Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L 1₹31.1 LAccepted-AOC | L 1 | Accepted-AOC BEING L1 BID
AND EAS
ACCEPTED BY
TC | |
| 2 | L 2₹34.1 L+₹2.2 L (6.80%)Rejected-Finance GALI NO 5 6 H NO 6 275 JHARODA MAARA EXTN PART III BURARI NEW DELHI 110084 | NEW DELHI | CENTRAL DELHI | DELHI | 110084 | L 2 | Rejected-Finance Other Than L1 | |
| 3 | L 3₹34.3 L+₹2.4 L (7.44%)Rejected-Finance | L 3 | Rejected-Finance Other Than L1 | |
| 4 | L 4₹35.6 L+₹3.7 L (11.5%)Rejected-Finance 73 ASHOTOSH NAGAR NEAR KUNDAN GENERAL STORE OPP SARAD TIMBER P O MANAS NAGAR KRISHNA NAGAR LUCKNOW 226023 | LUCKNOW | LUCKNOW | UTTAR PRADESH | 226023 | L 4 | Rejected-Finance Other Than L1 | |
| 5 | L 5₹35.8 L+₹3.9 L (12.2%)Rejected-Finance 58 SHAHEED NAGAR OPP BHIMRAO AMBEDEKAR UNIVERSITY RBL ROAD LUCKNOW 226025 UP | LUCKNOW | LUCKNOW | UTTAR PRADESH | 226025 | L 5 | Rejected-Finance Other Than L1 |
| Sl No | Description | Qty | Unit | QUALITY CONSTRUCTIONS CO L2 | M/s R.K.Traders L3 | m/s raghubar dayal L8 | Gaurav Enterprises L6 | M/S S S A ASSOCIATES L5 | M/s Bhadoria Associates L1 | M/S SHIVA CONSTRUCTION L7 | M/S VISHAL ENGINEERS L9 | suniltraders L4 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Demolition of cement concrete (unreinforced ) in floors and pavings n. exc 15cm thickness (above or below GL) complete all as specified and directed | 15 | Cum | 150 ₹2,250 | 100 ₹1,500 | 200 ₹3,000 | 190 ₹2,850 | 150 ₹2,250 | 200 ₹3,000 | 98 ₹1,470 Lowest | 100 ₹1,500 | 100 ₹1,500 |
| 2.00 | Dismantling floor, hearth or wall tiles, including cement mortar, removing serviceable tiles from site & rubbish off the premises, complete all as specified and directed. | 925 | Sqm | 15 ₹13,875 | 3 ₹2,775 Lowest | 20 ₹18,500 | 15 ₹13,875 | 25 ₹23,125 | 30 ₹27,750 | 10 ₹9,250 | 50 ₹46,250 | 10 ₹9,250 |
| 3.00 | Taking down cement or cement lime plaster or stone / brick wall, ceiling including racking out joints, hacking for key, scrubbing down with water etc, complete all as specified and directed. | 1,150 | Sqm | 15 ₹17,250 | 3 ₹3,450 Lowest | 10 ₹11,500 | 25 ₹28,750 | 25 ₹28,750 | 10 ₹11,500 | 10 ₹11,500 | 10 ₹11,500 | 180 ₹2,07,000 |
| 4.00 | Taking down chowkhat or frames with shutter (without taking off shutter from the frame ) area n. exc 1.5 Sqm each complete with hold fasts etc complete all as specified and directed. | 50 | Each | 90 ₹4,500 | 20 ₹1,000 Lowest | 80 ₹4,000 | 100 ₹5,000 | 200 ₹10,000 | 100 ₹5,000 | 38 ₹1,900 | 50 ₹2,500 | 50 ₹2,500 |
| 5.00 | Taking down chowkhat or frames with shutter (without taking off shutter from the frame ) area exc 1.5 Sqm but n. exc 4.0 Sqm each complete with hold fasts etc complete all as specified and directed. | 15 | Each | 120 ₹1,800 | 25 ₹375 Lowest | 80 ₹1,200 | 200 ₹3,000 | 300 ₹4,500 | 50 ₹750 | 58 ₹870 | 50 ₹750 | 25 ₹375 Lowest |
| 6.00 | Taking down shutters of any description exc 1.00 Sqm but n. exc 2.00 Sqm and easing, ajusting and also refixing builders hardware as required and renewal of unserviceable screws and refixing in the same opening complete all as specified and directed. | 2 | Each | 400 ₹800 | 50 ₹100 | 250 ₹500 | 500 ₹1,000 | 200 ₹400 | 200 ₹400 | 50 ₹100 | 100 ₹200 | 10 ₹20 Lowest |
| 7.00 | Taking down shutters of any description exc 1.0 sqm and n. exc 2.00 sqm each shutter complete all as specified and directed. | 5 | Per Leaf | 100 ₹500 | 20 ₹100 | 40 ₹200 | 200 ₹1,000 | 200 ₹1,000 | 15 ₹75 | 52 ₹260 | 100 ₹500 | 2 ₹10 Lowest |
| 8.00 | Demolition of brick work or stone masonary built in cement mortar etc complete all as specified and directed. | 2 | Cum | 200 ₹400 | 50 ₹100 | 100 ₹200 | 500 ₹1,000 | 100 ₹200 | 100 ₹200 | 98 ₹196 | 100 ₹200 | 5 ₹10 Lowest |
| 9.00 | M&L for brick work with flyash old size bricks, straight or curved on plan to any radius in half brick thick walls, built in cement mortar 1:4 complete all as specified and directed. | 12 | Sqm | 4,800 ₹57,600 | 400 ₹4,800 Lowest | 600 ₹7,200 | 750 ₹9,000 | 750 ₹9,000 | 500 ₹6,000 | 5,120 ₹61,440 | 600 ₹7,200 | 4,000 ₹48,000 |
| 10.00 | M&L for 5mm thick rendering in cement mortar in CM (1:3) on ceiling finished even and smooth without using extra cement, complete all as specified and directed. | 250 | Sqm | 140 ₹35,000 | 140 ₹35,000 | 165 ₹41,250 | 180 ₹45,000 | 130 ₹32,500 | 120 ₹30,000 Lowest | 140 ₹35,000 | 200 ₹50,000 | 160 ₹40,000 |
Tender Value
₹49.3 L
EMD Value
₹98,640
Closing Date
15 Aug 2025, 6:00 pmClosed
GE (EAST) LUCKNOW
GE EAST LUCKNOW PIN 226002
SPL REPAIR TO 06 X TOILET BLOCKS OF OTM ACCN BLDG NO P131 OF NO 2TT WG AMC C AND C AND OTHER SANCTION MINOR WORK UNDER GE EAST LUCKNOW
2025_MES_720305_1
GE/E/LKO/T-28 OF 2025-26
Open Tender
Civil Works
Item Rate
270 days
GE (EAST) LUCKNOW
AS PER TENDER DOCUMENTS
6 documents required · 6 mandatory
₹500
GE (EAST) LUCKNOW
₹98,640
Yes
17 Nov 2025
18 Jul 2025
25 Aug 2025
18 Jul 2025
15 Aug 2025
1 Aug 2025
stage.html
html • 0.07 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .