| 1 | L1₹82.6 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹85.0 L+₹2.4 L (2.88%)Rejected-AOC 1 136 SOUTH STREET MUTHUMOOTHANMOZHI RADHAPURAM TALUK TIRUNELVELI DISTRICT 627 657 | TIRUNELVELI | TAMIL NADU | 627657 | L2 | Rejected-AOC L2 |
Tender Value
₹84.7 L
EMD Value
₹85,000
Closing Date
3 Jul 2023, 3:00 pmClosed
Additional Collector (Dev),DRDA,Thoothukudi
O/O AC (D) / PD DRDA Thoothukudi
Thoothukudi District-MGSMT 25 percentage Component- 2022-23- Upgradation/ Strengthening/ Renewal of 2 No of Rural Roads in Srivaikundam Block Package No.TN/TUT-03/ MGSMT- 2022-23
2023_RDTN_330600_1
CRDPRChennaiLr.No. DIPR/3113/Tender/23 dt.18.06.23
Open Tender
Civil Works - Roads
Item Rate
180 days
Thoothukudi District
As per Tender Schedule
4 documents required · 4 mandatory
₹0
₹85,000
O/O AC (D) / PD DRDA Thoothukudi
7 Sept 2023
21 Jun 2023
3 Jul 2023
21 Jun 2023
3 Jul 2023
28 Jun 2023
26 Jun 2023
Amount
Clearing the Scrub jungle including all labour charges for burrying and burning etc., km 0/0-1/284
Picking the existing BT surface including all labour charges etc. km 0/0-1/284
Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all labour charges and incidental charges such as shoring, strutting, providing coffer dams, bailing out of water as per 20A km 0/0-1/284
Providing and Laying Red Gravel side berms including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction at optimum moisture content and hire & fuel charges for power roller , water sprinkler and all other incidental charges such as traffic barricading and providing danger lights etc, complete.
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete. Km 0/0-1/284
Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it. Km 0/0-1/284
Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., Km 0/0-1/284
BITUMINOUS CONCRETE 25, 30/40 MM THICK USING cmp (Grade-II) Providing and laying Bituminious concrete to 40mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5 Km 0/0-1/284
Provision for KM Stone
Provision for HM Stone
Providing and laying of hot applied Thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 gms per sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35. The finished surface to be level, uniform and free from streaks and holes etc complete as per MORT&H specification No.803 Km0/0-1/284
Provision for Name Board cum Citizen Information Boards
Provision fof Rumble stripps covered with bituminous carpet 15 to 20mm high at centre to 50mm wide placed at 1 m c/c at approved location to control speed marked with white stripps of road marking paint for 1 Rumble stripps = 3 x 3.75 x 0.025
Provision for 60 cm Equilateral triangle cautionery sign board
Towards the charges for routine maintenance of the road work executed under Bharat Nirman including dressing of bermsby refilling the gully with form berms, desilting of side drains and CD works , Whitewashing guardstones, painting of KM & HM stones,Parapets, cutting of breaches of trees, refixing displaced guard stones , caution boards, speed limit boards etc with the periodiocity for the above actitvities as prescribed in IRC SP 20-2002 and as directed by the departmental officers except for the constructional defects which has to be rectiufied by the contractor at his own cost.
For the second six months from the date of completion of work
For the second year from the date of completion of work
For the third year from the date of completion of work
For the fourth year from the date of completion of work
For the fifth year from the date of completion of work
Strengthening the road of Lakshmipuram Ganapathisamuthiram Road (R 87) km 0/0-0/960 in Kottarakurichi Panchayat in Srivaikundam Panchayat Union
Clearing the Scrub jungle including all labour charges for burrying and burning etc., KM 0/0-0/960
Picking the existing BT surface including all labour charges etc.KM 0/0-0/960
Providing and Laying Red Gravel side berms including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction at optimum moisture content and hire & fuel charges for power roller , water sprinkler and all other incidental charges such as traffic barricading and providing danger lights etc, complete. KM 0/0-0/960
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete. KM 0/0-0/960
Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it.KM 0/0-0/960
Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., KM 0/0-0/960
BITUMINOUS CONCRETE 25, 30/40 MM THICK USING cmp (Grade-II) Providing and laying Bituminious concrete to 40mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5 KM 0/0-0/960
Provision for HM Stone
Providing and laying of hot applied Thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 gms per sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35. The finished surface to be level, uniform and free from streaks and holes etc complete as per MORT&H specification No.803 Km0/0-0/960
Provision for Name Board cum Citizen Information Boards
Provisiion for 60cm circle ( Mandatory sign board)
Provision for 60 cm Equilateral triangle cautionery sign board
Provision fof Rumble stripps covered with bituminous carpet 15 to 20mm high at centre to 50mm wide placed at 1 m c/c at approved location to control speed marked with white stripps of road marking paint for 1 Rumble stripps = 3 x 3.75 x 0.025
Construction of Drainage @ ch.600 m
Earth work excavation in all clauses of soil with initial lead and lift except hard rock requiring blasting as per SS 20B for foundation etc., complete.
Cement concrete 1:4:8 mix using 40m ISS HBG metal including cost and conveyance of all materials and all labour charges etc., complete.
Cement concrete 1:2:4 mix using 20m ISS HBG metal including cost and conveyance of all materials and all labour charges etc., complete.
RCC 1:1.5:3 mix using 20mm ISS HBG metal including all cost and conveyance and all labour charges etc., complete.
Supplying, Fabricating and placing in position of MS steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc, Complete complying with standard specification.
Centering charges for all concrete works including all cost and conveyance of all materials and all labour charges etc., complete.
RCC Precast Slabs using RCC 1:2:4 using 20mm gauge hard broken granite stone jelly including cost and all labour charges etc. complete - using 75mm thickness /sqm
Vertical soak pit
Earthwork excavation for foundation in all solls and sub soils with an initial lead of 10m and initial lift of 2m including refilling the sides
Cement concrete 1:4:8 mix using 40m ISS HBG metal including cost and conveyance of all materials and all labour charges etc., complete.
Cement concrete 1:2:4 mix using 20m ISS HBG metal including cost and conveyance of all materials and all labour charges etc., complete.
Brick work with c.m 1:5 mix Using country bricks including all cost and conveyance of materials, labour charges such as curing, etc., complete as per standard specification.
plastering with c.m 1:5 mix 12 mm thick including all cost and conveyance of materials, labour charges such as curing, etc., complete as per standard specification.
Supply and filling with 225 mm HBG Metal including all cost and conveyance of materials, labour charges etc., complete as per standard specification.
Supply and filling with 40 mm HBG Metal including all cost and conveyance of materials, labour charges etc., complete as per standard specification.
Supply and filling with 20 mm HBG Metal including all cost and conveyance of materials, labour charges etc., complete as per standard specification.
Supply and filling with Gravel from approved quarry including all cost and conveyance of materials, labour charges , etc., complete as per standard specification.
Colour washing two coats using approved colour including all cost and conveyance of materials, labour charges , etc., complete as per standard specification.
Construction of Pipe Culvert @ ch.954 m
Earthwork excavation for foundation in all solls and sub soils with an initial lead of 10m and initial lift of 2m including refilling the sides SS 20B
Filling in with M sand including all cost and conveyance of materials, labour charges such as watering and ramming, etc., complete as per standard specification.
Cement concrete 1:4:8 mix using 40m ISS HBG metal including cost and conveyance of all materials and all labour charges etc., complete.
Centering charges for all concrete works including all cost and conveyance of all materials and all labour charges etc., complete.
Cement concrete 1:3:6mix using 40m ISS HBG metal including cost and conveyance of all materials and all labour charges etc., complete.
Filling the collected Red Gravel including cost and conveyance of all materials etc.complete
Towards the charges for routine maintenance of the road work executed under Bharat Nirman including dressing of bermsby refilling the gully with form berms, desilting of side drains and CD works , Whitewashing guardstones, painting of KM & HM stones,Parapets, cutting of breaches of trees, refixing displaced guard stones , caution boards, speed limit boards etc with the periodiocity for the above actitvities as prescribed in IRC SP 20-2002 and as directed by the departmental officers except for the constructional defects which has to be rectiufied by the contractor at his own cost.
For the second six months from the date of completion of work
For the second year from the date of completion of work
For the third year from the date of completion of work
For the fourth year from the date of completion of work
For the fifth year from the date of completion of work
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Aadirudhan Construction
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .