| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.3 LAdmitted-Finance | -0.55% | ₹2.3 L | L1 | Admitted-Finance |
| 2 | L2₹2.4 L+₹8,443.79 (3.67%)Admitted-Finance 110 SILVER STATE COLONY RUNKATA AGRA | +3.10% | ₹2.4 L+₹8,443.79 (3.67%) | L2 | Admitted-Finance |
| 3 | L3₹2.4 L+₹11,798.17 (5.13%)Admitted-Finance BHONDE 20 SHYAM DHAM COLONY SHANIDEV ROAD RUNAKTA AGRA | AGRA | AGRA | UTTAR PRADESH | 282007 | +4.55% | ₹2.4 L+₹11,798.17 (5.13%) | L3 | Admitted-Finance |
Tender Value
₹2.3 L
EMD Value
₹2,500
Closing Date
22 May 2026, 4:00 pmClosed
SE ECC(D)Agra
220 KV Sub Station 64 Khamba Sikandra Agra
Annual Maintenance Works of all office buildings situated within the premises of the Chief Engineer (Distribution), Firozabad Zone, at 33/11 KV Substation, S.N Hospital, District Firozabad
2026_DVVNL_1148620_1
10/ECC(D)Ag/2026-27
Open Tender
Civil Works
Percentage
365 days
SE ECC(D)Agra
As Per Tender Documents
3 documents required · 3 mandatory
₹1,180
DVVNL
₹2,500
9 Jul 2026
15 May 2026
23 May 2026
15 May 2026
22 May 2026
15 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. (DSR 2.8) All kinds of soil. (DSR 2.8.1) | 1 | cum | 194.96 | ₹194.96 |
| 2 | Excavating, supplying, stacking and filling of local earth (including royalty) by mechanical transport upto a lead of 5km also including ramming and watering of the earth in layers not exceeding 20 cm in foundation trenches, plinth, sides of foundation etc. complete for all lift. (DSR ) (DSR 2.25(a)) | 0.5 | cum | 524.67 | ₹262.34 |
| 3 | Surface dressing of the ground including removing vegetation and in-equalities not exceeding 15 cm deep and disposal of rubbish, lead up to 50 m and lift up to 1.5 m. (DSR 2.28) All kinds of soil (DSR 2.28.1) | 20 | sqm | 25.58 | ₹511.6 |
| 4 | Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared. (DSR ) (DSR 2.31) | 20 | sqm | 13.18 | ₹263.6 |
| 5 | Clearing grass and removal of the rubbish up to a distance of 50 m outside the periphery of the area cleared. (DSR ) (DSR 2.32) | 50 | sqm | 6.7 | ₹335 |
| 6 | Diluting and injecting chemical emulsion for POST-CONSTRUCTIONAL anti-termite treatment (excluding the cost of chemical emulsion) : (DSR 2.35) Treatment of existing masonry using chemical emulsion @ one litre per hole at 300 mm interval including drilling holes at 45 degree and plugging them with cement mortar 1:2 (1 cement : 2 coarse sand) to the full depth of the hole : 2.35.4 With Chlorpyriphos/Lindane E.C. 20% with 1% concentration (DSR 2.35.4.1) | 2 | metre | 32.21 | ₹64.42 |
| 7 | Diluting and injecting chemical emulsion for POST-CONSTRUCTIONAL anti-termite treatment (excluding the cost of chemical emulsion) : (DSR 2.35) Treatment at points of contact of wood work by chemical emulsion Chlorpyriphos/ Lindane (in oil or kerosene based solution) @ 0.5 litres per hole by drilling 6 mm dia holes at downward angle of 45 degree at 150 mm centre to centre and sealing the same. (DSR 2.35.5) | 2 | metre | 209.5 | ₹419 |
| 8 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : (DSR 4.1) 1:1½:3 (1 Cement: 1½ coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) (DSR 4.1.2) | 0.2 | cum | 6,247.3 | ₹1,249.46 |
| 9 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : (DSR 4.1) 1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) (DSR 4.1.8) | 0.25 | cum | 5,102.19 | ₹1,275.55 |
| 10 | Providing and laying damp-proof course 50mm thick with cement concrete 1:2:4 (1 cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 20mm nominal size derived from natural sources). (DSR ) (DSR 4.11) | 2 | sqm | 371.32 | ₹742.64 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.50 MB
TenderDocuments_Affidavite2026.pdf
Tender Documents • 0.19 MB
TenderDocuments_Anti Profiting Clouse1.pdf
Tender Documents • 0.16 MB
TenderDocuments_PQC2026.pdf
Tender Documents • 0.46 MB
TenderDocuments_Special Condition2026.pdf
Tender Documents • 0.36 MB
TenderDocuments_Tender Document.pdf
Tender Documents • 0.37 MB
BOQ_2150114.xls
BOQ • 0.45 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .