Tender Value
₹15.0 L
Closing Date
1 Jul 2026, 5:00 pm
Similar tender results from the same govt authority in the past 3 years.
Executive Engineer Zilla Parishad Raigad Alibag
Shivtirtha Building Zilla Parishad Raigad Alibag
Construction Of Road and Gutter at Khambivali To Rahatad Road Tal-Tala Dist-Raigad
2026_RAIGA_1309542_2
ZP-RAIGAD-WORKDIV-17-2026-27
Open Tender
Civil Works
270 days
Tal-Tala, Dist-Raigad
RZP Registration Contractor AS PER ONLY FOR S.B.A.
12 documents required · 12 mandatory
₹590
Exempted
17 Jun 2026
17 Jun 2026
2 Jul 2026
17 Jun 2026
1 Jul 2026
17 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1 | Item NO.1:-Providing and constructing 75 mm. thick Modified Penetraction Macadam (MPM) road surface including all materials, preparing the existing road surface, spreading 40 mm. stone layers metal 30% crusher broken metal + 70% Hand broken metal (By breaking Rubble obtained by blasting) , heating and spraying the bitumen of specified grade @ 2 kg / sqm , spreading 12mm.size chips compacting with three wheel static roller having weight 8 to 10 MT. to achive the desired degree of compaction as per Technical Specification Clause 506 etc.complete, including applying tack coat of specified grade of bitumen at the rate of 0.30 Kg Sqm. on existing bitumen surface. (VG-30 bulk bitumen rates are considered to arrive at rates) | 1,783.65 | Per One Square Meter | 390 | ₹6,95,623.5 | - |
| 2 | Item NO.2:-Providing and applying tack coat on the prepared surface heating by fames in Boiler and spraying bitumen set footed in bitumen boller on B.T. surface 2.5 kg/10 sqm.(VG-30 bulk bitumen rates are considered to arrive at rates) | 1,551 | Per One Square Meter | 20 | ₹31,020 | - |
| 3 | Item NO.3-Open Graded Premix Surfacing- Providing and Laying OGC 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates premixed with bituminous binder transported to site with VTS , laid over a previously prepared surface, finished to the required grade, level, alignment, and rolling to achieve the desired compaction but excluding prime / tack and Seal coat. For Bitumen of specified grade--USING drum mix type hot mix plant with SCADA, Paver and Vibratory roller ( Over MPM Surface) (VG-30 bulk bitumen rates are considered to arrive at rates) | 1,551 | Per One Square Meter | 226 | ₹3,50,526 | - |
| 4 | Item NO.4:-Providing bituminous Type A liquid seal coat on bituminous surface including supplying all materials and bitumen of specified grade preparing existing road surface, heating and applying bitumen @ 0.98 KgSqm. by mechanical means, spreading chips and rolling, by static roller having weight 8 to 10 MT. etc. complete. (VG-30 bulk bitumen rates are considered to arrive at rates) | 1,551 | Per One Square Meter | 90 | ₹1,39,590 | - |
| 5 | Item no.5:-Providing and fixing board displaying information, such as 'Name of work, Tender cost, Name of Contractor, Work completion and liability period etc', having rectangular shape of 1.20m x 0.90m size made out 18 gauge (1.25mm) thick mild steel sheet painted with one coat of Zinc chromate stoving primer and two coats of enamel paint on front side and grey stove enamel on back side and border / messages / symbols etc. with approved colour shade paint complete, on M.S.angle of size 35 x 35 x 3 mm frame with properly cross braced M.S. angles of size 35mmx35mmx3mm duly painted including Two M.S. angle iron posts of size 65 mm x 65 mm x 6 mm, 3.65 m long painted with alternate black and white bands of 25 cm width including all fixtures etc.and fixing the boards in 1:4:8 concrete block of size 60 cm x 60 cm x 75 cm including, excavation, refilling, transportation, and labour etc complete. Spec. No. As directed by Engineer in Charge | 1 | Per One Number | 11,011 | ₹11,011 | - |
| 6 | Item No.6:- Quality Control testing charges for Aggregate ( Sieve Analysis) | 1 | Per One Number | 690 | ₹690 | - |
| 7 | Item No.7- Quality Control testing charges Bitumen ( Penetration ,Softening, point, Flash & Fire Point, Specific Gravity etc. ) | 1 | Per One Number | 3,135 | ₹3,135 | - |
| 8 | Item No 8- Quality Control testing charges Bitumen ( Penetration ,Softening, point, Flash & Fire Point, Specific Gravity etc. ) | 1 | Per One Cubic Meter | 1,595 | ₹1,595 | - |
| 9 | Item No.9:- Reimbrsement of royalty charges if contractor provides orignal royalty challan from revenue department. | 112.37 | Per One Cubic Meter | 216.18 | ₹24,292.14 | - |
| 10 | Add For 18 % G.S.T. Charges | 1 | Number | 2,21,974.29 | ₹2,21,974.29 | BI01010001010000000000000515BI0100001148 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.00 MB
BOQ_2246570.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid