Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹4.0 LAdmitted-Fee/PreQual/Technical/Finance | -31.50% | ₹4.0 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹4.1 L+₹9,915.66 (2.48%)Admitted-Fee/PreQual/Technical/Finance | -29.80% | ₹4.1 L+₹9,915.66 (2.48%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹4.4 L+₹37,854.51 (9.47%)Admitted-Fee/PreQual/Technical/Finance TAMIL NADU TAMIL NADU TAMIL NADU | COIMBATORE | TAMIL NADU | 638459 | -25.01% | ₹4.4 L+₹37,854.51 (9.47%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L4₹4.5 L+₹49,578.33 (12.4%)Admitted-Fee/PreQual/Technical/Finance | -23.00% | ₹4.5 L+₹49,578.33 (12.4%) | L4 | Admitted-Fee/PreQual/Technical/Finance |
| 5 | L5₹4.7 L+₹67,076.56 (16.8%)Admitted-Fee/PreQual/Technical/Finance | -20.00% | ₹4.7 L+₹67,076.56 (16.8%) | L5 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹5.8 L
EMD Value
₹5,900
Closing Date
17 Jul 2026, 3:00 pmClosed
ZONAL OFFICER VIII
NO-36 B,PULLA AVENUE ,SHENOY NAGAR ,CHENNAI-600030
IMPROVEMENTS TO THE MEHTHA NAGAR PLAYGROUND IN DIVISION-107, UNIT-22, ZONE-VIII
2026_CoC_684193_1
Z.O.VIII.C.NO.E1/4956/2026
Open Tender
Civil Works
Works
90 days
GREATER CHENNAI COPORATION ZONE-VIII
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹5,900
17 Jul 2026
6 Jul 2026
17 Jul 2026
6 Jul 2026
17 Jul 2026
6 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Brick work in following Cement Mortar using best q...Executive Engineer in charge. In Cement Morter 1:3 | 3 | CUM | 8,192.9 | ₹24,578.7 |
| 2 | Plastering the surface of walls with Cement Mortar...d as directed by the departmental officers. (Wall) | 15 | SQM | 317.59 | ₹4,763.85 |
| 3 | Painting Old Plastered Wall Surface with Two finis...ed by the Executive Engineer before use on works.) | 27 | SQM | 191.2 | ₹5,162.4 |
| 4 | Cement Concrete 1:3:6 (One Cement, Three crushed s...artmental officers. - Mixing by mechanical means | 3 | CUM | 6,709.81 | ₹20,129.43 |
| 5 | Paving the floor with pre-polished concrete anti-...pproved by Executive Engineer before use on works) | 28 | SQM | 1,578.33 | ₹44,193.24 |
| 6 | Painting Old iron works such as steel doors...ed by the Executive Engineer before use on works.) | 22 | SQM | 157.96 | ₹3,475.12 |
| 7 | Supplying and fixing in position 15mm dia b...Executive Engineer before use on the works) SD Tap | 2 | NOS | 273.37 | ₹546.74 |
| 8 | Supplying and fixing of 1.5 HP Jet Pump Set inclu...ries. ( Kiloskar, Texmo, CRI or equivalent Brand) | 1 | EACH | 15,150 | ₹15,150 |
| 9 | Supply and fixing of Spiral Slide Senior Made of f... all Stainless Steel pipes etc., complete | 1 | EACH | 1,17,300 | ₹1,17,300 |
| 10 | Supply and fixing of See saw 4 seater Fiber rei...eel pipes Seats are fiber reinforced plastic etc. | 1 | EACH | 33,395 | ₹33,395 |
stage.html
html • 0.04 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.89 MB
BOQ_822459.xls
BOQ • 0.29 MB
TENDERDOCUMENT.pdf
Tender Documents • 0.95 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .