| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.1 CrAdmitted-Finance | ₹5.1 Cr | L1 | Admitted-Finance |
| 2 | L2₹6.5 Cr+₹1.4 Cr (27.1%)Admitted-Finance | ₹6.5 Cr+₹1.4 Cr (27.1%) | L2 | Admitted-Finance |
| 3 | Rejected-Technical | - | - | Rejected-Technical Technically Disqualified |
| 4 | Not Admitted-Fee | - | - | Not Admitted-Fee Fee not received |
| Sl No | Description | Qty | Unit | Raj Electricals L1 | M/s K3 Construction Company L2 |
|---|---|---|---|---|---|
| 1.00 | Supply & fixing of outdoor / indoor 3150 KVA, 33/.433 KV, 3 Phase, 50 Hz, core type, double wound, HV/LV Connected in Delta/Star, vector group Dyn11, with off load tapping swith having tapping +5% to -5% on HV Side, with first filling to Transformer oil, generally conforming to IS; 2026, complete with standard fitting and accessories. Cooper wound Transformer having no load loss 3.8 kw and load loss 34.0 kw (maximum) as per JVVNL requirement with accessories(As per Direction of site Engineer) like LV Cable Box, Buchholz Relay, Oil Temp. indicator, Marshalling Box, Winding temp. indicator, Magnetic Oil Level Gauge & HV Cable Box complete are in all respect as per JVVNL sepcification (The Transformer will be tested by DISCOM) | 2 | Each | 32,00,000 ₹64,00,000 Lowest | 39,56,000 ₹79,12,000 |
| 2.00 | All in all comprehensive maintenance of 33/0.415 KV Distribution sub station including 33 KV Indoor VCB ,Transformer (3.15MVA-2Nos) and and its complete accessories ,auto transfer switch ,repairing of LT/HT cables with terminations, LT panel with complete accessories ,sub station, Eartings etc with maintaining of log Books complete in all respect but excluding of transformer oils as and when required.Enclosed Annexure 1 | 60 | Per Month | 25,000 ₹15,00,000 Lowest | 60,000 ₹36,00,000 |
| 3.00Providing experienced and Highly skilled/skilled/ semi-skilled/Un Skilled labour for electric repair/ maintenance / operation of Air conditioning/Air cooling/Fire fighting/Lift/DG set/CCTV/EPABX or any other electromechanical systems as per requirement (one shift of 8 Hrs per day for 26 Working Days in a month) | |||||
| 4.00 | Highly skilled Labour | 60 | Each Per Month | 9,700 ₹5,82,000 Lowest | 45,000 ₹27,00,000 |
| 5.00 | Semi skilled labour | 180 | Each Per Month | 7,550 ₹13,59,000 Lowest | 25,000 ₹45,00,000 |
| 6.00 | Un skilled labour | 360 | Each Per Month | 7,300 ₹26,28,000 Lowest | 15,000 ₹54,00,000 |
| 7.00Add for extra working on Holidays. | |||||
| 8.00 | Highly skilled Labour | 260 | Each Per Day | 375 ₹97,500 Lowest | 2,500 ₹6,50,000 |
| 9.00 | Semi skilled labour | 795 | Each Per Day | 300 ₹2,38,500 Lowest | 1,000 ₹7,95,000 |
| 10.00 | Un skilled labour | 1,590 | Each Per Day | 290 ₹4,61,100 Lowest | 800 ₹12,72,000 |
Tender Value
₹5.2 Cr
EMD Value
₹10.4 L
Closing Date
16 Aug 2022, 6:00 pmClosed
Director Project
Director Project Rajasthan Housing Board Jyoti Nagar Janpath Jaipur
Construction of 33 0 440 KV GSS and 33 KV Charging Feeder work Including 5 Years Operation and Maintenance of Substation at Vidhyak Awas Pariyojana Jyoti Nagar West Jaipur
2022_RHBCE_287218_1
Director Project_02/2022-23
Open Tender
Electrical Works
Percentage
365 days
Jaipur
Please refer Tender documents.
3 documents required · 3 mandatory
₹1,180
As per NIT
₹10.4 L
Yes
1 Sept 2022
18 Jul 2022
23 Aug 2022
18 Jul 2022
16 Aug 2022
18 Jul 2022
Amount
Supply & fixing of outdoor / indoor 3150 KVA, 33/.433 KV, 3 Phase, 50 Hz, core type, double wound, HV/LV Connected in Delta/Star, vector group Dyn11, with off load tapping swith having tapping +5% to -5% on HV Side, with first filling to Transformer oil, generally conforming to IS; 2026, complete with standard fitting and accessories. Cooper wound Transformer having no load loss 3.8 kw and load loss 34.0 kw (maximum) as per JVVNL requirement with accessories(As per Direction of site Engineer) like LV Cable Box, Buchholz Relay, Oil Temp. indicator, Marshalling Box, Winding temp. indicator, Magnetic Oil Level Gauge & HV Cable Box complete are in all respect as per JVVNL sepcification (The Transformer will be tested by DISCOM)
All in all comprehensive maintenance of 33/0.415 KV Distribution sub station including 33 KV Indoor VCB ,Transformer (3.15MVA-2Nos) and and its complete accessories ,auto transfer switch ,repairing of LT/HT cables with terminations, LT panel with complete accessories ,sub station, Eartings etc with maintaining of log Books complete in all respect but excluding of transformer oils as and when required.Enclosed Annexure 1
Providing experienced and Highly skilled/skilled/ semi-skilled/Un Skilled labour for electric repair/ maintenance / operation of Air conditioning/Air cooling/Fire fighting/Lift/DG set/CCTV/EPABX or any other electromechanical systems as per requirement (one shift of 8 Hrs per day for 26 Working Days in a month)
Highly skilled Labour
Semi skilled labour
Un skilled labour
Add for extra working on Holidays.
Highly skilled Labour
Semi skilled labour
Un skilled labour
Bidder Name
Amount
Raj Electricals(GSTN-08AGBPS1419A1ZV)
M/s K3 Construction Company(GSTN-08AGTPJ0243R1ZR)
M/s K3 Construction Company
M/s K3 Construction Company
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.72 MB
BOQ_509803.xls
BOQ • 0.25 MB
cagr.pdf
Tender Documents • 4.71 MB
gs.pdf
Tender Documents • 2.34 MB
tbid.pdf
Tender Documents • 15.24 MB
tnc.pdf
Tender Documents • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .