| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹12.8 LAdmitted-Finance | -14.65% | ₹12.8 L | L1 | Admitted-Finance |
| 2 | L2₹13.5 L+₹73,821.05 (5.79%)Admitted-Finance | -9.71% | ₹13.5 L+₹73,821.05 (5.79%) | L2 | Admitted-Finance |
| 3 | L3₹13.6 L+₹84,430.96 (6.62%)Admitted-Finance | -9.00% | ₹13.6 L+₹84,430.96 (6.62%) | L3 | Admitted-Finance |
Tender Value
₹14.9 L
EMD Value
₹29,880
Closing Date
18 May 2026, 6:00 pmClosed
EE, Ada, Ajmer
Ada, Ajmer
Construction work of classrooms at Government Girls Senior Secondary School, Pahadganj, Ajmer.
2026_ADA_556451_1
03/2026-27 (11)
Open Tender
Civil Works - Buildings
Percentage
180 days
Ada
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
Yes
Ada, Ajmer
₹29,880
Yes
26 May 2026
6 May 2026
19 May 2026
6 May 2026
18 May 2026
6 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Part A : Civil | - | - | - | - |
| 2 | Earth work in excavation by mechanical means (Hydraulic Excavator )/ manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including taking out the excavated soil and depositing and refilling of jhiri with watering & ramming and disposal of surplus excavated soil as directed with in a lead of 50 meter. All kinds of soils Room footing RR Wall, L/W | 119 | Cum | 178 | ₹21,182 |
| 3 | Random rubble dry stone Kharanja under floor. | 13 | Cum | 932 | ₹12,116 |
| 4 | Providing and laying in position cement concrete including curing, compaction etc. complete in specified grade excluding the cost of centering and shuttering - All work up to plinth level. M10 grade Nominal Mix
1: 3: 6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20mm nominal size). Column footing RR Wall, L/W S/W Room Floor Plinth Protection Wall | 13.95 | Cum | 3,847 | ₹53,665.65 |
| 5 | Random Rubble stone masonry for with hard stone in foundation and plinth in Cement Sand mortar above 30 CM thick wall in:Cement Mortar 1:6 ( 1-Cement : 6-Sand). | 107.51 | cum | 2,838 | ₹3,05,113.38 |
| 6 | Centering and Shuttering with plywood or steel plate including strutting, propping bracing both ways and removal of formwork for foundation , footings, strap beam, raft , bases of columns etc. Column first footing , 4x9 Pedestal, 4x9 Plinth Beam | 84 | sqm | 157 | ₹13,188 |
| 7 | Providing and laying in position specified grade of cement concrete for all RCC structural elements upto plinth level including curing, compaction, finishing with rendering in cement sand mortar 1:3 (1 cement: 3 coarse sand) and making good the joints and cost of plastizers (if required) excluding the cost of centering, shuttering and reinforcement. : M20 grade Nominal Mix Column first footing , 9 Column Second footing , 9 Plinth Beam | 17.74 | Cum | 4,934 | ₹87,529.16 |
| 8 | Centering and Shuttering with plywood or steel plate including strutting, propping bracing both ways and removal of formwork for foundation , footings, strap beam, raft , bases of columns etc. Columns, pillars, posts and struts etc. Column, 2x9 | 56 | Sqm | 375 | ₹21,000 |
| 9 | Providing and laying in position specified grade of cement concrete for RCC structural elements upto floor Three level including curing, compaction, finishing with rendering in cement sand mortar 1:3 (1 cement: 3 coarse sand) and making good the joints and cost of plastizers (if required ) excluding the cost of centering, shuttering and reinforcement for Walls (any thickness) including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc.M20 grade Nominal Mix | 4 | Cum | 5,609 | ₹22,436 |
| 10 | Centering and Shuttering with plywood or steel plate including strutting, propping bracing both ways and removal of formwork for foundation , footings, strap beam, raft , bases of columns etc. Suspended floors, roofs, landings, staircases, balconies, girders, cantilevers, bands, coping bed plates, anchor blocks, sills, chhajjas, lintel, beam, plinth beam etc. Lintel L/W, 2x6 S/W, 2x3 Roof Beam | 115 | sqm | 340 | ₹39,100 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.45 MB
bid11.pdf
Tender Documents • 12.53 MB
BOQ_990779.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .