| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹20.5 LAccepted-Finance | ₹20.5 L | L1 | Accepted-Finance L1 |
| 2 | L2₹20.6 LRejected-Finance VILL BENIADANGA PO MALLICKPUR PS BARUIPUR SOUTH 24 PGS KOLKATA 175 | 175 | ₹20.6 L | L2 | Rejected-Finance L2 |
| 3 | L3₹20.6 LRejected-Finance VILL BENIADANGA PO MALLICKPUR PS BARUIPUR SOUTH 24 PGS KOLKATA 175 | 175 | ₹20.6 L | L3 | Rejected-Finance L3 |
| 4 | L4₹20.6 LRejected-Finance 1 250 Y KODIKULAM KODIKULAM POST MADURAI 625 104 | MADURAI | MADURAI | TAMIL NADU | 625104 | ₹20.6 L | L4 | Rejected-Finance L4 |
| 5 | L5₹20.7 LRejected-Finance 250 9 DUM DUM ROAD KOLKATA 700074 | KOLKATA | KOLKATA | WEST BENGAL | 700074 | ₹20.7 L | L5 | Rejected-Finance L5 |
Tender Value
₹20.6 L
EMD Value
₹41,171
Closing Date
5 Feb 2026, 2:00 pmClosed
EE_II_KCHD_PWD
P-16, INDIA EXCHANGE PLACE EXTENSION 1st FLOOR, KIT BUILDING, KOLKATA 700 073
Courtyard development of the Male Ward for free movement of the IPD Patient within the campus of Calcutta Pavlov Hospital, 18, Gobra Road, Kolkata-700046. (Civil Work).
2026_WBPWD_987675_3
WBPWD/EEII/KCHD/NIeT-26/25-26
Open Tender
CIVIL WORKS
30 days
pavlov mental hospital
Please refer Tender documents.
4 documents required · 4 mandatory
₹41,171
Yes
30 Apr 2026
16 Jan 2026
9 Feb 2026
22 Jan 2026
5 Feb 2026
22 Jan 2026
Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m.as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete. a) Depth of excavation not exceeding 1,500 mm.
Single Brick Flat Soling of picked jhama bricks including ramming and dressing bed to proper level and filling joints with local sand.
Ordinary Cement concrete (mix 1:2:4) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement,if any, in ground floor as per relevant IS codes. a) Pakur Variety
Brick work with 1st class bricks in cement mortar (1:6) (a) In foundation and plinth
Filling in foundation or plinth by silver sand in layers not exceeding 150 mm as directed and consolidating the same by thorough saturation with water, ramming complete including the cost of supply of sand.(payment to be made on measurement of finished quantity)
Brick edging 75 mm wide with picked jhama bricks, laid true to line and level including cutting necessary trench in soil or in hard metalled surface, laying the bricks and repacking the trench (on both side of the edging) with spoils and ramming the same thoroughly complete as per direction (b) Brick-on-end edging (250 mm) depth.
Ordinary Cement concrete (mix 1:1.5:3) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement if any, in ground floor as per relevant IS codes i) Pakur Variety
Hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns,lintels curved or straight including fitting, fixing and striking out after completion of works (upto roof of ground floor) (a) 25 mm to 30 mm thick wooden shuttering as per decision & direction of Engineer-In-Charge.
Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, binders etc initial straightening and removal of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 gauge black annealed wire at every intersection, complete as per drawing and direction. (a) For works in foundation and upto roof of ground floor/upto 4 m (i) Tor steel/Mild Steel
Supplying, fitting & fixing best quality digital printed Ceramic tiles in coloured decorative on walls and floors to match with the existing work & 4 nos. key stones (10mm) fixed with adhesive 4.5 mm thick at the back of each tile & finishing the joints with white cement mixed with colouring oxide if required to match the colour of tiles including roughening of concrete surface, if necessary or by synthetic adhesive & grout materials etc. With polymerised adhesive and epoxy grout pointing including spacer - 2mm (When tiles are laid over existing hard ready surface) all complete as per direction of Engineer-in-charge
Supplying,fitting & fixing granite slab 15mm to 18mm thick in floor, lobby, stair, landing and treads etc. over 20mm (avg)thick base of cement morter (1:2) laid with white cement slurry @ 4.40Kg per Square meter before placing of granite and jointed with white cement slurry @ 2.0 Kg per square meter with necessary pigments and complete as per direction of Engineer-in-charge including cost of all materials, labours, curing and roughening of concrete surface complete. In ground floor (c) Area of each Granite slab above 1.00 Square meter.
(a) M.S.or W.I. Ornamental grill of approved design joints continuously welded with M.S, W.I. Flats and bars of windows, railing etc. fitted and fixed with necessary screws and lugs in ground floor (ii) Grill weighing above 16 Kg./sq.mtr and above
M.S. structural works with hollow sections (square or rectangular shape) conforming to IS: 806-1968 & IS:1161-1998) connected to one another with bracket, gusset, cleat as per design, drawing & direction of Engineer-in-Charge complete including cutting to requisite shape & size, fabrication including metal arc welding conforming to IS: 816-1969 & IS: 9595 using electrodes of approved make and brand conforming to IS:814- 2004, haulage, hoisting and erection all complete. The rate includes the cost of all M.S. Hollow section, all consumables such as electrodes, gas and hire charges of all tools and plants and labour reqired for execution and all incidental chages (such as electricity, labour insurance) etc. complete. i) For roof truss works a) Span up to 12 Mtr
Supplying & laying as per IRC-SP:063-2004 paver unit of any shade of approved quality as per relevant IS code, laid in pattern as directed in pavement, footpath, driveway (paver block only), etc including necessary underlay complete in all respect with all labour and material. a) 25 mm thick Tiles as per IS: 1237-2012 for footpath,ramp,staircase of public building(over 25 mm thick (Avg) Cement mortar (1:3) & Cement Slurry @ 4.4 kg/Sq.m at back side of Block. Cement for Mortar & Slurry to be supplied by Department). (ii) Coloured Decorative.
Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary (Ground floor). [Excluding cost of chipping over concrete surface (i) With 1:6 cement mortar (b) 20 mm thick plaster
Earth work in filling in foundation trenches or plinth with good earth, in layers not exceeding 150 mm. including watering and ramming etc. layer by layer complete. (Payment to be made on the basis of measurement of finished quantity of work) (iv) With carried earth arranged by the contractor within a radius exceeding 5 km. but not exceeding 10 km. including cost of carried earth.
Supplying and stacking of good earth (adequate for horticulture work) at site including royalty (earth measured in stack will be reduced by 20% for payment)
Supplying and stacking sludge (adequate for Horticulture work) at site in dry cake form from approved disposal work site including royalty, all lead and lift etc. (Sludge measured in stack will be reduced by 8%).
Spreading of sludge, dump manure,/farm yard manure/animel dung manure and good earth in required thickness. This includes supply of labour, tools & plants excluding materials
Preparation of beds for hedging and shrubbery by excavating 60cm deep and trenching the excavated base to a further depth of 30cm, refilling the excavated earth after breaking clods and mixing with sludge or manure in the ratio of 8:1 ( 8 parts of stacked volume of earth after reduction by 20%, one part of stacked volume of sludge or manure after reduction by 8%), flooding with water, filling with earth if necessary watering and finally fine dressing, levelling etc.including stacking and disposal of materials declared unserviceable and surplus earth by spreading and levelling as directed, within a lead of 50m lift upto 1.5m complete. This includes supply of labour, tools & plants including materials
Maintenance of hedge for one year including application of necessary pesticide, farm yard manure, replacement of damaged hedge plant by new one complete in all respect as per instruction of Engineer-in-charge. This includes supply of labour, tools & plants including materials.
Supplying and Planting of different plant / trees ( Supplying well grown plants bushy and healthy, minimum height as specified i.e. exposed height including all leads & lift, carriage, handling, manuring, applying presticide and fertilizer etc. v) Duranta goldianna of size not less than 20cm
ix) Ficus bengalensis (variegated) of height 60-75cm in earthen pots size 30cm
xxi) Croton different varieties of height 30 cm to 90 cm in earthen pots of size 25cm.
i) Furcaria veriegated 10-12 leaves in height 20-30cm in earthen pots of size 25cm.
viii) China palm of leaves 4-5 in earthen pots size 25cm
Please Enable Macros to View BoQ information
stage.html
html • 0.09 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.18 MB
2911.pdf
Tender Documents • 1.37 MB
BOQ_2419095.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid