works
Item Rate
180 days
Ferozepur Cantt
Please refer Tender documents.
8 documents required · 8 mandatory
₹500
GE (East) Ferozepur
₹32,800
Yes
24 May 2021
12 Apr 2021
3 May 2021
12 Apr 2021
1 May 2021
19 Apr 2021
Amount
Discaling the condenser by recommended chemical discaling compound/hydrochloric acid by soaking method disconnecting condenser from the system by taking out nuts, bolts, studs valves and MS/GI pipe line from both side cover cleaning each tube with nylon brush, flushing with alkaline solution, connecting back both side cover including replacing leather gasket 4 mm thick for following capacities of condenser suitable for AC plant capacities installed as indicated below complete all as specified and directed and all as per manufacturer’s instructions and to the entire satisfaction of Engineer-in-Charge. (a) 12.5 TR condensing unit.
(b) All as per item 1 herein before but 30 TR condensing unit.
Cleaning of cooling coils and air filters as below of Air Handling Unit following capacity at air conditioning plant shown against each. i) Removing air filters and refixing back after cleaning with air blower and water spray to the entire satisfaction of Engineer-in-Charge. ii) Cleaning cooling coil with wire brushes and air blower and water spray (without damaging the fins) after cleaning with Scal gun AI or equivalent chemical i.e HCL and wash with clear water. (a) 12.5 TR Air Handling Unit.
(b) All as per item 3 herein before but 30 TR Air Handling Unit.
Cleaning and Discaling the cooling tower by recommended chemical discaling compound /hydrochloric acid by soaking method disconnecting all filters, fins etc from the system by taking out nuts, bolts, studs and cleaning with nylon brush, flushing with alkaline solution and reconnecting all the filters and fins for AC plant complete all as specified and directed and all as per manufacturer’s instructions and to the entire satisfaction of Engineer-in-Charge.
Disconnecting and dismantling of open type compressor of central air conditioning plant and reinstalled in its position with correct alignment after cleaning, over hauling testing and commissioning of reciprocating open type compressor of cap 12.5 TR Make: Accel model SMC 65 including grinding and polishing of crank shaft, replacement of unserviceable parts (as ordered) charging of compressor oil and refrigerant completely up to entire satisfaction of Engineer-in-Charge. NOTE:- (i)The spare parts required for replacement, compressor oil’ refrigerant (R-22) shall be measured and paid separately. (ii) Any minor parts such as split pins, screws, washers, etc. required for commissioning of work shall be supplied by the tenderer and rate for the same shall deemed to be included in the unit rate quoted against the item]. (iii) Following parts required for commissioning of work shall be supplied by the tenderer and rate for fixing shall deemed to be included in the unit rate quoted against this item. (iv) All spare parts shall be of make ACCEL.
Supply only Piston, complete all as specified and directed by engr-in-charge.
Supply only Piston Rod, complete all as specified and directed by engr-in-charge.
Supply only Piston pin, complete all as specified and directed by engr-in-charge.
Supply only Piston Ring, complete all as specified and directed by engr-in-charge.
Supply only Scraper P-ring, complete all as specified and directed by engr-in-charge.
Supply only Piston Pin Lock, complete all as specified and directed by engr-in-charge.
Supply only Connecting Rod, complete all as specified and directed by engr-in-charge.
Supply only Connecting rod bolt, complete all as specified and directed by engr-in-charge.
Supply only Half section of bearing, complete all as specified and directed by engr-in-charge.
Supply only Casstle nut, complete all as specified and directed by engr-in-charge.
Supply only Split pin, complete all as specified and directed by engr-in-charge.
Supply only Cylinder liner, complete all as specified and directed by engr-in-charge.
Supply only Suction valve return plate, complete all as specified and directed by engr-in-charge.
Supply only Discharge valve Assembly, complete all as specified and directed by engr-in-charge.
Supply only Unloading Frame, complete all as specified and directed by engr-in-charge.
Supply only Rocker, complete all as specified and directed by engr-in-charge.
Supply only Bearing cup, complete all as specified and directed by engr-in-charge.
Supply only Spring Guide, complete all as specified and directed by engr-in-charge.
Supply only Spring , complete all as specified and directed by engr-in-charge.
Supply only Spring retainer, complete all as specified and directed by engr-in-charge.
Supply only Cup Washer, complete all as specified and directed by engr-in-charge.
Supply only Shaft seal Assembly, complete all as specified and directed by engr-in-charge.
Supply only Oil Pump gear Set, complete all as specified and directed by engr-in-charge.
Supply only Oil Pump Bush set, complete all as specified and directed by engr-in-charge.
Supply only Bushing With Coller, complete all as specified and directed by engr-in-charge.
Supply only O.P.R. valve, complete all as specified and directed by engr-in-charge.
Supply only Crank case heating assy, complete all as specified and directed by engr-in-charge.
Supply only Crank case heating element, complete all as specified and directed by engr-in-charge.
Supply only Packing gland, complete all as specified and directed by engr-in-charge.
Supply only Gasket set, complete all as specified and directed by engr-in-charge.
Supply only Dowty ring set, complete all as specified and directed by engr-in-charge.
Supply only Sealing Ring set, complete all as specified and directed by engr-in-charge.
Supply only Neopring 'O' ring Set, complete all as specified and directed by engr-in-charge.
Supply only Safty valve assembly, complete all as specified and directed by engr-in-charge.
Supply only Pressure Guage Pannel, complete all as specified and directed by engr-in-charge.
Supply only Coil for Solenoide Valve, complete all as specified and directed by engr-in-charge.
Supply only L.P. cut out Switch, complete all as specified and directed by engr-in-charge.
Supply only H.P Cut out Switch, complete all as specified and directed by engr-in-charge.
Supply only Oil. Presure failure switch, complete all as specified and directed by engr-in-charge.
Supply only Head Hex screw, complete all as specified and directed by engr-in-charge.
Supply only Crank Shaft For SMC-4-100, complete all as specified and directed by engr-in-charge.
Supply only Lock Washer, complete all as specified and directed by engr-in-charge.
Supply only Lock Nut, complete all as specified and directed by engr-in-charge.
Supply only Oil Pump, complete all as specified and directed by engr-in-charge.
Disconnecting and dismantling of open type compressor of central air conditioning plant reinstalled in its position with correct alignment after cleaning, over hauling testing and commissioning of reciprocating open type compressor of Cap 30 TR make: Accel model No SMC 4/65 (100S) replacement of unserviceable parts (as ordered) charging of compressor oil and refrigerant (R-22) completely up to entire satisfaction of Engineer-in-Charge. NOTE:- (i)The spare parts required for replacement, compressor oil’ refrigerant (R-22) shall be measured and paid separately. (ii) Any minor parts such as split pins, screws, washers, etc. required for commissioning of work shall be supplied by the tenderer and rate for the same shall deemed to be included in the unit rate quoted against the item]. (iii) Following parts required for commissioning of work shall be supplied by the tenderer and rate for fixing shall deemed to be included in the unit rate quoted against this item. (iv) All spare parts shall be of make ACCEL.
Supply only Piston, complete all as specified and directed by engr-in-charge.
Supply only Piston Rod, complete all as specified and directed by engr-in-charge.
Supply only Piston pin, complete all as specified and directed by engr-in-charge.
Supply only piston Ring, complete all as specified and directed by engr-in-charge.
Supply only Scraper P-ring, complete all as specified and directed by engr-in-charge.
Supply only piston Pin lock, complete all as specified and directed by engr-in-charge.
Supply only Half section of bearing, complete all as specified and directed by engr-in-charge.
Supply only Casstle nut, complete all as specified and directed by engr-in-charge.
Supply only Split pin, complete all as specified and directed by engr-in-charge.
Supply only Suction valve return plate, complete all as specified and directed by engr-in-charge.
Supply only Discharge valve Assembly, complete all as specified and directed by engr-in-charge.
Supply only Bearing cup, complete all as specified and directed by engr-in-charge.
Supply only Spring Guide, complete all as specified and directed by engr-in-charge.
Supply only Spring, complete all as specified and directed by engr-in-charge.
Supply only spring retainer, complete all as specified and directed by engr-in-charge.
Supply only Cup Washer, complete all as specified and directed by engr-in-charge.
Supply only Shaft seal Assembly, complete all as specified and directed by engr-in-charge.
Supply only Crank case heating assy, complete all as specified and directed by engr-in-charge.
Supply only Crank case heating element, complete all as specified and directed by engr-in-charge.
Supply only Coil for Solenoide Valve, complete all as specified and directed by engr-in-charge.
Supply only LP Cut out switch, complete all as specified and directed by engr-in-charge.
Supply only HPCut out switch, complete all as specified and directed by engr-in-charge.
Taking out the centrifugal pump set (mono block) of capacity 7.5 HP 3 phase 415 V of any make from foundation base by dismantling electric connection and suction/delivery pipe line taking out to work shop dismantling the pump/motor overhauling the pump by repair/replacement the defective part as ordered replacement of worn out nut bolt washer packing including repairing the bearing housing of pump and motor reassemble the pump and motor complete as directed. Note: The spare part required for replacement shall be measured and paid separately as “Supply and Fix”.
Supply and Fix ball bearing, complete all as specified and directed by engr-in-charge.
Supply and Fix CI Impeller with neck ring, complete all as specified and directed by engr-in-charge.
Supply and Fix water seal, complete all as specified and directed by engr-in-charge.
M&L for rewinding the motor stator of capacity 7.5 HP with super enamelled copper wire of suitable gauge and class of insulation paper sleeves thimble etc and testing, complete all as specified and directed by engr-in-charge.
Supply and Fix connection plate bakelite for motor as per sample, complete all as specified and directed by engr-in-charge.
Supply and Fix PVC cooling fan for motor, complete all as specified and directed by engr-in-charge.
All as per item No 74 above but 5 HP capacity. Note: The spare part required for replacement shall be measured and paid separately as “Supply and Fix”.
Supply and Fix ball bearing, complete all as specified and directed by engr-in-charge.
Supply and Fix CI Impeller with neck ring, complete all as specified and directed by engr-in-charge.
Supply and Fix water seal, complete all as specified and directed by engr-in-charge.
M&L for rewinding the motor stator of capacity 5 HP with super enamelled copper wire of suitable gauge and class of insulation paper sleeves thimble etc and testing, complete all as specified and directed by engr-in-charge.
M&L for rewinding of electric motor 3 phase operating 50 Hz 415 Volts comprising of the following activities for motor of capacity 5 HP complete all as directed/specified and as per manufacturer’s instructions :- (a) Disconnecting and removing the electric motor from installed position and loading, unloading and transporting to workshop. (b) Dismantling existing burnt winding from the motor, prepare for and including rewinding complete with super enameled copper winding wire of existing gauge including all insulating materials such as insulation paper, sleeves, tape, varnish etc complete. (c) Loading, unloading and transporting motor to the site installing in position and in alignment including electric connection commissioning complete all as specified and directed.
All as per item No 86 above but 7.5 HP capacity.
All as per item No 86 above but 15 HP capacity.
All as per item No 86 above but 40 HP capacity.
M&L for removing existing unserviceable expansion valve & supply and fixing new in lieu of Make: Sporlon for following capacity AC plant as per manufacturer’s instructions and as directed:- (a) AC Plant of capacity 12.5 TR
(b) All as per item No 90 above but AC Plant of capacity 30 TR
S&F ‘V’ belt of B-78 suitable for SMC series compressor
All as per item No 92 above but B-98 suitable for SMC series compressor
All as per item No 92 above but B-88 suitable for SMC series compressor
All as per item No 92 above but B-68 suitable for SMC series compressor
Pressure testing of AC plant comprising of 3 Nos. condensing units of capacity 30 TR type for detection of leak by charging nitrogen gas and detection of leakage by soap bubble method on all joints / valve /cut outs / shaft seals etc, complete all as directed by Engineer-in-charge
All as per item No 96 above but 12.5 TR capacity.
S&F thermostat for AC plant 30 TR, complete all as specified and directed by engr-in-charge.
S&F On/Off push button pendants with element red/green/orange, complete all as specified and directed by engr-in-charge.
Supply and charging of refrigerant R-22 to AC plant and package AC complete all as specified and directed
Supply and topping up compressor oil by supplying new compressor oil and charging oil complete all as specified and directed. [Make : SITALN-68 or Equivalent]
Repair/Replacement of fined type strip heater 3 KW 220 Volts, complete all as specified and directed.
S&F single phase preventer model VSP-1, complete all as specified and directed by engr-in-charge.
S&F 3 pole contactor block for starter ML-2 part No SS-90701C coil voltage 240/250V) including taking out old u/s contactor, complete all as specified and directed.
All as per item No 104 above but for starter ML 1.5.
All as per item No 104 above but for starter ML 1
Supply and fixing volt meter, 0-500 Volts, 4" dia complete all as specified and directed.
Supply and fixing ampere meter, 0-150 Volts, 4" dia complete all as specified and directed.
S&F MS pipe including cutting the existing MS line of 20mm bore, welding complete of size 20mm bore, complete all as specified and directed.
All as per item No 109 above but 25mm bore
M&L for preparation of old painted mild steel (MS) surfaces of cooling tower base of central type AC plant 30/12.5 TR and applying two coats of synthetic enamel black paint over a coat of red oxide zinc chrome primer complete all as specified and directed.
M&L for preparation of old painted steel surfaces of water tank, cooling pipes lines of any size for AC plant 30/12.5 TR and length and applying two coats of synthetic enamel paint complete as specified and directed.
M&L for preparation of old painted external steel surfaces of panel board for AC plant 30/12.5 TR and applying two coats of synthetic enamel paint with one coat of red primer complete all as specified and directed.
M&L for preparation of old painted surfaces of compressor unit 30/12.5 TR (including motor, oil immersed starter, condenser, control panel board, liquid line pipe, discharge line pipe, mounting channel etc) and applying two coats of synthetic enamel paint complete all as specified and directed.
Repair existing GI pipe line near cooling tower by welding, cutting and rethreading as per existing size and refixing by means of nipple or socket complete all as specified and directed
Dismantling and taking down of louvers / fins filters of cooling tower, and replace with new louvers refixing to it’s existing position complete all as specified and directed.
Supply and Fix fan blade set complete including all necessary fixing arrangements for blower unit any type and any capacity, complete all as specified and directed.
manoj and company
Shree Balaji Construction
Chanana Engineers & Contractors
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .