Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.7 LAdmitted-Finance | -13.50% | ₹1.7 L | L1 | Admitted-Finance |
| 2 | L2₹1.7 L+₹6,788.34 (4.05%)Admitted-Finance | -10.00% | ₹1.7 L+₹6,788.34 (4.05%) | L2 | Admitted-Finance |
| 3 | L3₹1.8 L+₹15,128.29 (9.02%)Admitted-Finance | -5.70% | ₹1.8 L+₹15,128.29 (9.02%) | L3 | Admitted-Finance |
Tender Value
₹1.9 L
EMD Value
₹3,880
Closing Date
10 Jul 2026, 4:00 pmClosed
Executive Engineer LDC Kashmir
PDD Complex Bemina
Installation of DG Set at the office of Chief Engineer JKPTCL Kashmir, which will get spared under ULDC Phase-III including commissioning foundation and other related works
2026_PDD_313057_1
LDC/01/06 of 2026
Open Tender
Civil Works
Turn-key
45 days
Bemina Srinagar
As per SBD
6 documents required · 6 mandatory
₹236
Executive Engineer LDC Kashmir
₹3,880
24 Jul 2026
20 Jun 2026
13 Jul 2026
20 Jun 2026
10 Jul 2026
25 Jun 2026
20 Jun 2026 - 24 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Civil Works | |||||
| 1.01 | Earth work in bulk excavation by manual means over areas (exceeding 30 cm in
depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth
lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. in all kinds of soils | 5.16 | Cum | 592.9 | ₹3,059.36 |
| 1.02 | Providing & laying of soling stones duly hand packed | 1.03 | Cum | 1,200 | ₹1,236 |
| 1.03 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) | 2.06 | cum | 5,202.9 | ₹10,717.97 |
| 1.04 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size). | 4.13 | cum | 7,788.4 | ₹32,166.09 |
| 1.05 | Centering and shuttering including strutting, propping etc. and removal of form for Foundations, footings, bases of columns etc. for mass concrete | 10.62 | Sqm | 286.35 | ₹3,041.04 |
| 1.06 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in
position and binding all complete upto plinth level.Thermo-Mechanically Treated bars of grade Fe-500D or more. | 101 | Kg | 123.2 | ₹12,443.2 |
| 1.07 | Brick work with common burnt clay (non-modular) bricks of class designation 7.5 in foundation and plinth including curing in Cement mortar 1:6 ( 1 cement : 6 coarse sand) | 0.72 | Cum | 7,571.55 | ₹5,451.52 |
| 1.08 | Extra for brick work in Square or rectangular pillars | - | Cum | 756.1 | - |
| 1.09 | Structural steel work in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete (Welded) | 518 | Kg | 138.2 | ₹71,587.6 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.45 MB
BOQ_1013117.xls
BOQ • 0.34 MB
sbd.pdf
Tender Documents • 1.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .