Chief Construction Engineer
Office of the CCE, LSP, Laltikra, Balangir.
Renovation of Jamkata Tank with provision of changing room, bathing ghat, stone pitching, turfing, plantation on the embankment and grazing area for cattle at Kusmel South RR Colony under LSIP, Balangir.
2026_CEEBO_129849_3
3/2026-27 of CCE,LSP, Balangir
Open Tender
Civil Works - Others
183 days
Kusmel South
Tender Cost, EMD, PAN, Valid RC, Valid GSTIN, Affidavit, No Relation Certificate, undertakings and any other document as per DTCN.
3 documents required · 3 mandatory
₹10,000
₹1.3 L
Yes
Office of the CCE, LSP, Laltikra, Balangir
28 May 2026
28 May 2026
16 Jun 2026
28 May 2026
12 Jun 2026
28 May 2026
28 May 2026 - 5 Jun 2026
5 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1 | Excavation ,loading,unloading and carriage by mechanical means of all kinds of soil including stoney earth,gravel and moorum etc interspread with boulders upto 1/2 cum size with all lifts and delifts including trimmimg of slopes and bed to design section and depositing the excavated materials away from works site including T & P required for the work, sundries, labour and labour cess etc.complete as per specification and direction of Engineer-in-charge. | 29,470.7 | Cum | 86.6 | ₹25,52,162.62 | BI01010001010000000000000515BI0100001113 |
| 2 | Watering earthwork upto OMC condition and compaction by sheepfoot rollers and dozer in layers not exceeding 22.5 cm to 95% dry density including hire and running charges of all the machineries including labour and labour cess, T&P required for the work etc.complete as per direction of Engineer-in-charge. (measurement to be taken on the finished compacted section of the fill under OMC condition). | 4,987.5 | Cum | 47.2 | ₹2,35,410 | BI01010001010000000000000515BI0100001114 |
| 3 | Excavation, loading and carriage by mechanical means in D.I. rock, laterite and soft rock not requiring blasting interspread with boulders upto 1/2 cum size with all lifts and delifts including trimming of slopes and bed to design section and depositing the excavated materials away from work site as per the specification including cost & conveyance, T&P required for the work, labour and labour cess as directed by the Engineer-in-charge within an initial lead of 1km from the place of excavation complete. | 589.41 | Cum | 104.8 | ₹61,770.17 | BI01010001010000000000000515BI0100001115 |
| 4 | Excavation of foundation in hard or gravelly soil, stiff black cotton soil & stoney earth mixedwith boulder with all leads lifts and delifts including dressing, levelling the bed and depositing the excavated materials away from the work site including T & P required for the work, sundries, labour and labour cess etc.complete as per specification and direction of Engineer-in-charge. | 1,577.73 | Cum | 276.9 | ₹4,36,873.44 | BI01010001010000000000000515BI0100001116 |
| 5 | Filling foundation and plinth with sand of approved quality,watered and rammed including cost & conveyance of all materials, royalty of materials, T & P required for the work, sundries, labour and labour cess etc.complete as per specification and direction of Engineer-in-charge. | 490.29 | Cum | 508.7 | ₹2,49,410.52 | BI01010001010000000000000515BI0100001117 |
| 6 | Cement Concrete M15 with 40 mm hard granite crusher broken aggregates metal per 1 cum free from weathered skin surface, dust and any other deleterious materials including rigid smooth centering machine mixing, watering, compacting with vibrators, hoisting and laying in position for a finished smooth surface and curing with all leads, lifts and delifts, hire and running charges of machineries construction including cost & conveyance of all materials, royalty of materials, fitting and fixing of materials, T & P required for the work, sundries, labour and labour cess etc.complete as per specification and direction of Engineer-in-charge.(ground floor) | 1,161.07 | Cum | 4,743 | ₹55,06,955.01 | BI01010001010000000000000515BI0100001118 |
| 7 | RCC M20 with HG (CB) 20 mm size aggregates metal per 1 cum free from weathered skin surface, dust and any other deleterious materials including rigid smooth centering machine mixing, watering, compacting with vibrators, hoisting and laying in position for a finished smooth surface and curing with all leads, lifts and delifts, hire and running charges of machineries construction including cost & conveyance of all materials, royalty of materials, fitting and fixing of materials, T & P required for the work, sundries, labour and labour cess etc.complete as per specification and direction of Engineer-in-charge.(ground floor) | 56.11 | Cum | 5,466.7 | ₹3,06,736.54 | BI01010001010000000000000515BI01000011191 |
| 8 | Supply, fitting, fixing, straightening, bending, binding and placing in position of uncoated HYSD bar reinforcement complete including cost & conveyance of all materials, fitting and fixing of materials, T & P required for the work, sundries, labour and labour cess etc.complete as per specification and direction of Engineer-in-charge. | 33.67 | Qntl | 9,316.8 | ₹3,13,696.66 | BI01010001010000000000000515BI01000011192 |
| 9 | 2.5 cm AS flooring with Cement Concrete (1:2:4) with 12 mm to 20 mm hard granite crusher broken aggregates metal per 1 cum free from weathered skin surface, dust and any other deleterious materials including cement punning, rigid smooth centering machine mixing, watering, compacting with vibrators, hoisting and laying in position for a finished smooth surface and curing with all leads, lifts and delifts, hire and running charges of machineries construction including cost & conveyance of all materials, royalty of materials, fitting and fixing of materials, T & P required for the work, sundries, labour and labour cess etc.complete as per specification and direction of Engineer-in-charge. | 30.47 | Cum | 6,990.3 | ₹2,12,994.44 | BI01010001010000000000000515BI01000011193 |
| 10 | Rigid smooth centering and shuttering for R.C.C works including false works and dismentalling there after casting including cost, fitting and fixing of materials, T & P required for the work, sundries, labour and labour cess etc.complete as per specification and direction of Engineer-in-charge. (a) Foundation & Plinth. | 3,192.05 | Sqm | 249.1 | ₹7,95,139.66 | BI01010001010000000000000515BI01000011194 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.52 MB
DTCNTankKusmelSouth.pdf
Tender Documents • 2.40 MB
BOQ_592766.xls
BOQ • 0.39 MB
Download all tender documents and submit your bid