Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹15.8 LAccepted-AOC 10 4 D 104 ADDAGUTTA EAST MARREDPALLI SECUNDERABAD HYDERABAD TELANGANA 500026 | HYDERABAD | TELANGANA | 500026 | L1 | Accepted-AOC L1 | |
| 2 | L2₹16.0 L+₹1.1 L (7.41%)Rejected-AOC 72 133 THOTTILPATTY SALEM CAMP METTUR DAM 636456 | METTUR DAM | SALEM | TAMIL NADU | 636456 | L2 | Rejected-AOC L2 |
Tender Value
Refer Docs
EMD Value
₹12,900
Closing Date
1 Jul 2024, 2:00 pmClosed
CE MTPS II
O/o CE MTPS II
Removing of old refractory inspection of buck stay Strengthening of buck stay by welding renewal reconditioning of cotter pin Renewal of damaged buck stay leveler beam with new leveler beam applying new refractory in required buck stay and HRA Front
2024_EB_454829_1
OT 47
Open Tender
Maintenance Works
Works
25 days
SE MI MTPS II
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹12,900
Yes
19 Aug 2024
15 Jun 2024
2 Jul 2024
15 Jun 2024
1 Jul 2024
15 Jun 2024
Amount
Transporting the refractory from MTPS-II central store to boiler "0" mtr, leading and lifting to the required elevation of boiler by providing chain block, pulley and rope.
Removing of old refractory and bringing to ‘0’m, including cost of all consumables, tools and plants etc.,
Cutting and welding of clamp and arresting the buck stay plate, renewal/ reconditioning of cotter pin in the buck stay connecting corner plate including consumables and hire charges for T&Ps
Providing shuttering for refractory and applying new refractory in the required area of buck stay location including consumables and hire charges for T&Ps.
Providing shuttering for refractory and applying new refractory in the HRA Front wall area & 2nd pass rear side in LTRH, Economizer Lower & upper bank above the porous plate including consumables and hire charges for T&Ps.
Removing the damaged leveller beam and providing new one at required elevation after removing the arresting clamps, positioning the beam, cutting and welding of leveller beam stiffener plates and its allied works, restoration of the clamps after renewal work and preparing scaffolding arrangements. Devolution the scrap to store if required.
Transporting of new Leveller Beam from '0'mtr to various required elevation and bringing the damaged one to '0'mtr.
Lifting the buck stay connecting corner plate and hanger pin wherever it is needed in the boiler with providing proper chain block supports for re-fixing the cotter pin including the charges like consumables, T&P’s and etc.,
Removal of G.I sheet and insulation three layer (60mm x 3 = 180mm thick) from front, rear, left and right side water wall panels outside buck stay from 43 mtr to 51 mtr elevation, whichever required area in Boiler 1st pass and refixing after completion of rectification works
Cost for Required I-Beam (Size 250 X125 6.9mm)
KSS Engineering Contractor (BID ID -1072636)
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .