| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.3 LAccepted-Finance | ₹1.3 L | L1 | Accepted-Finance L1 |
| 2 | L2₹1.3 L+₹1,989 (1.53%)Rejected-Finance | ₹1.3 L+₹1,989 (1.53%) | L2 | Rejected-Finance L2 |
| 3 | L3₹1.3 L+₹3,289 (2.53%)Rejected-Finance | ₹1.3 L+₹3,289 (2.53%) | L3 | Rejected-Finance L3 |
Tender Value
₹1.3 L
EMD Value
₹2,600
Closing Date
7 Aug 2026, 6:00 pmClosed
Pradhan Takling II GP
Office of the Pradhan Takling II GP
Construction of CC Footpath from Amit Land to SSK School, Sansad No II - AC 117229560
2026_GTA_1035443_2
14 /TKIIGP/15thFC/2025-26
Open Tender
CIVIL WORKS
Percentage
30 days
Takling II GP area
Please refer Tender documents.
4 documents required · 4 mandatory
₹1,000
₹2,600
17 Aug 2026
31 Jul 2026
10 Aug 2026
31 Jul 2026
7 Aug 2026
31 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete. | 33.51 | Cum | 119.27 | ₹3,996.74 |
| 2 | Earth work in filling in foundation trenches or plinth with good earth, in layers not exceeding 150 mm. including watering and ramming etc. layer by layer complete. (Payment to be made on the basis of measurement of finished quantity of work) . | 6.7 | Sqm | 77.54 | ₹519.52 |
| 3 | Labour for laying 150 mm to 200 mm boulder soling including rough dressing hand packing and ramming down small pieces in the interstics including rolling and preparing the bed to proper level and filling up all joints with sandy clay or earth. | 109.8 | Sqm | 50 | ₹5,490 |
| 4 | Cost of Boulder | 16.47 | Cum | 1,272 | ₹20,949.84 |
| 5 | (I) Cement concrete with graded stone ballast (40 mm size excluding shuttering) In ground floor | - | Cum | 5,971.6 | - |
| 6 | Hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns, lintels curved or straight including fitting, fixing and striking out after completion of works (upto roof of ground floor). | 25.2 | Sqm | 334 | ₹8,416.8 |
| 7 | Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary (Ground floor).[Excluding cost of chipping over concrete surface]. | 31.5 | Sqm | 211.2 | ₹6,652.8 |
| 8 | Neat cement punning about 1.5mm thick in wall, dado, window sill, floor etc. NOTE:Cement 0.152 cu.m per100 sq.m. | 31.5 | Sqm | 40.8 | ₹1,285.2 |
| 9 | Plum concrete work with 40 % cement concrete with 30 mm down graded stone metal and 60 % stone boulder of size 150 mm and above, placed in position as directed excluding shuttering if any. | 1.62 | Sqm | 3,964.8 | ₹6,422.98 |
| 10 | Display Board and Unseen Items | 1 | No | 2,944 | ₹2,944 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.46 MB
BOQ_2543505.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .