Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.4 LAccepted-AOC | L1 | Accepted-AOC accept | |
| 2 | L2₹7.2 L+₹88,356.83 (13.9%)Rejected-AOC | L2 | Rejected-AOC accept | |
| 3 | L3₹7.4 L+₹1.1 L (16.7%)Rejected-AOC GRAM BAIJLA PO CHAMU BARA PRAYAGRAJ UTTAR PRADESH 212106 | PRAYAGRAJ | PRAYAGRAJ | UTTAR PRADESH | 212106 | L3 | Rejected-AOC accept | |
| 4 | L4₹8.2 L+₹1.9 L (29.6%)Rejected-AOC CHITAVANPUR RAJAPUR MIRZAPUR | L4 | Rejected-AOC accept | |
| 5 | Not Admitted-Fee/PreQual/Technical AURAIYA | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹10 L
EMD Value
₹20,000
Closing Date
24 Mar 2021, 3:35 pmClosed
executive engineer belan canal division prayagraj
Office of the EE Belan Canal Division, Prayagraj Irrigation colony
Reconstruction of V.R.B. at km 7.402 of Manda Dy.
2021_UPIDC_573257_1
05/EE/2020-21
Open Tender
Civil Works
Item Wise
45 days
prayagraj
Please refer Tender documents.
2 documents required · 2 mandatory
₹766
₹20,000
20 Jul 2023
19 Mar 2021
24 Mar 2021
19 Mar 2021
24 Mar 2021
19 Mar 2021
Amount
Dismatling of old daimage V.R.B. Slab & other portion proper disposal inluding cost of all material, labour and T&P etc.
Dismatling of old daimage V.R.B. brick Maonary with proper Disposal including cost of all material, labour and T&P etc.
E/w in foundation including cost of all material, labour and T&P etc.
Laying local sand including cost of all material, labour and T&P etc.
Laying.C.C. 1:3:6 in foundation including cost of all material, labour and T&P etc.
C.R.S. Masonary with 1:3 C.M.including cost of all material labour and T&P etc.
Centering and Shuttering for R.C.C. work including cost of all material, labour and T&P etc.
Steel Reinforcement in slab including cutting bending with iron wire & placing inposition including cost of all material, labour and T&P etc.
R.C.C. work in slab (1:1,5.3) including cost of all material, labour and T&P etc.
Laying C.C. 1:2:4 in wearing coat & parapet in including cost of all matreial, labour and T&P etc.
Laying C.C. 1:2:4 in for coping on parapet cost of all matreial, labour and T&P etc.
Deep struck pointing in 1:2 c.m. on Brick masonary including cost of all material, labour and T&P etc.
Colour Painting with Folorosent enamel Paint of two coat, of parapet including cost of all material, labour and T&P etc.
Providing & fixing Wheel Guard including cost of all material, labour and T&P etc.
E/W in embankment for Restroration of canal section U/S & D/S of V.R.B. in all types of soil mixed including all lead, lift and dressing etc.
M/S RAM ASAREY PATEL
REKHA DEVI
KHAN CONSTRUCTION
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .