Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹16.9 LAccepted-AOC | ₹16.9 L Quoted ₹22.1 L | L1 | Accepted-AOC L1 |
| 2 | L2₹22.9 LRejected-AOC NO 10 72 10TH STREET JOTHI NAGAR MANALI EXPRESS ROAD THIRUVOTTIYUR CHENNAI 600 019 | CHENNAI | TAMIL NADU | 600019 | ₹22.9 L | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | SPK ENTERPRISES L1 | KUMARAN ENGINEERING WORKS L2 |
|---|---|---|---|---|---|
| 1.00 | Overhauling of flue gas, secondary air and primary air gates and its chains, sprockets, end bushes and internals of actuator's gear box mechanism. Checking the operation of gates manually by open and close etc. including consumables, T&P's. | 28 | Nos | 35,000 ₹9.8 L | 36,000 ₹10.1 L |
| 2.00 | Overhauling of flue gas, secondary air and primary air dampers and its actuator's gear box including oil seals set, shaft pins, crank assembly, turn buckle, link assembly, internals of actuator's gear box mechanism. Checking the operation of dampers manually by open and close etc. including consumables, T&P's. | 20 | Nos | 32,000 ₹6.4 L | 34,000 ₹6.8 L |
| 3.00 | Charges for leading, lifting and transportation of iron and steel materials from store to site.(Elevation-> 0 to 9 Mtr) | 1.5 | Ton | 3,810 ₹5,715 | 4,000 ₹6,000 |
| 4.00 | Charges for fabrication and erection of MS structurals and patch up work (Elevation -> 0-9 Mtr) | 1.5 | Ton | 57,000 ₹85,500 | 58,100 ₹87,150 |
| 5.00 | Charges for leading, lifting and transportation of iron and steel materials from store to site.(Elevation->20 to 50Mtr) | 1.5 | Ton | 8,600 ₹12,900 | 9,000 ₹13,500 |
| 6.00 | Charges for fabrication and erection of MS structurals and patch up work (Elevation -> 20 to 50 Mtr) | 1.5 | Ton | 80,600 ₹1.2 L | 81,000 ₹1.2 L |
| 7.00 | Charges for fixing and removing the scaffolding arrangements around the Boiler area / Duct. Size 3 mtr x 3 mtr. Charges including for scaffolding material, leading, lifting, T&P's and consumables | 30 | opn | 4,800 ₹1.4 L | 5,000 ₹1.5 L |
| 8.00 | Supply of MS I Beam 200 mmMaterial : IS 2062Charges including loading, transporting & unloading to stores | 3 | Ton | 72,500 ₹2.2 L | 75,000 ₹2.3 L |
Tender Value
Refer Docs
EMD Value
₹20,400
Closing Date
23 Jun 2025, 2:00 pmClosed
CE NCTPS II
Office of Chief Engineer NCTPS II CHENNAI 120
NCTPS II MI Circle Boiler Maintenance Division Unit II Boiler Annual overhaul of Gates
2025_EB_569489_1
CE NCTPS II SE M I O M 46 2025 26
Open Tender
Miscellaneous Works
40 days
SE MI NCTPS II
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹20,400
Yes
12 Jan 2026
16 Jun 2025
24 Jun 2025
16 Jun 2025
23 Jun 2025
16 Jun 2025
Amount
Overhauling of flue gas, secondary air and primary air gates and its chains, sprockets, end bushes and internals of actuator's gear box mechanism. Checking the operation of gates manually by open and close etc. including consumables, T&P's.
Overhauling of flue gas, secondary air and primary air dampers and its actuator's gear box including oil seals set, shaft pins, crank assembly, turn buckle, link assembly, internals of actuator's gear box mechanism. Checking the operation of dampers manually by open and close etc. including consumables, T&P's.
Charges for leading, lifting and transportation of iron and steel materials from store to site.(Elevation-> 0 to 9 Mtr)
Charges for fabrication and erection of MS structurals and patch up work (Elevation -> 0-9 Mtr)
Charges for leading, lifting and transportation of iron and steel materials from store to site.(Elevation->20 to 50Mtr)
Charges for fabrication and erection of MS structurals and patch up work (Elevation -> 20 to 50 Mtr)
Charges for fixing and removing the scaffolding arrangements around the Boiler area / Duct. Size 3 mtr x 3 mtr. Charges including for scaffolding material, leading, lifting, T&P's and consumables
Supply of MS I Beam 200 mmMaterial : IS 2062Charges including loading, transporting & unloading to stores
KUMARAN ENGINEERING WORKS (BID ID -1375204)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid