| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.7 LAccepted-Finance | ₹8.7 L | L1 | Accepted-Finance L1 |
| 2 | L2₹8.7 LRejected-Finance | ₹8.7 L | L2 | Rejected-Finance L2 |
| 3 | L3₹8.7 LRejected-Finance | ₹8.7 L | L3 | Rejected-Finance L3 |
| Sl No | Description | Qty | Unit | SUBBAIYA L3 | ARAVIND MUGESH L1 | Mariapremkumar L2 |
|---|---|---|---|---|---|---|
| 1.00Construction of New Kitchen Shed at Panchayat Union Primary School in Anaikulam Village and Panchayat in Kadayanallur Panchayat Union | ||||||
| 2.00 | Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B | 34.87 | Cum | 264 ₹9,205.68 | 263 ₹9,170.81 | 263 ₹9,170.81 |
| 3.00 | Collection and supply of Sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard specifications | 10.71 | Cum | 1,942 ₹20,798.82 | 1,941 ₹20,788.11 | 1,941 ₹20,788.11 |
| 4.00 | Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for 10 cum. | 8.08 | Cum | 5,457 ₹44,092.56 | 5,456 ₹44,084.48 | 5,456 ₹44,084.48 |
| 5.00 | Random rubble masonry in cement mortar 1:5 mix with simultaneous pointing including cost and conveyance pf all materials to site and all labour charges etc complete for 10 cum | 28.47 | Cum | 5,811 ₹1.7 L | 5,800 ₹1.7 L | 5,805 ₹1.7 L |
| 6.00 | Brick work in cement mortar 1:5 mix using country bricks 83/4"x4 1/4"x2 3/4" and conveyance of all materials to site and all labour charges etc complete For 100CFT | 21.58 | Cum | 6,131 ₹1.3 L | 6,120 ₹1.3 L | 6,125 ₹1.3 L |
| 7.00 | Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for R C C column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etc using mild steel sheets of size 90 x 60 cm and 10 guage stiffened, welded with mild steel angles of size 25mmx25mmx3mm for boarding laid over silver oak (country wood) scantlings of size 10cm x 6.5cm spaced of about 90cm centre to centre and supported by casurina props of 10cm to 13cm dia spaced at 75cm centre to centre complete complying with standard specifications and as directed by departmental officers including conveyance of all materials to site and proper centering etc complete. | 48.15 | Sqm | 1,096 ₹52,772.40 | 1,094 ₹52,676.10 | 1,095 ₹52,724.25 |
| 8.00 | Supplying and fabrication of steel including cost and conveyance of bending to shape and tying in position and forming grills for all R.C.C works including cost and conveyance of all materials to site | 0.58 | Mt | 91,866 ₹53,282.28 | 91,865 ₹53,281.70 | 91,865 ₹53,281.70 |
| 9.00 | Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete for 10 cum. | 6.43 | Cum | 9,070 ₹58,320.10 | 9,069 ₹58,313.67 | 9,069 ₹58,313.67 |
| 10.00 | Supplying and applying of two coats of putty of 3mm thick over the exposed RCC surface of ceiling including finishing the joints smoothy with grinding machine and the surface shall be thoroughly cleaned out of dust and scrubbing. The Surface shall then be allowed to dry for atleast 48 hours. It shall then be sand papered (waterproof abrasive sheet) to give a smooth and even surface. Any unevenness shall be made good by applying 1st coat of putty mixed with water on the entire surface including filling up the undulations and applying 2nd coat of putty after 6 hours of 1st coat of putty and then sand papering (waterproof abrasive sheet) the same after it is dry and finishing the surface smoothly, etc., complete. | 27.97 | Sqm | 310 ₹8,670.70 | 309 ₹8,642.73 | 309 ₹8,642.73 |
Tender Value
₹9.0 L
EMD Value
₹9,040
Closing Date
24 Oct 2025, 3:00 pmClosed
BDO
BDO,KADAYANALLUR
Construction of New Kitchen Shed at Panchayat Union Primary School in Anaikulam Village and Panchayat in Kadayanallur Panchayat Union, Tenkasi District under PTMGR NMP 2025- 2026 (Est.Amt.9.04L)
2025_RDTN_614726_1
BDOKNR/164/2025-A2
Open Tender
Civil Works - Buildings
180 days
KADAYANALLUR
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹9,040
19 Feb 2026
16 Oct 2025
24 Oct 2025
16 Oct 2025
24 Oct 2025
16 Oct 2025
Amount
Construction of New Kitchen Shed at Panchayat Union Primary School in Anaikulam Village and Panchayat in Kadayanallur Panchayat Union
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B
Collection and supply of Sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard specifications
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for 10 cum.
Random rubble masonry in cement mortar 1:5 mix with simultaneous pointing including cost and conveyance pf all materials to site and all labour charges etc complete for 10 cum
Brick work in cement mortar 1:5 mix using country bricks 83/4"x4 1/4"x2 3/4" and conveyance of all materials to site and all labour charges etc complete For 100CFT
Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for R C C column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etc using mild steel sheets of size 90 x 60 cm and 10 guage stiffened, welded with mild steel angles of size 25mmx25mmx3mm for boarding laid over silver oak (country wood) scantlings of size 10cm x 6.5cm spaced of about 90cm centre to centre and supported by casurina props of 10cm to 13cm dia spaced at 75cm centre to centre complete complying with standard specifications and as directed by departmental officers including conveyance of all materials to site and proper centering etc complete.
Supplying and fabrication of steel including cost and conveyance of bending to shape and tying in position and forming grills for all R.C.C works including cost and conveyance of all materials to site
Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete for 10 cum.
Supplying and applying of two coats of putty of 3mm thick over the exposed RCC surface of ceiling including finishing the joints smoothy with grinding machine and the surface shall be thoroughly cleaned out of dust and scrubbing. The Surface shall then be allowed to dry for atleast 48 hours. It shall then be sand papered (waterproof abrasive sheet) to give a smooth and even surface. Any unevenness shall be made good by applying 1st coat of putty mixed with water on the entire surface including filling up the undulations and applying 2nd coat of putty after 6 hours of 1st coat of putty and then sand papering (waterproof abrasive sheet) the same after it is dry and finishing the surface smoothly, etc., complete.
Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc complete for 10 Sqm.
Weathering course with brick jelly lime concrete using 20mm brick jelly with pure slacked lime over R.C.C. roof slab in the proportion of 32:12.5 and finshed with Cement mortor 1:4 -20mm thick plastering including cost and conveyance of all materials to site and all labour charges etc complete for 10 Sqm.
Finishing the top of roof with one course of PRESSED TILES of size 23 cm X 23 cm X 2 cm laid in cement mortar 1:3 (One cement and three Sand) 12mm thick mixed with water proofing compound conforming to I.S. at 2% by weight.
Providing granolethic floor finish in cement concrete 1:2:4 mix using 10-12mm ISS metal to 25mm thick including cost and conveyance of all materials to site and all labour charges for mixing, laying, curing etc complete for 10 cum.
Fabrication and supply of Mild Steel Door of any size 0.90 x 2.10 mwith single leaf outer frame made of 35x35x5 mm equal M.S angle and shutter frame made of 25x25x5 mm M.S angle for horizontal and vertical member with stiffener and fully covered with 18 G plate etc complete.
Fabrication and supply of Mild Steel Window of 0.90 m x 1.30 m size with single leaf outer frame,mullion section made of 35x35x5 mm equal M.S angle and shutter frame made of 25x25x5 mm M.S angle for horizontal and vertical member with stiffener and fully covered with 18 G plate etc complete.
Distembering two coats with best approved distember including cost and conveyance of all materials to site and all labour charges etc complete
Exterior Emulsion painting two coats with best approved quality and colour paint over one coat of Base coat including cost and convyance of all materials to work site and labour charges etc., complete.
Painting two coats over New iron works using ready mixed enamel paint including cost and conveyance of paint and all labour charges etc complete
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Mariapremkumar (BID ID -1494817)
SUBBAIYA (BID ID -1494824)
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
finance_734474.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.06 MB
BOQ_734474.xls
BOQ • 0.44 MB
Download all tender documents and submit your bid