Loading…
Loading…
| # | Company | Offered Item | Amount | Rank |
|---|---|---|---|---|
| 1 | L1₹2.5 Cr Additions/Alterations in GPRA building at Sector-VII, Phase-I, Antop Hill, Mumbai-37 during 2024-25. SH:Full upgradation of 88 Nos. GPRA Qtrs (Type-II and Type-III) including Electrical works. | Additions/Alterations in GPRA building at Sector-VII, Phase-I, Antop Hill, Mumbai-37 during 2024-25. SH:Full upgradation of 88 Nos. GPRA Qtrs (Type-II and Type-III) including Electrical works. | ₹2.5 Cr | L1 |
| 2 | L2₹2.7 Cr+₹15.4 L (6.14%) Additions/Alterations in GPRA building at Sector-VII, Phase-I, Antop Hill, Mumbai-37 during 2024-25. SH:Full upgradation of 88 Nos. GPRA Qtrs (Type-II and Type-III) including Electrical works. | Additions/Alterations in GPRA building at Sector-VII, Phase-I, Antop Hill, Mumbai-37 during 2024-25. SH:Full upgradation of 88 Nos. GPRA Qtrs (Type-II and Type-III) including Electrical works. | ₹2.7 Cr+₹15.4 L (6.14%) | L2 |
| 3 | L3₹2.9 Cr+₹39.0 L (15.6%) Additions/Alterations in GPRA building at Sector-VII, Phase-I, Antop Hill, Mumbai-37 during 2024-25. SH:Full upgradation of 88 Nos. GPRA Qtrs (Type-II and Type-III) including Electrical works. | Additions/Alterations in GPRA building at Sector-VII, Phase-I, Antop Hill, Mumbai-37 during 2024-25. SH:Full upgradation of 88 Nos. GPRA Qtrs (Type-II and Type-III) including Electrical works. | ₹2.9 Cr+₹39.0 L (15.6%) | L3 |
| 4 | L4₹3.2 Cr+₹73.3 L (29.3%) Additions/Alterations in GPRA building at Sector-VII, Phase-I, Antop Hill, Mumbai-37 during 2024-25. SH:Full upgradation of 88 Nos. GPRA Qtrs (Type-II and Type-III) including Electrical works. | Additions/Alterations in GPRA building at Sector-VII, Phase-I, Antop Hill, Mumbai-37 during 2024-25. SH:Full upgradation of 88 Nos. GPRA Qtrs (Type-II and Type-III) including Electrical works. | ₹3.2 Cr+₹73.3 L (29.3%) | L4 |
| 5 | - | - | - |
| Sl No | Description | Qty | Unit | Harshal Construction L4 | MH BUILDERS L3 | Shanti Construction L2 | RKR ENGINEERS L1 |
|---|---|---|---|---|---|---|---|
| 1 | Civil Work | - | - | -9 ₹2,51,13,608.52 | -18.26 ₹2,25,58,091.87 | -26.66 ₹2,02,39,912.62 | -33.69 ₹1,82,99,817.37 Lowest |
| 2 | Electrical Work | - | - | -7 ₹72,18,840.42 | -18.26 ₹63,44,817.38 | -18.9 ₹62,95,139.33 Lowest | -13.69 ₹66,99,549.64 |
Tender Value
₹3.5 Cr
EMD Value
₹7.1 L
Closing Date
7 Mar 2025, 3:00 pmClosed
EE-Mumbai-IV
Vikrant Verma
EXECUTIVE ENGINEER, MUMBAI-IV, CPWD, MUMBAI
Additions/Alterations in GPRA building at Sector-VII, Phase-I, Antop Hill, Mumbai-37 during 2024-25. SH:Full upgradation of 88 Nos. GPRA Qtrs (Type-II and Type-III) including Electrical works.
104654
196/EE/Mumbai-IV/18/CE/Mumbai-II/2024-25
OPEN
Civil Works - Buildings
NCB
10 months
Mumbai, Maharashtra
7 documents required · 7 mandatory
₹7.1 L
Not Applicable
7 Mar 2025
28 Feb 2025
7 Mar 2025
7 Mar 2025
3 Mar 2025
stage.html
html • 0.08 MB
boq_comp_chart.xls
xls
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
PART+A.pdf
document • 0.69 MB
PART+B.pdf
document • 0.85 MB
PART+C.pdf
document • 0.69 MB
PART+D.pdf
document • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .