Loading…
India Infra Updates on WhatsApp
Join the Tenderkart WhatsApp channel for India Tender Updates
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹12.8 LAccepted-AOC CAMP VILLAGE DEVGAI POST KUDARI SHAHDOL MP | NOWROZABAD | UMARIA | MADHYA PRADESH | 484110 | L-1 | Accepted-AOC Accepted as L-1 | |
| 2 | Rejected-Technical BYPASS TIRAHA ROAD SHAHDOL DISTT SHAHDOL MP | SHAHDOL | SHAHDOL | MADHYA PRADESH | - | Rejected-Technical Rejected as L-2 |
Tender Value
₹18.1 L
EMD Value
₹22,700
Closing Date
17 Jul 2023, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Staff Officer (Mining)
Staff Officer (Mining) SECL Sohagpur Area, PO- Dhanpuri, Distt- Shahdol (MP),Mobile No.- 9425533459
Construction of 24 Nos RCC Ventilation stoppings in development widening and depillaring panels in VII seam at Bangwar UG Mine,of Sohagpur Area
2023_SECL_282709_1
SECL/SGP/ET/23-24/623 dt01/07/2023
Open Tender
Civil Works - Others
Item Rate
180 days
Bangwar UG Mine
As per NIT
8 documents required · 8 mandatory
₹22,700
31 Jul 2023
1 Jul 2023
19 Jul 2023
1 Jul 2023
17 Jul 2023
3 Jul 2023
1 Jul 2023 - 8 Jul 2023
Amount
Item Description/ Heading Part (A) labour Cost
Cleaning removal of debris/stone from galleries and stacking withi 50m distance
Cutting in soft stone by chisel and hammer
Cutting of coall by using chisel/pick-axe
RCC (1:2:4) in wall/roof ceiling of air crossing/ stopping (any thickness) in u/g (Excluding centring, shuttering, reinforcement cutting, bending, placing in position and binding etc all complete as well as cost of RCC materials)
Centring, shuttering, finishing and reinforcement including cutting, bending, placing in position and binding and strutting, propping etc complete.
06mm Thick cement plaster ratio of 1:4 to RCC/PCC work in u/g including curing etc complete(exclusive cost of material)
Loading of all kinds of building materials into tub at incline /pit mount on surface with lead of 50m (excluding centering and shuttering materials)
Transportaion of all kind of building materials from surface to u/g through haulages with tramming & pushing coupling & uncoupling etc for a distance 02 KM or part there of and bringing the empty tub to the surface (excluding centering and shuttering materials)
Un-loading of all kinds of building materials from tubs at destination in u/g and stacking the same
Lead for transportation of materials by manual up to 75 mtr
Part-B Material Cost supply and stacking of building materials Cement
Stone chips(20mm)
Steel rod( 12mm)
Total impact of GST for the purpose of CTC
M/S D K SINGH
stage.html
html • 0.03 MB
techsummary_292725.pdf
PDF • 0.14 MB
finsummary_292725.pdf
PDF • 0.08 MB
AOC623.pdf
PDF • 1.40 MB
BOQ Comparative Chart
xlsx • 0.01 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .