Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹45.5 LAccepted-AOC | L1 | Accepted-AOC Work order issued |
Tender Value
Refer Docs
EMD Value
₹78,000
Closing Date
29 Jul 2026, 5:00 pmClosed
EE
Nagar Nigam Gorakhpur
Ward number 62 Maya bajar mein Ghosh company se Kotwali Thane Tak RCC nali ka Nirman karya
2026_DOLBU_1134914_4
Jal Nikasi Sr 63 Ward 62
Open Tender
Civil Works
Percentage
Gorakhpur
Please refer Tender documents.
2 documents required · 2 mandatory
₹4,130
Nagar Nigam Gorakhpur
₹78,000
9 Oct 2026
20 Jul 2026
30 Jul 2026
20 Jul 2026
29 Jul 2026
20 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1A | |||||
| 1.01 | Dismantling brick work or stone work in lime or cement
mortar and including stacking of materials as directed be the Engineer-in-charge within a distance of 60 meter (200
feet).SI No.692 | - | Cum | 400 | - |
| 1.02 | Excavation in foundation in ordinary soil (Loam, clay or sand) including lift upto 1.50 M. and lead upto 30 M. and including filling watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the Engineer-in charge upto a distance of 30 M. from the foundation trenches.Sl No.251a | - | Cum | 120 | - |
| 1.03 | Concrete with 4 cm. gauge brick ballast, Fine sand of 1.25 F.M. and cement, in proportion of 12:6:1 in foundations and under floors, including supply of all materials, labour, Tools & plants etc. required for proper completion of the work.(S.I No- 273) | 1 | Cum | 4,007 | ₹4,002.99 |
| 1.04 | R.C.C. Work with cement, approved coarse sand & 2 cm gauge approved stone grit in proportions of 1:1.5:3 in supply of all materials, labour, Tools & plants etc. required for proper completion of the work. (S.I No-289) | 1 | Cum | 9,082 | ₹9,072.92 |
| 1.05 | M.S. (Tor steel or plain) in plain work such as R.C.C or R.B work including bending for proper shape as necessary including bending for proper completion of the work and including supply of all steel & wastage, bend, hooks, and authorised overlapping shall be measured. (S.I-504) | 0.6 | Qtl | 7,690 | ₹4,606.31 |
| 1.06 | wall waterproof cement paint. | - | Sqm | 92 | - |
| 1.07 | Diversion by diesel pump incl all comp work. | - | Hr | 105 | - |
| 1.08 | Disposal of Surplus earth soil with all complete etc. | - | Cum | 117.5 | - |
| 1.09 | P/fixing of road barricating i/c.all complete of work. | - | Rmt | 118 | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.01 MB
BOQ_2197791.xls
BOQ • 0.32 MB
f.pdf
Tender Documents • 2.20 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .