Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹19.9 LAccepted-AOC | ₹19.9 L | L1 | Accepted-AOC L1 |
| 2 | L2₹20.4 L+₹47,450.30 (2.38%)Rejected-AOC | ₹20.4 L+₹47,450.30 (2.38%) | L2 | Rejected-AOC L2 |
| 3 | L3₹21.2 L+₹1.3 L (6.73%)Rejected-AOC | ₹21.2 L+₹1.3 L (6.73%) | L3 | Rejected-AOC L3 |
Tender Value
₹22.4 L
EMD Value
₹2.2 L
Closing Date
8 Jun 2026, 3:00 pmClosed
chief Engineer nagar nigam saharanpur
chief Engineer nagar nigam saharanpur
Construction of first floor from kanha upwan gaushala
2026_NNSAH_1151543_1
2375 G
Open Tender
Civil Works
Percentage
30 days
saharanpur
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,298
₹2.2 L
5 Sept 2026
23 May 2026
9 Jun 2026
23 May 2026
8 Jun 2026
23 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | R.C.C. Work with cement, approved coarse sand & 2 cm gauge approved stone grit in proportions of 1:1.5:3 in slab/ nall with all comp of work | 15.54 | m3 | 7,400 | ₹1,14,996 |
| 2 | M.S. (tor steel or plain) in Plain work such as R.C.C. or R.B. work including bending for proper shape and including supply of steel & its wastage, bend, hooks, and authorised overlapping shall be measured and including cost of binding wire. | 18.3 | qtl | 8,529 | ₹1,56,080.7 |
| 3 | M-150 Brick work in 1:4 one cement and four course sand, mortar in foundation in plinth including supply of all material labour, T &P etc. required for proper completion of the work. | 49.4 | cum | 4,690 | ₹2,31,686 |
| 4 | R.C.C. Work with cement, approved coarse sand & 2 cm gauge approved stone grit in proportions of 1:1.5:3 in slab/ nall with all comp of work | 32.69 | m3 | 7,400 | ₹2,41,906 |
| 5 | M.S. (tor steel or plain) in Plain work such as R.C.C. or R.B. work including bending for proper shape and including supply of steel & its wastage, bend, hooks, and authorised overlapping shall be measured and including cost of binding wire. | 38.48 | qtl | 8,529 | ₹3,28,195.92 |
| 6 | 12 mm thick plaster with cement and approved c sand mortar in 1:4 over brick work minium thickness not to be less than 1 Cm including supply of all material labour Tool & Plants etc. required for proper completion of the work. | 332.37 | sqm | 160 | ₹53,179.2 |
| 7 | Supply and fixing of 6 mm thick china white glazed tiles including or in skirting or dado laid with 1:3 cement and c,Sand mortar finished with white cement slurry jointing and polishing complete including supply of all material complete of the work.( Size of tiles up to 200x300mm) | 134 | sqm | 1,400 | ₹1,87,600 |
| 8 | P/L 6 mm Vittrified (white /colour ) Kajariya tiles ,Ramano tiles flooring over 20 mm (av) thick base of cement mortar 1:4 (1cement and 4 CSand )laid and jointed with white cement with pigment slurry including Rubbing polishing comp. | 168.48 | sqm | 900 | ₹1,51,632 |
| 9 | M.S. or or iron work or small sizes and section such as holding down bolts, hold fast, tie rods in all complete work | 51.07 | qtl | 6,150 | ₹3,14,062.05 |
| 10 | Painting or varnishing work in small area or new with Two coat of approved suprior quality | 70.74 | cum | 89 | ₹6,295.86 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.40 MB
BOQ_2156928.xls
BOQ • 0.24 MB
corregendumnit33.pdf
PDF • 0.52 MB
corrigendum26.pdf
PDF • 0.37 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .