| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹1.7 LAccepted-Finance 54 JAWAHAR MARG NAGDA DISTT UJJAIN PIN 456335 | NAGDA | UJJAIN | MADHYA PRADESH | 456335 | L-1 | Accepted-Finance L-1 | |
| 2 | L-2₹1.8 L+₹13,289.60 (8.05%)Accepted-Finance GRAM SIROLIYA DEWAS MP PIN 455001 | DEWAS | DEWAS | MADHYA PRADESH | 455001 | L-2 | Accepted-Finance L-2 | |
| 3 | L-3₹1.9 L+₹26,908.52 (16.3%)Accepted-Finance | L-3 | Accepted-Finance L-3 | |
| 4 | L-4₹1.9 L+₹26,988.96 (16.3%)Accepted-Finance 01 GROUND FLOOR SURDAS COMPLEX OPP MPEB OFFICE KUKSHI 454331 | KUKSHI | DHAR | MADHYA PRADESH | 454331 | L-4 | Accepted-Finance L-4 | |
| 5 | L-5₹2.1 L+₹43,605.72 (26.4%)Accepted-Finance KACHCHI PIPARIYA RAHLI SAGAR MP | SAGAR | MADHYA PRADESH | 470227 | L-5 | Accepted-Finance L-5 |
| Sl No | Description | Qty | Unit | MAHABALI GROUP OF ENGINEERING SERVICES | SHIVAAY TECHNICAL SERVICES | JOY SHREE ENTERPRISES | JWALADEVI ELECTRICAL AND CONSTRUCTION | NARMADEHAR ENGINEERING |
|---|---|---|---|---|---|---|---|---|
| 1.01 | Erection of structure
Erection of 132 KV LA Structure including shifting within s/s premices, fixing & alignment of template for bolted type structure foundation , tightening of nut bolts, washers etc., & including alignment & levelling of structure | 0.41 | MT | 828 ₹977.04 | 1,418.78 ₹1,674.16 | 621 ₹732.78 Lowest | 2,070 ₹2,442.6 | 1,733.83 ₹2,045.92 |
| 1.02 | Dismantling of 33 KV LA by shifting & unloading upto the carriage & shifting of 33 KV LA from structure & removing of all accessories, all connections, removing all jumpers etc. | 3 | Nos | 4,500 ₹5,310 | 3,225 ₹3,805.5 | 3,000 ₹3,540 | 4,500 ₹5,310 | 1,980 ₹2,336.4 Lowest |
| 1.03 | Erection of 33 KV LA from carriage & shifting of 33 KV LA up to Civil foundation and placement on structure with fixing of all accessories, making all connections, checking & installation of insulator base & surge counter , making all jumpers etc. | 3 | Nos | 6,600 ₹7,788 | 2,700 ₹3,186 Lowest | 6,000 ₹7,080 | 4,500 ₹5,310 | 3,960 ₹4,672.8 |
| 1.04 | ACSR Conductor laying (for Xmer HV & LV neutral) connection with Single Zebra conductor, including fixing of insulator string spares, clamps, etc. (Single Zebra Conductor). | 75 | Mtr. | 2,250 ₹2,655 | 1,875 ₹2,212.5 Lowest | 1,875 ₹2,212.5 Lowest | 4,500 ₹5,310 | 2,700 ₹3,186 |
| 1.05 | Erection & Assembly of 132/33KV 63 MVA Transformer
Complete erection and assembly of new 63MVA 132/33KV Transformer with connections etc. including istallation of ets accessories, like bushings, headers, Radiators, Canservators, Breathers, cooling fans, Marshalling Box, transformer wiring, OLTC mechanism, Thermosiphon, RTCC Panel, Protection element, pipe work, control cabinet etc. after preliminary inpection, Handling and filling of oil in the transformer as per prescribed procedure and filtration of transformer, along with handling of associated equipments like filter machine, oil storage tanker loading & unloading etc. (provided by company) | 1 | Nos | 1,20,000 ₹1,41,600 | 1,10,000 ₹1,29,800 | 90,000 ₹1,06,200 Lowest | 1,20,000 ₹1,41,600 | 1,12,200 ₹1,32,396 |
| 1.06 | Laying of cables 2 Core x 2.5 Sq.mm Unarmored on racks/cable trays/angle support overhead racks, conduits including dressing of cables with accessories for copper conductor and armor control cables | 300 | Mtr. | 2,700 ₹3,186 | 1,320 ₹1,557.6 Lowest | 1,500 ₹1,770 | 1,500 ₹1,770 | 1,800 ₹2,124 |
| 1.07 | Laying of cables 4 Core x 2.5 Sq.mm Unarmored on racks/cable trays/angle support overhead racks, conduits including dressing of cables with accessories for copper conductor and armor control cables | 500 | Mtr. | 2,500 ₹2,950 Lowest | 2,675 ₹3,156.5 | 3,500 ₹4,130 | 3,000 ₹3,540 | 3,500 ₹4,130 |
| 1.08 | Laying of cables 8 Core x 2.5 Sq.mm Unarmored on racks/cable trays/angle support overhead racks, conduits including dressing of cables with accessories for copper conductor and armor control cables | 500 | Mtr. | 4,000 ₹4,720 | 3,125 ₹3,687.5 Lowest | 4,500 ₹5,310 | 4,500 ₹5,310 | 4,000 ₹4,720 |
| 1.09 | Laying of cables 12 Core x 2.5 Sq.mm Unarmored on racks/cable trays/angle support overhead racks, conduits including dressing of cables with accessories for copper conductor and armor control cables | 1,000 | Mtr. | 7,000 ₹8,260 Lowest | 8,100 ₹9,558 | 11,000 ₹12,980 | 15,000 ₹17,700 | 10,000 ₹11,800 |
| 1.10 | Laying of cables 19 Core x 2.5 Sq.mm Unarmored on racks/cable trays/angle support overhead racks, conduits including dressing of cables with accessories for copper conductor and armor control cables | 500 | Mtr. | 2,500 ₹2,950 Lowest | 6,700 ₹7,906 | 6,500 ₹7,670 | 10,000 ₹11,800 | 8,500 ₹10,030 |
Tender Value
₹2.7 L
EMD Value
₹8,000
Closing Date
29 Oct 2025, 5:00 pmClosed
Superintending Engineer
Superintending Engineer 400KV Testing Circle MPPTCL Khandwa
Erection work of 63 MVA transformer and other associated work at Barwani 132 KV Substation
2025_MPPTC_456907_1
4380000/NIT/TS-02/25-26/425
Open Tender
Electrical Works
Item Wise
30 days
Barwani 132 KV Substation
Please refer Tender documents.
8 documents required · 8 mandatory
₹590
₹8,000
Yes
2 Dec 2025
10 Oct 2025
31 Oct 2025
10 Oct 2025
29 Oct 2025
11 Oct 2025
Erection of structure Erection of 132 KV LA Structure including shifting within s/s premices, fixing & alignment of template for bolted type structure foundation , tightening of nut bolts, washers etc., & including alignment & levelling of structure
Dismantling of 33 KV LA by shifting & unloading upto the carriage & shifting of 33 KV LA from structure & removing of all accessories, all connections, removing all jumpers etc.
Erection of 33 KV LA from carriage & shifting of 33 KV LA up to Civil foundation and placement on structure with fixing of all accessories, making all connections, checking & installation of insulator base & surge counter , making all jumpers etc.
ACSR Conductor laying (for Xmer HV & LV neutral) connection with Single Zebra conductor, including fixing of insulator string spares, clamps, etc. (Single Zebra Conductor).
Erection & Assembly of 132/33KV 63 MVA Transformer Complete erection and assembly of new 63MVA 132/33KV Transformer with connections etc. including istallation of ets accessories, like bushings, headers, Radiators, Canservators, Breathers, cooling fans, Marshalling Box, transformer wiring, OLTC mechanism, Thermosiphon, RTCC Panel, Protection element, pipe work, control cabinet etc. after preliminary inpection, Handling and filling of oil in the transformer as per prescribed procedure and filtration of transformer, along with handling of associated equipments like filter machine, oil storage tanker loading & unloading etc. (provided by company)
Laying of cables 2 Core x 2.5 Sq.mm Unarmored on racks/cable trays/angle support overhead racks, conduits including dressing of cables with accessories for copper conductor and armor control cables
Laying of cables 4 Core x 2.5 Sq.mm Unarmored on racks/cable trays/angle support overhead racks, conduits including dressing of cables with accessories for copper conductor and armor control cables
Laying of cables 8 Core x 2.5 Sq.mm Unarmored on racks/cable trays/angle support overhead racks, conduits including dressing of cables with accessories for copper conductor and armor control cables
Laying of cables 12 Core x 2.5 Sq.mm Unarmored on racks/cable trays/angle support overhead racks, conduits including dressing of cables with accessories for copper conductor and armor control cables
Laying of cables 19 Core x 2.5 Sq.mm Unarmored on racks/cable trays/angle support overhead racks, conduits including dressing of cables with accessories for copper conductor and armor control cables
Cable terminations consisting the work of providing holes for cable entry, fixing of cable glands, lugs etc. for 2 Core x 2.5 Sq.mm Unarmored control / Power cables, including terminations at both end
Cable terminations consisting the work of providing holes for cable entry, fixing of cable glands, lugs etc. for 4 Core x 2.5 Sq.mm Unarmored control / Power cables, including terminations at both end
Cable terminations consisting the work of providing holes for cable entry, fixing of cable glands, lugs etc. for 8 Core x 2.5 Sq.mm Unarmored control / Power cables, including terminations at both end
Cable terminations consisting the work of providing holes for cable entry, fixing of cable glands, lugs etc. for 12 Core x 2.5 Sq.mm Unarmored control / Power cables, including terminations at both end
Cable terminations consisting the work of providing holes for cable entry, fixing of cable glands, lugs etc. for 19 Core x 2.5 Sq.mm Unarmored control / Power cables, including terminations at both end
Earthing installation- Laying of Flat (65 mm x 8 mm) duly buried at a depth of 0.5 mtr. providing or risers for structures earthing including back filling welding etc. structure earthing of following length.
Earthing installation- Laying of Flat (50 mm x 6mm) duly buried at a depth of 0.5 mtr. providing or risers for structures earthing including back filling welding etc. structure earthing of following length.
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.72 MB
TS02DOCBarwani.pdf
Tender Documents • 2.14 MB
BOQ_537423.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .