Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.0 LAccepted-Finance | ₹7.0 L | L1 | Accepted-Finance Lowest bidder |
| 2 | L2₹7.9 L+₹92,401.50 (13.3%)Accepted-Finance PERAMBALUR | PERAMBALUR | PERAMBALUR | TAMIL NADU | 621212 | ₹7.9 L+₹92,401.50 (13.3%) | L2 | Accepted-Finance other than Lowest bidder |
| 3 | L3₹8.0 L+₹1.0 L (14.4%)Accepted-Finance | ₹8.0 L+₹1.0 L (14.4%) | L3 | Accepted-Finance other than Lowest bidder |
| 4 | L4₹10.0 L+₹3.0 L (43.1%)Accepted-Finance | ₹10.0 L+₹3.0 L (43.1%) | L4 | Accepted-Finance other than Lowest bidder |
Tender Value
₹8.3 L
EMD Value
₹8,500
Closing Date
17 Sept 2026, 2:00 pmClosed
Executive Engineer, WRD.,
O/o the Executive Engineer, WRD, Marudaiyaru Basin Division, Ariyalur
Formation of Mudkorambu in Coleroon River LS mile 47/6 at Kuruvadi Village in Udayarpalayam Taluk of Ariyalur District for the year of 2026 - 2027.
2026_WRD_700037_1
e.Tender Notice no. 04 / 2026-27 / Marudaiyaru Basin Division, Ariyalur / Dated. 31.08.2026
Open Tender
Civil Works
Lump-sum
180 days
Kuruvadi
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹8,500
18 Sept 2026
1 Sept 2026
18 Sept 2026
1 Sept 2026
17 Sept 2026
1 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Supply of eucaliptus piles of 10cm to 13cm dia at site of work etc. complete complying with standard specifications and as directed by the Departmental Engineers. | 2,000 | RM | 25.2 | ₹50,400 |
| 2 | Pointing the edge and driving the piles into river bed for the first 1m depth below ground level etc. complete complying with standard specifications and as directed by the Departmental Engineers. | 800 | Nos | 27.15 | ₹21,720 |
| 3 | Supply and fixing of eucaliptus wallings of 4cm to 5cm dia and cross ties with nails tying with ropes etc.complete complying with standard specifications and as directed by the Departmental Engineers. | 1,600 | RM | 31.85 | ₹50,960 |
| 4 | Supplying and filling up the empty cement gunny bags with sand stitching them conveying them to site and stacking with in a lead of 10m including cost of bags, Jute, thread, needle, sand etc., complete complying with standard specifications and as directed by the Departmental Engineers. | 15,902 | Nos | 19.05 | ₹3,02,933.1 |
| 5 | Earth work deploying earth moving machineries for desilting channel and forming bund on either side and depositing the earth on banks including jungle clearence etc., complete. and as directed by the Departmental officers. | 6,060 | M3 | 45.8 | ₹2,77,548 |
| 9 | GST 18% in Figures | 1 | Nos | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
finance_841486.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.43 MB
BOQ_841486.xls
BOQ • 0.34 MB
tenderschedule.pdf
Tender Documents • 0.61 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .