Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹11,954.56Admitted-Fee/PreQual/Technical/Finance LOKBAWAN LARKIPORA | SAMBA | JAMMU AND KASHMIR | 181133 | -27.00% | ₹11,954.56 | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹12,273.89+₹319.33 (2.67%)Admitted-Fee/PreQual/Technical/Finance | -25.05% | ₹12,273.89+₹319.33 (2.67%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹12,920.75+₹966.19 (8.08%)Admitted-Fee/PreQual/Technical/Finance | -21.10% | ₹12,920.75+₹966.19 (8.08%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹4.5 L
EMD Value
₹9,000
Closing Date
11 Sept 2026, 2:00 pmClosed
Executive Engineer FSC Division Narbal
Narbal
Restoration of vulnerable spots on various Nallahs of FSC Division Narbal
2026_IFC_323096_1
e-NIT No.18 of 2026-27 of FSC Narbal
Open Tender
Civil Works
Percentage
212 days
Narbal
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
Executive Engineer FSC Narbal
₹9,000
21 Sept 2026
1 Sept 2026
12 Sept 2026
1 Sept 2026
11 Sept 2026
1 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Engagement of Hydraulic Excavator(3D) including cost of services of operating staff, cost of lubricating oil, diesel/petrol/kerosene oil, other consumables for running the plant and machinary for Removal of obstructions / Removal of Building Material from Embankments and like at Designated sites as Directed by Engineer -in INCHARGE at the site with driver and fuel at selected reaches as directed by Engineer-in-Charge at site in the jurisdiction of FSC Division Narbal (idle Charges). | 1 | Working Hour | 800 | ₹800 |
| 2 | Engagement of Hydraulic Excavator(3D) including cost of services of operating staff, cost of lubricating oil, diesel/petrol/kerosene oil, other consumables for running the plant and machinary for Removal of obstructions / Removal of Building Material from Embankments and like at Designated sites as Directed by Engineer -in INCHARGE at the site with driver and fuel at selected reaches as directed by Engineer-in-Charge at site in the jurisdiction of FSC Division Narbal (Running Charges). | 1 | Working Hour | 1,252 | ₹1,252 |
| 3 | Engagement of poklain (chain mounted )including cost of services of operating staff, cost of lubricating oil ,diesel/kerosene oil ,other consumable for running the plant and machinery in selected reaches in the jurisdiction of FSC division Narbal as directed by Engineer-incharge, complete job. (Running Charges) | 1 | Working Hour | 2,500 | ₹2,500 |
| 4 | Enagagement of tipper including cost of services of operating staff ,cost of lubricating oil ,diesel /petrol /kerosene oil, other consumables for running the plant and machinery for operation at designated sites as directed by Engineer -in - charge in the juridiction of FSC division Narbal ( Running Charges) | 1 | day | 3,750 | ₹3,750 |
| 5 | Engagement of Tractor including cost of services of operating staff , cost of lubricating oil, diesel/petrol/kerosene oil ,other consumables for facilitating execution of Flood Mitigation works as directed by Engineer-incharge in the jurisdction of FSC division Narbal (Runnig Charges) | 1 | day | 3,000 | ₹3,000 |
| 6 | Engagement of Tractor including cost of services of operating staff , cost of lubricating oil, diesel/petrol/kerosene oil ,other consumables for facilitating execution of Flood Mitigation works as directed by Engineer-incharge in the jurisdction of FSC division Narbal ( Idle Charges) | 1 | day | 1,700 | ₹1,700 |
| 7 | Supply and stacking of Good Earth at designated dumping sites in the jurisdiction of FSC Division Narbal as directed by Engineer -in-charge including loading unloading and stacking ,Complete job. | 1 | cum | 281.3 | ₹281.3 |
| 8 | Supply and stacking of stone dust at designated dumping sites in the jurisdiction of FSC Division Narbal as directed by Engineer -in-charge , including loading unloading and stacking ,Complete job. | 1 | cum | 1,100 | ₹1,100 |
| 9 | Filling of empty cement bags with earth/sand /stone dust including cost of sewing and strings but excluding cost of earth/sand/stone dust and bags at designated sites /locations in the jurisdiction of FSC Division Narbal as directed by Engineer in Charge. | 1 | Bag | 7.8 | ₹7.8 |
| 10 | Loading /unloading sand /earth filled bags in lorries, lead upto 50m. | 1 | Bag | - | - |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.56 MB
BOQ_1086377.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .