Loading…
Loading…
Tender Value
₹5.9 L
EMD Value
₹11,820
Closing Date
5 Oct 2026, 6:00 pm4d left
XEN REW JAMMU
XEN REW JAMMU
P WORK NHO MOHD YUNIS W.NO.05,Panchyat Showa,Block Bhalwal Under UT Capex Head Community development Jammu For FY 2026-27
2026_RDPR_325337_9
602 REWJ of 2026-27 dated 19-09-2026
Open Tender
Civil Works
Percentage
45 days
XEN REW JAMMU
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
MH 0515
₹11,820
21 Sept 2026
21 Sept 2026
6 Oct 2026
21 Sept 2026
5 Oct 2026
21 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres: All kinds of soil : | 51.03 | cum | 256.85 | ₹13,107.06 |
| 2 | Providing and laying in position Cement Concrete of specified grade excluding the cost of centring and shuttering, all work Upto plinth level (1:5:10) 1 cement:5 coarse sand:10 graded stone aggreagate 40mm nominal size (crusher) | 2.38 | cum | 4,826.5 | ₹11,487.07 |
| 3 | Providing and laying in position Cement Concrete of specified grade excluding the cost of centring and shuttering, all work Upto plinth level (1:3:6) 1 cement:3 coarse sand:6 graded stone aggreagate 20mm nominal size (crusher) | 77.92 | cum | 5,733.6 | ₹4,46,762.11 |
| 4 | Supply and Dumping of Stone boulder | 33.4 | cum | 937.7 | ₹31,319.18 |
| 5 | Centering and shuttering including strutting, propping etc. and removal of form work for:Foundation etc, | 76.36 | Sqm | 286.35 | ₹21,865.69 |
| 6 | Centering and shuttering including strutting, propping etc. and removal of form work for:4.6.2 Retaining walls, return walls, walls (any thickness) including attached pilasters buttresses, plinth and string course fillets, kerbs andsteps etc. | 42.93 | Sqm | 628.95 | ₹27,000.82 |
| 7 | Carriage of Sand and Stone Agg av. 10 KM by M.T (paid as per actual) | 109.21 | cum | 279.04 | ₹30,473.96 |
| 8 | Carriage of Stone Boulder Agg av. 5 KM by M.T (paid as per actual) | 33.4 | cum | 236.16 | ₹7,887.74 |
| 9 | CIB (citizen information Board ) | 1 | nos | 1,500 | ₹1,500 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.12 MB
BOQ_1099114.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .