Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical 623 ARCONS INFRASTRUCTURES AND CONSTRUCTION PVT LTD NAGPUR ROAD CHHINDWARA CHHINDWARA MADHYA PRADESH 480001 | CHHINDWARA | MADHYA PRADESH | 480001 | Admitted-Fee/PreQual/Technical |
| 2 | Admitted-Fee/PreQual/Technical AT HOTEL SUSHILA INDIRA CHOWK KANTABANJI DIST BOLANGIR ODISHA | KANTABANJI | BOLANGIR | ODISHA | Admitted-Fee/PreQual/Technical |
| 3 | Admitted-Fee/PreQual/Technical AT POST BANGOMUNDA DIST BALANGIR 767040 | BALANGIR | BALANGIR | ODISHA | 767040 | Admitted-Fee/PreQual/Technical |
| 4 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
| 5 | Admitted-Fee/PreQual/Technical AT PO LADUGAON DIST KALAHANDI ODISHA | LADUGAON | KALAHANDI | ODISHA | 766019 | Admitted-Fee/PreQual/Technical |
Tender Value
₹27.2 Cr
Closing Date
1 Oct 2022, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Chief Construction Engineer, UIP, Mukhiguda
Office of the Chief Construction Engineer, UIP, Mukhiguda 766026
Improvement of Service Road with Black Topping Left Main Canal from RD 00Km to 51.4Km under LCD Division -I, Kusumkhunti
2022_CEUIP_81022_3
BID ID- CCE,UIIP-01(01-08)/2022-23
Open Tender
Civil Works - Roads
Percentage
330 days
Kusumkhunti
As per DTCN
3 documents required · 3 mandatory
₹10,000
Exempted
Office of CCE,UIP ,Mukhiguda
7 Dec 2022
7 Sept 2022
3 Oct 2022
7 Sept 2022
1 Oct 2022
13 Sept 2022
7 Sept 2022 - 12 Sept 2022
12 Sept 2022
90 days
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Scarifying the existing bituminous road surface to a depth of 50 mm and disposal of scarified materials with in all lifts,delifts and lead up to 1000 meters etc. including hire and running charges of all the machineries and T&P,all labours, all taxes,labour cess etc. complete as per drawing, design & specification as per direction of Engineer-in-charge. | 54,262.5 | Sqm | 3.6 | ₹1,95,345 |
| - | Reworking the scarified bituminous surface suitably after supplementing the base materials with sand and compacting finished surface as per clause 501.8.3.2 of MORTH Specification for Road and Bridge Works (4th Revision) including all cost and conveyance of all materials with all labours, hire and running charges of all machineries, T&P, royalty of all materials, all taxes, labour cess etc. complete as per approved drawing, design and specification as per direction of Engineer-in-charge. | 72,350 | Sqm | 10.4 | ₹7,52,440 |
| - | Providing, laying, spreading and compacting stone aggregates of specific size to water bound macadam Grade-III specification including spreading in uniform thickness, hand packing, rolling with 3 wheeled steel roller 8-10 tons in stages to proper grade and camber, applying and brooming requisite type of screening/binding materials to fill up the interstices of coarse aggregate, watering and compacting to the required density as per Clause 404 of MoSRT&H Specifications for Road & Bridge works (4th Revision) including all cost and conveyance of all materials with all labours,hire and running charges of all machineries, royalty of all materials, all taxes, labour cess etc. complete as per approved drawing, design and specification as per direction of Engineer-in-charge. | 7,549.95 | Cum | 2,147.5 | ₹1,62,13,517.63 |
| - | Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density etc. complete as per Clause 406 of MoSRT&H Specifications for Road & Bridge works (4th Revision) including all cost and conveyance of all materials with all labours,hire and running charges of all machineries, royalty of all materials, all taxes, labour cess etc. complete as per approved drawing, design and specification as per direction of Engineer-in-charge. | 34,669.5 | Cum | 1,967.7 | ₹6,82,19,175.15 |
| - | Providing and applying Prime coat with bitumen Emulsion using bitumen emulsion pressure distributor at the rate of 0.60 kg per sqm on the prepared bituminous/granular surface cleaned mechanical broom as per clause 502 of MoSRT&H specifications for road and bridge works(4th Revision) including all cost and conveyance of all materials with all labours,hire and running charges of all machineries, royalty of all materials, all taxes, labour cess etc. complete as per approved drawing, design and specification as per direction of Engineer-in-charge. | 2,31,130 | Sqm | 26.8 | ₹61,94,284 |
| - | Providing and applying tack coat with bitumen Emulsion using bitumen emulsion pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous/granular surface cleaned mechanical broom as per clause 503 of MoSRT&H specifications for road and bridge works(4th Rev.) including all cost and conveyance of all materials with all labours,hire and running charges of all machineries, royalty of all materials, all taxes, labour cess etc. complete as per approved drawing, design and specification as per direction of Engineer-in-charge. | 2,31,130 | Sqm | 9.5 | ₹21,95,735 |
| - | Providing and laying bituminous macadam with 100-120 TPH hot mix plant producing an average output of 75 tones per hour using crushed stone aggregates of specified grading premixed with bituminous binder of 60/70 penetration grade of bitumen, transported to site, laid over a previously prepared surface with a hydrostatic paver finisher with sensor control to the required grade, level and alignment and rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per Clause 504 of MoSRT&H Specifications for Road & Bridge works (4th Revision)including all cost and conveyance of all materials with all labours,hire and running charges of all machineries, royalty of all materials, all taxes, labour cess etc. complete as per approved drawing, design and specification as per direction of Engineer-in-charge. | 11,556.5 | Cum | 7,905.2 | ₹9,13,56,443.8 |
| - | Providing and laying Semi Dense Bituminous concrete with 100-120 TPH batch type HMP producing an average output of 75 tones per hour using crushed stone aggregates of specified grading, premixed with bituminous binder of 60/70 penetration grade of bitumen @ 4.5 to 5 per cent of mix and filler etc. transported to site, laid over a previously prepared surface with a hydrostatic paver finisher with sensor control to the required grade, level and alignment and rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per Clause 508 of MoSRT&H Specifications for Road & Bridge works (4th Revision) including all cost and conveyance of all materials with all labours,hire and running charges of all machineries, royalty of all materials, all taxes, labour cess etc. complete as per approved drawing, design and specification as per direction of Engineer-in-charge. | 5,778.25 | Cum | 10,826.8 | ₹6,25,59,957.1 |
| - | Earth work in excavation in hard soil within 50m initial lead and 1.5m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth including all cost and conveyance of all materials with all labours,hire and running charges of all machineries, royalty of all materials, all taxes, labour cess etc. complete as per approved drawing, design and specification as per direction of Engineer-in-charge. | 21,119.48 | Cum | 162.8 | ₹34,38,251.34 |
| - | Collecting, supplying and laying moorum in layers not exceeding 100mm watering & compacting to the required density in O.M.C. with PRR including all cost and conveyance of all materials with all labours,hire and running charges of all machineries, royalty of all materials, all taxes, labour cess etc. complete as per approved drawing, design and specification as per direction of Engineer-in-charge. | 20,140.4 | Cum | 707.4 | ₹1,42,47,318.96 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
cancelled_1.pdf
pdf • 0.47 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.22 MB
DTCN3.pdf
Tender Documents • 11.77 MB
BOQ_409625.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .