| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.4 LAccepted-AOC NO 1 1 ANNA STREET ETHIRAJ NAGAR WEST MAMBALAM METTUPALAYAM CHENNAI 600 033 | CHENNAI | TAMIL NADU | 600033 | L1 | Accepted-AOC L1 bidder | |
| 2 | L2₹8.0 L+₹66,425 (9.02%)Rejected-AOC | L2 | Rejected-AOC L2 bidder |
| Sl No | Description | Qty | Unit | ULAGANATHAN J L2 | SRK CONSTRUCTIONS L1 |
|---|---|---|---|---|---|
| 1.00 | Earth work excavation for desilting the existing rivers /canals / channels/odai/ nullas / drains/flood bowls/tanks/reservoirs etc., consisting of very loose soil, silt, oily silt,slushy, marshy, loany, organic soil, sea shell and flatmica particles with zero present air void in unhygienic & insanitary conditions in under water and not under water deploying earth moving machinery with suitable floats buoys barge/ hydraulic excavator & other mechanical devices including the cost of hire charges for machinery,with cost of skilled operators with helper & cleaners for the entire operations to reach the banks in which the removed silt & sludge has to be dumped over either one of the rivers / canals / channels/odai/ nullas / drains/floods bowls / tanks / reservoirs etc, bank whichever is convenient as per the prevailing site conditions for easy conveyance and including jungle clearance etc.. complete (Rate excluding conveyance to dumping yard or low lying area) | 630 | Cum | 75,600 ₹89,208 | 73,080 ₹86,234.4 Lowest |
| 2.00 | Engaging for Excavation cum Loder (JCB ) for Hire basis including live charges fuel and transportation all labour charges etc., | 200 | Hours | 2,00,000 ₹2,36,000 | 1,81,800 ₹2,14,524 Lowest |
| 3.00 | Engaging Labour for Desilting the Open small Channel including pick axes , gumboot , Hand Gloves all charges etc complete | 400 | Nos | 3,00,000 ₹3,54,000 | 2,76,000 ₹3,25,680 Lowest |
| 4.00 | Engagging of Lorry with Trailer on hire basis for flood relief works for conveying the desilted earth debris including cost of hire charges , fuel charges and operator charges etc complete as per specification. | 25 | Days | 1,62,500 ₹1,91,750 | 1,49,975 ₹1,76,970.5 Lowest |
| 5.00 | Removal of Excavated Excess Earth Away from the site to 5 k,m including loading and transportation charges etc., complete as per standard Specification. | 540 | Cum | 64,800 ₹76,464 | 55,620 ₹65,631.6 Lowest |
Tender Value
₹9.2 L
EMD Value
₹9,200
Closing Date
7 Aug 2026, 3:00 pmClosed
The Commissioner , Tambaram Corporation
No.01, Kalaivani Street, Rajakilpakkam , Chennai-600073
Desilting of Open Channel and Disposal drains in Haridasspuram Main road and Link Roads to Thiruvika nagar at ward no 37 and 38 in Zone - 3
2026_DMA_687858_7
168/2026/E1
Open Tender
Maintenance Works
Works
45 days
Tambaram City Municipal Corporation
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹9,200
10 Oct 2026
23 Jul 2026
7 Aug 2026
23 Jul 2026
7 Aug 2026
23 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | GST % |
|---|---|---|---|---|---|---|
| 1 | Earth work excavation for desilting the existing rivers /canals / channels/odai/ nullas / drains/flood bowls/tanks/reservoirs etc., consisting of very loose soil, silt, oily silt,slushy, marshy, loany, organic soil, sea shell and flatmica particles with zero present air void in unhygienic & insanitary conditions in under water and not under water deploying earth moving machinery with suitable floats buoys barge/ hydraulic excavator & other mechanical devices including the cost of hire charges for machinery,with cost of skilled operators with helper & cleaners for the entire operations to reach the banks in which the removed silt & sludge has to be dumped over either one of the rivers / canals / channels/odai/ nullas / drains/floods bowls / tanks / reservoirs etc, bank whichever is convenient as per the prevailing site conditions for easy conveyance and including jungle clearance etc.. complete (Rate excluding conveyance to dumping yard or low lying area) | 630 | Cum | - | - | 18% |
| 2 | Engaging for Excavation cum Loder (JCB ) for Hire basis including live charges fuel and transportation all labour charges etc., | 200 | Hours | - | - | 18% |
| 3 | Engaging Labour for Desilting the Open small Channel including pick axes , gumboot , Hand Gloves all charges etc complete | 400 | Nos | - | - | 18% |
| 4 | Engagging of Lorry with Trailer on hire basis for flood relief works for conveying the desilted earth debris including cost of hire charges , fuel charges and operator charges etc complete as per specification. | 25 | Days | - | - | 18% |
| 5 | Removal of Excavated Excess Earth Away from the site to 5 k,m including loading and transportation charges etc., complete as per standard Specification. | 540 | Cum | - | - | 18% |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_826793.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.88 MB
BOQ_826793.xls
BOQ • 0.39 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .