Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.4 LAccepted-Finance | ₹10.4 L | L1 | Accepted-Finance LER |
| 2 | L2₹10.6 LRejected-Finance | ₹10.6 L | L2 | Rejected-Finance AER |
| Sl No | Description | Qty | Unit | Venkatesan S L2 | Sivagurunathan L1 |
|---|---|---|---|---|---|
| 1.00BT to Sri Balaji Nagar in Pudhupattinam panchayat. Thanjavur Union. | |||||
| 2.00 | Earth work excavation and depositing on bank with initial lead of 10metres and lift of 2metres as per SS 20A including breaking clods, sectioning, ramming etc., complete as directed by the dept.officers for formation.(SI. No.61) | 75.6 | Cum | 143.05 ₹10,814.58 | 140.35 ₹10,610.46 |
| 3.00 | Picking the existing worn out BT surface to an average thickness of 50
mm including labour charges and machinery charges etc complete | 420 | Sqm | 23.79 ₹9,991.80 | 23.34 ₹9,802.80 |
| 4.00 | Providing and laying 75mm compacted thick WBM Grade III using 1 cum of 63mm to 11.20mm IRC HBG metal and 0.24 cum of Gravel for blindage for 10 Sqm. of 75mm compacted thick (the blindage material shall have PI value less than 6%) including cost and conveyance of all materials from approved quarry to work site and stacking to departmental gauge for pre-measurement as directed by the departmental officers including labour for spreading metal | 94.5 | Cum | 3,662.44 ₹3.5 L | 3,593.4 ₹3.4 L |
| 5.00 | Applying tack coat over WBM surface (not treated with primer) using 4Kg of bituminous emulsion per 10 Sqm. including cost of bituminous emulsion which will be supplied departmentally at section stores and cost of which will be recovered at the rates as per special conditions appended herewith including conveyance of bituminous emulsion all charges | 1,260 | Sqm | 70.76 ₹89,157.60 | 69.42 ₹87,469.20 |
| 6.00 | PREMIX CARPET WITH SEAL COAT TYPE ' A ' Providing and laying pre-mix carpet 20mm thickness using 0.18cum of 13.20mm IRC machine crushed metal ,0.09cum of 11.2mm IRC machine crushed metal with 14.60kg of Bitumen for pre-mixing 10sqm of pre-mix carpet and laying Seal coat type"A" using 0.09cum of 6.70mm IRC HBG chips with 9.80kg of Bitumen for 10sqm including cost and conveyance of materials to the departmental metric gauge for pre-measurement heating the bitumen boiler heating the aggregate and mixing them with bitumen in mini hot mix plant for pre-mix carpet and rolling by 80-100 KN power roller including labour charges for spreading hire and fuel charges for mini hot mix plant , bitumen boiler , all other tools and plants employed etc., complete as per clause 509 of MOST specifications. | 1,260 | Sqm | 342.24 ₹4.3 L | 335.78 ₹4.2 L |
| 7.00 | Collection and Supply of Soling U.S.gravel from approved quarry including cost and conveyance to worksite to standard departmental gauge for taking pre-measurement and all other labour charges for spreading complete with standard specifications etc., comp | 25.2 | Cum | 601.93 ₹15,168.64 | 590.59 ₹14,882.87 |
| 8.00 | GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package} | 1 | GST Amount (in Rupees) | 1,62,442 ₹1.6 L | 1,59,376 ₹1.6 L |
Tender Value
₹10.6 L
EMD Value
₹10,550
Closing Date
11 Mar 2026, 3:00 pmClosed
Block Development Officer (BP), Thanjavur
Block Development Office, Thanjavur
Thanjavur District Thanjavur Block BT to Sri Balaji Nagar in Pudhupattinam panchayat. SFC District Panchayat 2025-2026
2026_RDTN_670601_1
Rc.No.2372/2025/ A2/dated 03.03.2026
Open Tender
Civil Works
6 days
Thanjavur
Please refer Tender documents.
8 documents required · 8 mandatory
₹0
₹10,550
21 Mar 2026
5 Mar 2026
11 Mar 2026
5 Mar 2026
11 Mar 2026
5 Mar 2026
BT to Sri Balaji Nagar in Pudhupattinam panchayat. Thanjavur Union.
Earth work excavation and depositing on bank with initial lead of 10metres and lift of 2metres as per SS 20A including breaking clods, sectioning, ramming etc., complete as directed by the dept.officers for formation.(SI. No.61)
Picking the existing worn out BT surface to an average thickness of 50 mm including labour charges and machinery charges etc complete
Providing and laying 75mm compacted thick WBM Grade III using 1 cum of 63mm to 11.20mm IRC HBG metal and 0.24 cum of Gravel for blindage for 10 Sqm. of 75mm compacted thick (the blindage material shall have PI value less than 6%) including cost and conveyance of all materials from approved quarry to work site and stacking to departmental gauge for pre-measurement as directed by the departmental officers including labour for spreading metal
Applying tack coat over WBM surface (not treated with primer) using 4Kg of bituminous emulsion per 10 Sqm. including cost of bituminous emulsion which will be supplied departmentally at section stores and cost of which will be recovered at the rates as per special conditions appended herewith including conveyance of bituminous emulsion all charges
PREMIX CARPET WITH SEAL COAT TYPE ' A ' Providing and laying pre-mix carpet 20mm thickness using 0.18cum of 13.20mm IRC machine crushed metal ,0.09cum of 11.2mm IRC machine crushed metal with 14.60kg of Bitumen for pre-mixing 10sqm of pre-mix carpet and laying Seal coat type"A" using 0.09cum of 6.70mm IRC HBG chips with 9.80kg of Bitumen for 10sqm including cost and conveyance of materials to the departmental metric gauge for pre-measurement heating the bitumen boiler heating the aggregate and mixing them with bitumen in mini hot mix plant for pre-mix carpet and rolling by 80-100 KN power roller including labour charges for spreading hire and fuel charges for mini hot mix plant , bitumen boiler , all other tools and plants employed etc., complete as per clause 509 of MOST specifications.
Collection and Supply of Soling U.S.gravel from approved quarry including cost and conveyance to worksite to standard departmental gauge for taking pre-measurement and all other labour charges for spreading complete with standard specifications etc., comp
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.43 MB
TechnicalBidsribalaji.pdf
Tender Documents • 0.49 MB
PriceBidsribalaji.pdf
Additional Documents • 0.36 MB
BOQ_805899.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid