Tender Value
₹43.2 L
EMD Value
₹72,286
Closing Date
18 Jul 2026, 10:00 am
Executive Engineer Jal Shakti Divn Haroli
Executive Engineer Jal Shakti Divn Haroli
Providing Beet area Irrigation Schemes (Phase-II) for the left out village of Beet area of Haroli Constituency Distt. Una (HP) Lift Irrigation Scheme to village Deetan) (under NABARD)
2026_HPIPH_138271_1
No. JSV/ Haroli/ TA/ tender/26- 3298-3330 dt 06-07-26
Open Tender
Civil Works
180 days
Village Deetan
as per NIT
10 documents required · 10 mandatory
₹2,000
Yes
₹72,286
6 Jul 2026
6 Jul 2026
18 Jul 2026
7 Jul 2026
18 Jul 2026
7 Jul 2026
7 Jul 2026 - 18 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation in foundation trenches upto all depths in all classification of earth work such as pick work, jumper work, saturated soil including bailing or pumping out water, blasting soft / hard rock or chieselling soft/ hard rock where blasting is prohibited, in all lifts including trimming and dressing of sides, levelling of beds to correct grade including, shoring, strutting, planking, timbering and dewatering, wherever required, stacking the useable and unuseable material/ soil separately and after laying, jointing and testing of pipes returing the useable soil in trenches in 15 cm ( Fifteen centimeter ) layers including consolidating of such deposited layer by ramming and watering and then disposing of all surplus excavated soil /un-useable materials as directed within all leads and lifts including restoration of un-metalled surface to its original condition and including cost of diversion for traffic, night signals, fixing caution boards, crossing over trenches for access to houses, fencing etc. complete in all respect within all leads and lifts and to the entire satisfaction as per the directions of Engineer-in-Charge. | 1,203.9 | Cum | - | - |
| 2 | Providing and laying cement concrete (M-10) 1:3:6 (1cement: 6sand :12graded stone aggregate 20mm nominal size) and curing complete excluding cost of form work in foundation and plinth complete in all respect within all leads and lifts and to the entire satisfaction as per the directions of Engineer-in-Charge. | 17.93 | Cum | - | - |
| 3 | Providing and laying cement concrete 1:4:8(1cement:4sand:8graded stone aggregate 40mm nominal size) and curing complete excluding cost of form work in foundation and plinth complete in all respect within all leads and lifts and to the entire satisfaction as per the directions of Engineer-in-Charge. | 6.44 | Cum | - | - |
| 4 | Providing and laying cement concrete 1:6:12(1cement:6sand:12graded stone aggregate 40mm nominal size) and curing complete excluding cost of form work in foundation and plinth complete in all respect within all leads and lifts and to the entire satisfaction as per the directions of Engineer-in-Charge.. | 12.77 | cum. | - | - |
| 5 | 2nd class Brick work using common burnt clay building bricks in foundation and plinth in cement mortar 1:4 (1cement:4sand) complete in all respect within all leads and lifts and to the entire satisfaction as per the directions of Engineer-in-Charge. | 18.49 | Cum | - | - |
| 6 | 1st class Brick work using common burnt clay building bricks in foundation and plinth in cement mortar 1:6 (1cement:6sand) complete in all respect within all leads and lifts and to the entire satisfaction as per the directions of Engineer-in-Charge. | 29.9 | cum | - | - |
| 7 | Filling in plinth with sand under floors including watering ramming consolidating and dressing complete in all respect within all leads and lifts and to the entire satisfaction as per the directions of Engineer-in-Charge. | 6.57 | cum | - | - |
| 8Providing and laying cement concrete work M 25 mix cocncrete using aggregates 20 mm nominal size and curing complete excluding cost of from work and reinforcement for reinforced concrete work in :- | |||||
| 8.01 | Foundation,footing,bases of columns and like & mass concrete | 6.07 | Cum | - | - |
| 8.02 | Suspended floor,roofs,landing & shelves & their support balconies,beams,girders,bre-ssumers & cantilever upto floor level. | 1.39 | Cum | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.23 MB
Tendernotice_2.pdf
PDF • 0.65 MB
Tendernotice_3.pdf
PDF • 0.15 MB
Tendernotice_4.pdf
PDF • 0.17 MB
BOQ_204783.xls
BOQ • 0.53 MB
Download all tender documents and submit your bid