Tender Value
₹2.1 L
EMD Value
₹2,700
Closing Date
4 Mar 2024, 6:00 pmClosed
Area Engineer(EnM)
Sodepur Area Office
Repairing of 500-kVA, 11kV/550V Hindustan make Power Transformer and 250-kVA, 3.3kV/550V old type Power Transformer of Parbelia Colliery under Sodepur Area.
2024_ECL_302367_1
ECL/SDPA/EnM/24/Tender/555 Date.22.02.2024
Open Tender
Electrical and Maintenance Works
Item Rate
10 days
Sodepur Area
Please refer Tender documents.
4 documents required · 4 mandatory
₹2,700
29 Sept 2024
22 Feb 2024
5 Mar 2024
22 Feb 2024
4 Mar 2024
22 Feb 2024
22 Feb 2024 - 25 Feb 2024
Amount
Items Description
Repairing of 500-kVA, 11kV/550V Hindustan make Power Transformer .
Dismantling of inspection cover, conservator tank, flanges and cable connections.
Drain out of old transformer oil and keep it safe place & filling of transformer oil.
Providing of rubber oil seal bush insulator
Providing Neoprene gasket, cork sheet, tapes etc.
Providing incoming & outgoing bush insulator with terminals
Cleaning and decarbonises the transformer core tank inside & outside and all flanges.
Repairing and breezing of 1 Limb coil with silphos rod.
Selves & insulation of repaired coil,Providing clean selves ,insulation & tape etc.
Labour charges for fitting at site.
250-kVA, 3.3kV/550V old type Power Transformer
Removing of Top cover, inspection cover, conservator, top cores and dismantling burnt winding coils and carbonised core.
Dismantling of core structure, cleaning and de-carbonising of core structure dry out and re-assembling of core.
Cost of new Copper conductor against burst & brittle of Primary side2Limb
Cost of Insulating materials for TPC for Primary coil
Decarbonising & Cleaning of old balanced existing copper conductor for secondary side 2 Limb
Wooden forma for making Primary & Secondary coils.
Insulating materials (Presphun board, leather paper, tapes and varnish etc.)
Pressure lock chip for coil locking
Reformation of Primary & Secondary coil as per sample
De-carbonising, cleaning of top core, channel, tank cooling tubes etc.
Re-assembling of both reformed Primary and Secondary coils, top core setting, channel fixing, oil duct, making connections etc.
Cost of brazing rod EUTEC 1405 for Primary and Secondary coils.
Cost of neoprene synthetic gasket for top cover, inspection cover & insulators.
Painting of transformer
Filtration of Transformer oil
Labour Cost / Heating, baking of Transformer at Heat chamber then box-up and internal Primary & Secondary connections.
Less: Scrap Value
Transporting cost up & down.
Overhead cost & Others
Add: CMPF @ 12%
Add: Bonus @ 8.33%
Add: Pension @ 7%
Total impact of GST for the purpose of CTC
SINGH ELECTRICALS
ELECTRO POWER INDUSTRIES
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .