| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹13.5 LAccepted-AOC | ₹13.5 L | L1 | Accepted-AOC LER |
| 2 | L2₹13.9 LRejected-Finance | ₹13.9 L | L2 | Rejected-Finance AER |
| Sl No | Description | Qty | Unit | SESHA CONSTRUCTION L1 | Shanmugam P L2 |
|---|---|---|---|---|---|
| 1.00Rejuvenation MI Tank of Sunken Eri Mangalam Pudur in Mangalam Pancahayt at Thurinjapuram Block | |||||
| 1.01 | Clearing scrub jungles including all other incidential charges etc., complete | 25,166.3 | Sq.m | 5.2 ₹1.3 L | 6.9 ₹1.7 L |
| 1.02 | Earthwork in all Soils except hard Rock requiring blasting and conveying for Formation of Bund with lead of 0 to 100 m deploying earth moving machinery and Tippers including benching ,formation of bunds ,breaking clods, sectioning etc complete . | 2,025 | Cu.m | 52.15 ₹1.1 L | 53.85 ₹1.1 L |
| 1.03 | Construction of Weir
Earth work excavation foundation in all kinds of soils and sub soils except rock | 78.73 | Cu.m | 223.9 ₹17,627.65 | 225.6 ₹17,761.49 |
| 1.04 | Cement Concrete 1:4:8 mix using 40mm ISS HBG stone jelly and M.Sand for Foundation and flooring including cost,conveveyance of all materials and labour charges to laid in layers not more than 15cm thick, well rammed etc, complete with standard specification | 42.7 | Cu.m | 4,785.84 ₹2.0 L | 4,487 ₹1.9 L |
| 1.05 | Centering for sides and softfits or reinforced cement concrete slabs or plane surface ets. | 111.84 | Sq.m | 476.3 ₹53,269.39 | 478 ₹53,459.52 |
| 1.06 | Centering for sides and softfits or reinforced cement concrete slabs or plane surface ets. | 75.42 | Sq.m | 952.8 ₹71,860.18 | 954.5 ₹71,988.39 |
| 1.07 | Cement Concrete 1 : 3 : 6 mix using 40mm ISS HBG stone jelly and M.Sand for Foundation and flooring including cost,conveveyance of all materials and labour charges to laid in layers not more than 15cm thick, well rammed etc, complete with standard specification | 86.64 | Cu.m | 5,115.15 ₹4.4 L | 5,056 ₹4.4 L |
| 1.08 | Cement Concrete 1 : 2 : 4 mix using 20mm ISS HBG stone jelly and M.Sand for Foundation and flooring including cost,conveveyance of all materials and labour charges to laid in layers not more than 15cm thick, well rammed etc, complete with standard specification | 19.44 | Cu.m | 6,151.04 ₹1.2 L | 6,152.74 ₹1.2 L |
| 1.09 | GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package} | 1 | GST Amount (in Rupees) | 2,06,340 ₹2.1 L | 2,11,529 ₹2.1 L |
Tender Value
₹13.8 L
EMD Value
₹13,900
Closing Date
6 Oct 2023, 3:00 pmClosed
Block Development Officer (B.Pt), Thurinjapuram
Block Development Office, Thurinjapuram
Rejuvenation MI Tank of Sunken Eri Mangalam Pudur in Mangalam Pancahayt at Thurinjapuram Block of Tiruvannamalai District under District 15th District Panchayat 2023-2024
2023_RDTN_373455_1
Roc. No. A2/410/2023 Dt.11.08.2023-1
Open Tender
Civil Works - Water Works
60 days
Thurinjapuram
Refer Tender Documents
3 documents required · 3 mandatory
₹0
₹13,900
3 Mar 2026
26 Sept 2023
6 Oct 2023
26 Sept 2023
6 Oct 2023
26 Sept 2023
Amount
Rejuvenation MI Tank of Sunken Eri Mangalam Pudur in Mangalam Pancahayt at Thurinjapuram Block
Clearing scrub jungles including all other incidential charges etc., complete
Earthwork in all Soils except hard Rock requiring blasting and conveying for Formation of Bund with lead of 0 to 100 m deploying earth moving machinery and Tippers including benching ,formation of bunds ,breaking clods, sectioning etc complete .
Construction of Weir Earth work excavation foundation in all kinds of soils and sub soils except rock
Cement Concrete 1:4:8 mix using 40mm ISS HBG stone jelly and M.Sand for Foundation and flooring including cost,conveveyance of all materials and labour charges to laid in layers not more than 15cm thick, well rammed etc, complete with standard specification
Centering for sides and softfits or reinforced cement concrete slabs or plane surface ets.
Centering for sides and softfits or reinforced cement concrete slabs or plane surface ets.
Cement Concrete 1 : 3 : 6 mix using 40mm ISS HBG stone jelly and M.Sand for Foundation and flooring including cost,conveveyance of all materials and labour charges to laid in layers not more than 15cm thick, well rammed etc, complete with standard specification
Cement Concrete 1 : 2 : 4 mix using 20mm ISS HBG stone jelly and M.Sand for Foundation and flooring including cost,conveveyance of all materials and labour charges to laid in layers not more than 15cm thick, well rammed etc, complete with standard specification
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Shanmugam P
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid