Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹29.9 LAdmitted-Fee/PreQual/Technical/Finance | -35.00% | ₹29.9 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹31.3 L+₹1.4 L (4.63%)Admitted-Fee/PreQual/Technical/Finance | -31.99% | ₹31.3 L+₹1.4 L (4.63%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹31.7 L+₹1.8 L (6.15%)Admitted-Fee/PreQual/Technical/Finance 112 GHULAM MOHI UD DIN GUND GANDERBAL GUND PULWAMA JAMMU KASHMIR 192301 UDYAM JK 06 0003159 | PULWAMA | JAMMU AND KASHMIR | 192301 | -31.00% | ₹31.7 L+₹1.8 L (6.15%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L4₹33.4 L+₹3.5 L (11.7%)Admitted-Fee/PreQual/Technical/Finance | -27.40% | ₹33.4 L+₹3.5 L (11.7%) | L4 | Admitted-Fee/PreQual/Technical/Finance |
| 5 | L5₹33.5 L+₹3.6 L (12.0%)Admitted-Fee/PreQual/Technical/Finance | -27.22% | ₹33.5 L+₹3.6 L (12.0%) | L5 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
Refer Docs
EMD Value
₹1.1 L
Closing Date
22 Aug 2026, 4:00 pmClosed
Er. Mohammad Waseem
Office of the Executive Engineer RnB Ang
Fencing of Patch of land for construction site of Animal House at main Campus , GMC Anantnag
2026_PWDJK_320280_1
NIT 66 of RnB/Ang/2026-27/5532-41 Dt 10/08/26
Open Tender
Civil Works
Percentage
120 days
Anantnag
Please refer Tender documents.
4 documents required · 4 mandatory
₹1,600
Executiver Engineer rnB Division Anantnag
₹1.1 L
31 Aug 2026
10 Aug 2026
24 Aug 2026
10 Aug 2026
22 Aug 2026
10 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means over areas (exceeding 30 cm in depth, 1.5 m in width as
well as 10 m Sq. on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m,
as directed by Engineer-in-Charge. All kinds of soil : Incl Dewatering | 270.56 | Cum | - | - |
| 2 | P/l dry stone soling duly hand packed & consolidated with hand rammers inc. all carriage complete job. | 27 | cum | - | - |
| 3 | Providing and laying in position cement concrete of (1:4:8) ratio excluding the cost of centring, shuttering and carraige of all work in foundation using coarse sand and 40mm nominial size aggregate include carraige of materials complete job. | 22.5 | Cum | - | - |
| 4 | Providing and laying in specified grade reinforced cement concrete of (1:1.5:3) ratio excluding the cost of centring, shuttering and carraige of all work in foundation using coarse sand and 20mm nominial size aggregate include carraige of materials | 22.5 | Cum | - | - |
| 5 | Reinforcement for RCC work incl cutting bending complete job ( TMT BARS FE 500 D OR MORE ) | 1,800 | kg | - | - |
| 6 | Providing and laying in position cement concrete of (1:2:4) ratio excluding the cost of centring, shuttering and carraige of all work in foundation using coarse sand and 20mm nominial size aggregate include carraige of materials complete job. | 130.88 | Cum | - | - |
| 7 | Centering shuttering incl removal of same for foundations and footings and bases of columns | 712.5 | sqM | - | - |
| 8 | Brick masonry with FPS bricks of class designation 75 in super structure upto floor V level in cement mortar 1:6 (1 cement:6cement coarse sand) comp-lete as per the directions of Consultant inculding cost & carriage of all materials involved upto site of work complete.both sides Exposed s | 287.5 | Cum | - | - |
| 9 | Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. | 1,227.15 | kg | - | - |
| 10 | Painting with Enamel paint on Metalsurface ofRequired Shade andcolour | 45 | sqm | - | - |
stage.html
html • 0.03 MB
finance_1064213.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.73 MB
BOQ_1064213.xls
BOQ • 0.27 MB
CORRIGENDUMDATE66Allitems.pdf
PDF • 0.21 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .