Loading…
Loading…
Tender Value
Refer Docs
EMD Value
₹1.6 L
Closing Date
21 Jul 2026, 10:00 am
DSCO SAS NAGAR
SOIL CONSERVATION COMPLEX NEAR DARA STUDIO
Construction of stone masonry recharging cum silt collection structure run off control structure and crate wire structure in village khatana khad bathlour khad rajgiri dhamana jhandian gharbhagga and new malikpur subdivision nurpurbedi ropar
2026_DOA_171410_1
DSWC/MOH/2026-2027/04
Open Tender
Civil Works
90 days
ROPAR
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,500
₹1.6 L
6 Jul 2026
6 Jul 2026
21 Jul 2026
6 Jul 2026
21 Jul 2026
6 Jul 2026
DEPARTMENT OF SOIL AND WATER CONSERVATION, PUNJAB
Tender No. DSWC/DSCO/MOH/04
Construction of Stone Masonary Water Recharging Cum Silt Collection Structure,Run Off Control Structure & Wire Crates in Village:- Khatana,Khad-Bathlor,Khad-Rajgiri,Dhamana,Jhandiana,Gharbhagga and New Malikpur Under Sub Division Nurpur Bedi, Ropar Tehsil Shri Anandpur Sahib and ropar.District :-Roopnagar
RATES FOR CIVIL WORK( Approved by CCS PUNJAB Chandigarh)
Name & Address of Firm/ Bidder
Total Estimated Cost
Quoted by Contractor (as %age less of estimated Amount) Less (-%) 0 Amount Quoted
S.No. Item of Work Qty. Unit Rate Total
1 For Construction: Stone Masonary Water Recharging Cum Silt Collection Structure and Crate Wire Structure Project Village:-Gharbhagga Tehsil:-Shri Anandpur Sahib, Block:- Nurpur Bedi, District:- Roopnagar (PMKSY)
Estimate San.No. 8600 Dated 09-06-2026 for Rs. 1652600.00/-
A. Work:-Stone Masonary Water Recharging Cum Silt Collection Structure and Crate Wire Structure
(No.of Structure-04)
1.01 E/w excavation in gravel soil for trench of masonry str. CSR 6.19 as per PWD specifications 73.04 Per Cum 38.98
1.02 C.C. 1:8:16 in foundation with 40 mm gauge stone aggregate CSR 10.6 b (ii) as per PWD specifications. 12.64 Per Cum 3433.36
1.03 Squared Rubbled Masonary 1:5 Below Ground Level and Below Plinth Level CSR 12.17 92.34 Per Cum 5602.51
1.04 Square rubble boulder masonary 1:5 above plinth level CSR 12.17 & 12.25 as per PWD specifications. 43.83 Per Cum 6089.23
1.05 Cement concerete 1:2:4 with stone aggregate CSR 10.13 a (ii) as per PWD specifications. 15.42 Per Cum 5058.9
1.06 Plaster 1:4 12.5 mm thick CSR 15.9 as per PWD specifications. CSR 15.9 103.17 Per Sqm 213.54
1.07 Carriage of Sand for quarry to dump site 55.76 Per Cum 222.37
1.08 Carriage of Bajri for quarry to dump site 13.88 Per Cum 222.37
1.09 Carriage of gatka for quarry to dump site 12.64 Per Cum 222.37
1.1 Carriage of boulder for quarry to dump site 149.74 Per Cum 222.37
1.11 Sub-Total-B
Total A + B 982105
Crate Wire Structure
1.12 E/w excavation in gravel soil for trench of masonry str. CSR 6.19 as per PWD specifications 9 Cum 38.98
1.13 Weaving of wire crates in size 15x15cm as per PWD specifications CSR 23.29 38 Sq.m 197
1.14 Spreading of wire crates as per PWD specifications CSR 23.37 38 Cum 73.71
1.15 Filling of stones into wire crates hand pack as per PWD specifications CSR 23.32 9 Cum 1458.04
1.16 Carriage of Stone/Boulder From Quary Site to Dump Site CSR 5.2(i) 9 Cum 222.37
Sub-Total 25761.49
Grand-Total Say 25762
1.17 E/w excavation in gravel soil for trench of masonry str. CSR 6.19 as per PWD specifications 10.8 Cum 38.98
1.19 Weaving of wire crates in size 15x15cm as per PWD specifications CSR 23.29 88.48 Sq.m 197
1.2 Spreading of wire crates as per PWD specifications CSR 23.37 88.48 Cum 73.75
1.21 Filling of stones into wire crates hand pack as per PWD specifications CSR 23.32 22.32 Cum 1458.04
1.22 Carriage of Stone/Boulder From Quary Site to Dump Site CSR 5.2(i) 22.32 Cum 222.37
Sub-Total 61883.7
Grand-Total Say 61883
1.23 E/w excavation in gravel soil for trench of masonry str. CSR 6.19 as per PWD specifications 74.88 Cum 38.98
1.24 Weaving of wire crates in size 15x15cm as per PWD specifications CSR 23.29 439.28 Sq.m 197
1.25 Spreading of wire crates as per PWD specifications CSR 23.37 439.28 Cum 73.71
1.26 Filling of stones into wire crates hand pack as per PWD specifications CSR 23.32 151.04 Cum 1458.04
1.27 Carriage of Stone/Boulder From Quary Site to Dump Site CSR 5.2(i) 151.04 No 222.37
SUB-Total 375645
1.28 E/w excavation in gravel soil for trench of masonry str. CSR 6.19 as per PWD specifications 40.8 Cum 38.98
1.29 Weaving of wire crates in size 15x15cm as per PWD specifications CSR 23.29 254.42 Sq.m 197
1.3 Spreading of wire crates as per PWD specifications CSR 23.37 254.42 Cum 73.71
1.31 Filling of stones into wire crates hand pack as per PWD specifications CSR 23.32 81.4 Cum 1458.04
1.32 Carriage of Stone/Boulder From Quary Site to Dump Site CSR 5.2(i) 81.4 No 222.37
SUB-Total 207249
2 STONE WIRE CRATES works Village:-KHATANA ,Tehsil Shri Anandpur Sahib, Block:-Nurpur Bedi, District:-Roopnagar (N0.of Structure :-5) PMKSY
B Estimate San.No. 1039 Dated 04-06-2026 for Rs. 702000/
Work:-Crate Wire Structure
2.01 E/w excavation in gravel soil for trench of masonry str. CSR 6.19 as per PWD specifications 18 Cum 38.98
2.02 Weaving of wire crates in size 15x15cm as per PWD specifications CSR 23.29 148.2 Sq.m 197
2.03 Spreading of wire crates as per PWD specifications CSR 23.37 148.2 Cum 73.75
2.04 Filling of stones into wire crates hand pack as per PWD specifications CSR 23.32 38.25 Cum 1458.04
2.05 Carriage of Stone/Boulder From Dump Site to work Site lead km in choe bed CSR 5.2(i) 38.25 Cum 232.3
Total Quantity Of Two Structure 2
Grand-Total Say 210965
2.06 E/w excavation in gravel soil for trench of masonry str. CSR 6.19 as per PWD specifications 30 Cum 38.98
2.07 Weaving of wire crates in size 15x15cm as per PWD specifications CSR 23.29 245.3 Sq.m 197
2.08 Spreading of wire crates as per PWD specifications CSR 23.37 245.3 Cum 73.75
2.09 Filling of stones into wire crates hand pack as per PWD specifications CSR 23.32 63.75 Cum 1458.04
2.1 Carriage of Stone/Boulder From Dump Site to work Site lead km in choe bed CSR 5.2(i) 63.75 No 232.3
Total Quantity Of Two Structure 2
Grand-Total Say 350687
2.11 E/w excavation in gravel soil for trench of masonry str. CSR 6.19 as per PWD specifications 24 Cum 38.98
2.12 Weaving of wire crates in size 15x15cm as per PWD specifications CSR 23.29 196.75 Sq.m 197
2.13 Spreading of wire crates as per PWD specifications CSR 23.37 196.75 Cum 73.75
2.14 Filling of stones into wire crates hand pack as per PWD specifications CSR 23.32 51 Cum 1458.04
2.15 Carriage of Stone/Boulder From Quary Site to Dump Site CSR 5.2(i) 51 Cum 232.3
Sub-Total 140412
Grand-Tota 702000
3 Stone Masonary Run Off Control Structure works Village:-KHATANA ,Tehsil Shri Anandpur Sahib, Block:-Nurpur Bedi, District:-Roopnagar (N0.of Structure :-2) PMKSY
C Estimate San.No.1100 Dated 10-06-2026 for Rs. 277400/
3.01 E/w excavation in gravel soil for trench of masonry str. CSR 6.19 as per PWD specifications 20.14 Cum 38.98
3.02 C.C. 1:8:16 in foundation with 40 mm gauge stone aggregate CSR 10.6 b (ii) as per PWD specifications. 3.12 Cum 3433.35
3.03 Squared Rubbled Masonary 1:5 Below Ground Level and Below Plinth Level CSR 12.17 33.02 Cum 5602.51
3.04 Square rubble boulder masonary 1:5 above plinth level CSR 12.17 & 12.25 as per PWD specifications. 10.66 Cum 6089.23
3.05 Cement concerete 1:2:4 with stone aggregate CSR 10.13 a (ii) as per PWD specifications. 1.62 Cum 5058.9
Plaster 1:4 12.5 mm thick CSR 15.9 as per PWD specifications. CSR 15.9 36.98 No 213.54
Sub-Total 277495
Grand-Total Say 277400
4 Stone Masonary Run Off Control Structure & Crate Wire Structure works Village:-Jhandiana ,Tehsil Shri Anandpur Sahib, Block:-Nurpur Bedi, District:-Roopnagar (N0.of Structure :-6) PMKSY
D Estimate San.No.1042 Dated 05-06-2026 for Rs. 655100/
Stone Masonary Run Off Control Structure :-3 No.
4.01 E/w excavation in gravel soil for trench of masonry str. CSR 6.19 as per PWD specifications 9.97 Cum 38.98
4.02 C.C. 1:8:16 in foundation with 40 mm gauge stone aggregate CSR 10.6 b (ii) as per PWD specifications. 1.52 Cum 3433.35
4.03 Random Masonary 1:5 Below Ground Level and Below Plinth Level CSR 12.17 13.66 Cum 5144.24
4.04 Random boulder masonary 1:5 above plinth level CSR 12.17 & 12.25 as per PWD specifications. 3.14 Cum 5630.96
4.05 Cement concerete 1:2:4 with stone aggregate CSR 10.13 a (ii) as per PWD specifications. 0.51 Cum 5058.91
4.06 Plaster 1:4 12.5 mm thick CSR 15.9 as per PWD specifications. CSR 15.9 15.33 No 213.54
Sub-Total-A 99412
4.07 Carriage of Sand for quarry to dump site 7.11 Per Cum 241.14
4.08 Carriage of Bajri for quarry to dump site 0.46 Per Cum 241.14
4.09 Carriage of gatka for quarry to dump site 1.52 Per Cum 241.14
4.1 Carriage of boulder for quarry to dump site 18.48 Per Cum 241.14
Sub-Total-B 6649
Grand-Total A + B
4.11 E/w excavation in gravel soil for trench of masonry str. CSR 6.19 as per PWD specifications 7.95 Cum 38.98
4.12 C.C. 1:8:16 in foundation with 40 mm gauge stone aggregate CSR 10.6 b (ii) as per PWD specifications. 1.21 Cum 3433.35
4.13 Random Masonary 1:5 Below Ground Level and Below Plinth Level CSR 12.17 10.54 Cum 5144.24
4.14 Random boulder masonary 1:5 above plinth level CSR 12.17 & 12.25 as per PWD specifications. 1.08 Cum 5630.96
4.15 Cement concerete 1:2:4 with stone aggregate CSR 10.13 a (ii) as per PWD specifications. 0.39 Cum 5058.91
4.16 Plaster 1:4 12.5 mm thick CSR 15.9 as per PWD specifications. CSR 15.9 10.53 No 213.54
Sub-Total-A 68987
4.17 Carriage of Sand for quarry to dump site 5.02 Per Cum 241.14
4.18 Carriage of Bajri for quarry to dump site 0.35 Per Cum 241.14
4.19 Carriage of gatka for quarry to dump site 1.21 Per Cum 241.14
4.2 Carriage of boulder for quarry to dump site 12.78 Per Cum 241.14
Sub-Total-B 4668
Grand-Total A + B
4.21 E/w excavation in gravel soil for trench of masonry str. CSR 6.19 as per PWD specifications 8.88 Cum 38.98
4.22 C.C. 1:8:16 in foundation with 40 mm gauge stone aggregate CSR 10.6 b (ii) as per PWD specifications. 1.34 Cum 3433.35
4.23 Random Masonary 1:5 Below Ground Level and Below Plinth Level CSR 12.17 12.11 Cum 5144.24
4.24 Random boulder masonary 1:5 above plinth level CSR 12.17 & 12.25 as per PWD specifications. 1.56 Cum 5630.96
4.25 Cement concerete 1:2:4 with stone aggregate CSR 10.13 a (ii) as per PWD specifications. 0.43 Cum 5058.91
4.26 Plaster 1:4 12.5 mm thick CSR 15.9 as per PWD specifications. CSR 15.9 12.7 No 213.54
Sub-Total-A 80915
4.27 Carriage of Sand for quarry to dump site 5.85 Per Cum 241.14
4.28 Carriage of Bajri for quarry to dump site 0.39 Per Cum 241.14
4.29 Carriage of gatka for quarry to dump site 1.34 Per Cum 241.14
4.3 Carriage of boulder for quarry to dump site 15.04 Per Cum 241.14
Grand-Total A + B 5453
STONE CRATE WIRE STRUCTURE :- 3 No.
4.31 E/w excavation in gravel soil for trench of masonry str. CSR 6.19 as per PWD specifications 69 Cum 38.98
4.32 Weaving of wire crates in size 15x15cm as per PWD specifications CSR 23.29 506.8 Sq.m 197
4.33 Spreading of wire crates as per PWD specifications CSR 23.37 506.8 Cum 73.71
4.34 Filling of stones into wire crates hand pack as per PWD specifications CSR 23.32 144.9 Cum 1458.04
4.35 Carriage of Stone/Boulder From Quary Site to Dump Site CSR 5.2(i) 144.9 Cum 241.14
4.36 Sign Board 1 No 3000
Sub-Total 389096
5 STONE WIRE CRATES works Village:-Dhamana ,Tehsil Shri Anandpur Sahib, Block:-Nurpur Bedi, District:-Roopnagar (N0.of Structure :-3) PMKSY
E Estimate San.No. 1000 Dated 03-06-2026 for Rs. 674600/
Work:-Crate Wire Structure
5.01 E/w excavation in gravel soil for trench of masonry str. CSR 6.19 as per PWD specifications 125 Cum 38.98
5.02 Weaving of wire crates in size 15x15cm as per PWD specifications CSR 23.29 917.38 Sq.m 197
5.03 Spreading of wire crates as per PWD specifications CSR 23.37 917.38 Cum 73.75
5.04 Filling of stones into wire crates hand pack as per PWD specifications CSR 23.32 252.25 Cum 1458.04
5.05 Carriage of Stone/Boulder From Dump Site to work Site lead km in choe bed CSR 5.2(i) 252.25 Cum 212.43
Grand-Total Say 674600
6 STONE WIRE CRATES works Village:-Dhamana ,Tehsil Shri Anandpur Sahib, Block:-Nurpur Bedi, District:-Roopnagar (N0.of Structure :-3) PMKSY
F Estimate San.No. 1098 Dated 10-06-2026 for Rs. 538500/
Work:-Crate Wire Structure
6.01 E/w excavation in gravel soil for trench of masonry str. CSR 6.19 as per PWD specifications 93 Cum 38.98
6.02 Weaving of wire crates in size 15x15cm as per PWD specifications CSR 23.29 724.21 Sq.m 197
6.03 Spreading of wire crates as per PWD specifications CSR 23.37 724.21 Cum 73.75
6.04 Filling of stones into wire crates hand pack as per PWD specifications CSR 23.32 202.85 Cum 1458.04
6.05 Carriage of Stone/Boulder From Dump Site to work Site lead km in choe bed CSR 5.2(i) 202.85 Cum 212.43
Grand-Total Say 538500
7 STONE WIRE CRATES works Village:-Khad Bathlor ,Tehsil Shri Anandpur Sahib, Block:-Nurpur Bedi, District:-Roopnagar (N0.of Structure :-6) PMKSY
G Estimate San.No. Dated:- for Rs. 1373500/
Work:-Crate Wire Structure
7.01 E/w excavation in gravel soil for trench of masonry str. CSR 6.19 as per PWD specifications 225 Cum 38.98
7.02 Weaving of wire crates in size 15x15cm as per PWD specifications CSR 23.29 1710.5 Sq.m 197
7.03 Spreading of wire crates as per PWD specifications CSR 23.37 1710.5 Cum 73.75
7.04 Filling of stones into wire crates hand pack as per PWD specifications CSR 23.32 527.5 Cum 1458.04
7.05 Carriage of Stone/Boulder From Dump Site to work Site lead km in choe bed CSR 5.2(i) 527.5 Cum 245.55
7.06 Sign Board 1 No 3000
Grand-Total Say 1373500
1.0 - Name of Work :- Stone Masonary Water Recharging Structure Project No.5, Village - New Malikpur ,Tehsil and Distt.- Rupnagar ,Punjab
Estimate San.No. 8045 Dated 25-05-2026 for Rs. 20,34,800/
A. Labour Cost of Stone Masonary Water Recharging Structure
SCHEME :- SWC-37
Sno. Item of Work Quantity Unit Rate in (Rupees) Total in Rupees
1 Earthwork Excavation in foundation 91.39 cum 37
2 C.Conc.(gatka) in foundation in1:8:16 13.74 cum 3259
3 C.Conc.(Bajri) in1:2:4 0.000 cum 4802
4 Sq rubble masonry in 1:5 in foundation 94.47 cum 5318
5 Sq rubble masonry in 1:5 above foundation 79.45 cum 5780
6 12.5 mm thick cement sand plaster in 1:4 103.84 sqm 202.7
7 Waving of net including binding the sides make crate of 15 cm x 15 cm 50 sqm 187
8 Spreding of wire net over pitching 50 sqm 70
9 inclding stone intothe crest hand pitching 12 cum 1384
GST diffrence of 12 to 18 Percent @ 5.35%
Total Abstract cost of Labour charges
1.0 - Name of Work :- Stone Masonary Water Recharging Structure Project No.6, Village - New Malikpur ,Tehsil and Distt.- Rupnagar ,Punjab
A. Labour Cost of Stone Masonary Water Recharging Structure
SCHEME :- SWC-37
Sno. Item of Work Quantity Unit Rate in (Rupees) Total in Rupees
1 Earthwork Excavation in foundation 75.13 cum 37
2 C.Conc.(gatka) in foundation in1:8:16 11.7 cum 3259
3 C.Conc.(Bajri) in1:2:4 0.000 cum 4802
4 Sq rubble masonry in 1:5 in foundation 75.3 cum 5318
5 Sq rubble masonry in 1:5 above foundation 60.67 cum 5780
6 12.5 mm thick cement sand plaster in 1:4 77.5 sqm 202.7
7 Waving of net including binding the sides make crate of 15 cm x 15 cm 38 sqm 187
8 Spreding of wire net over pitching 38 sqm 70
9 inclding stone intothe crest hand pitching 9 cum 1384
GST diffrence of 12 to 18 Percent @ 5.35%
Total Abstract cost of Labour charges
Sanctioned Amount 2034800
For Construction: Stone Masonary Water Recharging Cum Silt Collection Structure and Crate Wire Structure Project Village:-Gharbhagga Tehsil:-Shri Anandpur Sahib, Block:- Nurpur Bedi, District:- Roopnagar (PMKSY)
Estimate San.No. 8600 Dated 09-06-2026 for Rs. 1652600.00/-
STONE WIRE CRATES works Village:-KHATANA ,Tehsil Shri Anandpur Sahib, Block:-Nurpur Bedi, District:-Roopnagar (N0.of Structure :-5) PMKSY
Estimate San.No. 1039 Dated 04-06-2026 for Rs. 702000/
Stone Masonary Run Off Control Structure works Village:-KHATANA ,Tehsil Shri Anandpur Sahib, Block:-Nurpur Bedi, District:-Roopnagar (N0.of Structure :-2) PMKSY
Stone Masonary Run Off Control Structure & Crate Wire Structure works Village:-Jhandiana ,Tehsil Shri Anandpur Sahib, Block:-Nurpur Bedi, District:-Roopnagar (N0.of Structure :-6) PMKSY
Estimate San.No.1042 Dated 05-06-2026 for Rs. 655100/
STONE WIRE CRATES works Village:-Dhamana ,Tehsil Shri Anandpur Sahib, Block:-Nurpur Bedi, District:-Roopnagar (N0.of Structure :-3) PMKSY
Estimate San.No. 1000 Dated 03-06-2026 for Rs. 674600/
STONE WIRE CRATES works Village:-Dhamana ,Tehsil Shri Anandpur Sahib, Block:-Nurpur Bedi, District:-Roopnagar (N0.of Structure :-3) PMKSY
Estimate San.No. 1098 Dated 10-06-2026 for Rs. 538500/
STONE WIRE CRATES works Village:-Khad Bathlor ,Tehsil Shri Anandpur Sahib, Block:-Nurpur Bedi, District:-Roopnagar (N0.of Structure :-6) PMKSY
Estimate San.No. Dated:- for Rs. 1373500/
1.0 - Name of Work :- Stone Masonary Water Recharging Structure Project No.5, Village - New Malikpur ,Tehsil and Distt.- Rupnagar ,Punjab
A. Labour Cost of Stone Masonary Water Recharging Structure
For Construction of Stone Masonary Water recharging Structures Project Village Bari,Tehsil & District Rupnagar
Estimate San.No. 8037 Dated 25-05-2026 for Rs. 2523600.00/-
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.55 MB
StandardDNIT.pdf
Tender Documents • 0.53 MB
finbid0004.xls
Additional Documents • 0.08 MB
Download all tender documents and submit your bid