| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹3.0 LAdmitted-Finance | +0.00% | ₹3.0 L | L1 | Admitted-Finance |
| 2 | L2₹3.1 L+₹12,566.56 (4.21%)Admitted-Finance | +4.21% | ₹3.1 L+₹12,566.56 (4.21%) | L2 | Admitted-Finance |
| 3 | L3₹3.2 L+₹17,581.25 (5.89%)Admitted-Finance 3 1 120 ANANDA PALIT ROAD ADJACENT AREA IN WARD NO 55 | KOLKATA | WEST BENGAL | 700001 | +5.89% | ₹3.2 L+₹17,581.25 (5.89%) | L3 | Admitted-Finance |
Tender Value
₹3.0 L
EMD Value
₹6,000
Closing Date
19 Aug 2026, 11:00 amClosed
Executive Engineer (civil HQ)
The Executive Engineer (C )/ HQ at 48, Market Street, Kolkata - 700087
REPAIRING OF ROOF OF GATHA 1ST FLOOR LEVEL WITH OTHER ANCILLARY WORKS AT TOWN HALL ANNEX BUILDING
2026_KMC_1037085_1
KMC/DG(C)/EEC/HQ/26-27
Open Tender
CIVIL WORKS
Percentage
15 days
KMC AREA
Please refer Tender documents.
6 documents required · 6 mandatory
₹0
₹6,000
25 Aug 2026
11 Aug 2026
21 Aug 2026
11 Aug 2026
19 Aug 2026
11 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | SECTION 1. ------------BUILDING WORKS (I) PLASTERING, POINTING ETC.B. MISCELLANEOUS ITEMS 1 Labour for Chipping of concrete surface before taking up Plastering work. | 57.14 | SQUARE METER | 21 | ₹1,199.94 |
| 2 | SECTION 1. ------------BUILDING WORKS (I) PLASTERING, POINTING ETC. A. ORIGINAL WORKS 1.Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary (Ground floor).[Excluding cost of chipping over concrete surface] i) With 1:6 cement mortar (b) 20 mm thick plaster(3rd Corrigenda & addenda dated 04.06.2018 | 57.14 | SQUARE METER | 175 | ₹9,999.5 |
| 3 | Roof treatment by application of non toxic polyurethane modified acrylic based single component (P U Roof Coat) solvent free, cold applied polyurethane modified elastomeric waterproofing membrane with excellant UV resistant capasity as per ASTM D6083 [a water based 100% acrylic elastomeric emulsion polymer latex coating used as protective coating for roofsl after preparing the surface by cleaning and repairing the roof cracks by cement & sand mortar (1:4), preferably with antishrinkage mortar (to be paid separately) if any, apply two coats along with a priming coat (two coats of P U Roof Coat and one coat of primer coat compatible with main product as per manufacturers specification) and reinforced with or without 20 gsm Geotextile Fleece, including the cost of primer coat and base preparation, tools & plants but excluding the cost of scaffolding and stagging complete as per direction of Engineer -in-charge. (Note: If Geotextile Fleece not uesd,the rate would be reduced by Rs. 5/- per Sqm.) (13th Corrigenda & addenda dated26.02.2021 | 291.04 | SQUARE METER | 430.42 | ₹1,25,269.44 |
| 4 | BUILDING WORKS(D) Flooring..A. ORIGINAL WORKS?(19)Extra cost of labour for grinding Kota Stone Floor in treads and riser of Steps | 4.32 | SQUARE METER | 209 | ₹902.88 |
| 5 | MATERIALS AND LABOUR 1. Building (B) Labour Rates Per Diem : 3)Mazdoor (Male). Note: (I)The above rates of labour are exclusive of 10% contractors profit and 1% Labour welfare cess which would be admissible to the Contractors, but contractual percentage will not be applicable. (II) The workersemployed on high rise building or any structure over 30 ft in height and also workers engaged in Tunnel shall be paid 20% extra wages. | 68 | Each | 269.5 | ₹18,326 |
| 6 | BUILDING WORKS (D) Flooring A. ORIGINAL WORKS 35. Supplying, fitting & fixing 1st quality Ceramic tiles in walls and floors to match with the existing work & 4 nos. of key stones (10mm) fixed with araldite at the back of each tile & finishing the joints with white cement mixed with colouring oxide if required to match the colour of tiles including roughening of concrete surface, if necessary or by synthetic adhesive & grout materials etc. (A) Floor With Sand Cement Mortar (1:4) 20 mm thick & 2 mm thick cement slurry at back side of tiles using cement @ 2.91 Kg/Sq.m & joint filling using white cement slurry @0.20kg/Sq.m. (b) Area of each tile above 0.09 Sq.m (i) Coloured decorative. Note: 2. Add extra for each addl, floor over the rate for item 35 & 36 of subhead A. (i) upto 4 th floor-Rs 5/ Sq.m (i) above 4 th floor-Rs 6.25/ Sq.m (3rd Corrigenda & addenda dated 04.06.2018 | 30.72 | SQUARE METER | 920 | ₹28,262.4 |
| 7 | BUILDING WORKS (D) Flooring A. ORIGINAL WORKS 35. Supplying, fitting & fixing 1st quality Ceramic tiles in walls and floors to match with the existing work & 4 nos. of key stones (10mm) fixed with araldite at the back of each tile & finishing the joints with white cement mixed with colouring oxide if required to match the colour of tiles including roughening of concrete surface, if necessary or by synthetic adhesive & grout materials etc. (B) Wall. With Sand Cement Mortar (1:3) 15 mm thick & 2 mm thick cement slurry at back side of tiles using cement @ 2.91 Kg/Sq.m & joint filling using white cement slurry @ 0.20kg/Sq.m. (b) Area of each tile above 0.09 Sq.m (i) Coloured decorative. Note: 2. Add extra for each addl, floor over the rate for item 35 & 36 of subhead A. (i) upto 4 th floor-Rs 5/ Sq.m (i) above 4 th floor-Rs 6.25/ Sq.m (3rd Corrigenda & addenda dated 04.06.2018 | 6.24 | SQUARE METER | 1,109 | ₹6,920.16 |
| 8 | BUILDING WORKS(D) Flooring..A. ORIGINAL WORKS?(16)(b)Supplying fitting and fixing in position 8 mm. to 12 mm. thick Dholpur slab in wall, dado making suitable arrangement to hold the stone properly with approved polymerised adhesives (6 mm thick) as per ISI specification including pointing with cement mortar (1:2) (1 cement: 2 marble dust) with admixture of pigment matching the stone shades all complete as per direction of Engineer-in-charge including cost of all materials, labour, scaffolding, staging, curing complete [using white cement for pointing @ 2.4 kg/ Sq.m]. In ground floor | 12 | SQUARE METER | 1,158 | ₹13,896 |
| 9 | BUILDING WORKS(D) Flooring..A. ORIGINAL WORKS?(22)Supplying, fitting and fixing Marble Slab/tile of 15 to 18 mm thickness in floor, lobby, stair, landing & treads etc. over 20 mm (av.) thck base of Cement mortar (1:2) laid with white cement slurry @ 4.4 kg/Sq.m before placing marble & jointed with white cement slurry @ 2.0 kg/Sq.m with necessary pigments including grinding and Granite polishing as per direction of Engineering -in -Charge in Ground Floor. {White cement and Pigment to be supplied by the Agency].(a) With Makrana plain pink / Adranga Pink / Garbh Gulabi / Udaypur pink / Udaypur Green / Black Bhaslana.(ii) Area of each Slab/tile exceeding 0.3 sq.m. but not exceeding 0.6 sq.m. (3rd Corrigenda & addenda dated 04.06.2018) | 14 | SQUARE METER | 1,694 | ₹23,716 |
| 10 | BUILDING WORKS ( C ) Brickworks,Concrete Works etc..C. REPAIR AND REHABILITATION WORKS?(a) Applying 2 coats of bonding agent with synthetic multi functional rubber emulsion having adhesive and water proofing properties by mixing with water in proportion (1 bonding agent : 4 water : 6 cement) as per Manufacturer's specification [Cement to be supplied by the Department] | 62.96 | SQUARE METER | 88 | ₹5,540.48 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.36 MB
form_1-13.pdf
Tender Documents • 1.17 MB
BOQ_2547410.xls
BOQ • 0.31 MB
C1.pdf
Additional Documents • 4.88 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .