Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹83.0 LAccepted-Finance | ₹83.0 L | L1 | Accepted-Finance Financially Successful |
| 2 | L2₹85.2 LRejected-Finance H NO 17 A NONDEM NETRAVALI SANGUEM GOA | SANGUEM | SOUTH GOA | GOA | ₹85.2 L | L2 | Rejected-Finance Financially Unsuccessful |
Tender Value
₹79.6 L
EMD Value
₹1.6 L
Closing Date
29 Apr 2026, 3:00 pmClosed
Executive Director
1st Floor, Atal Stadium, Cujira, St Cruz, Goa
Construction of Rest Room for Athletes at Amone, Canacona, Goa
2026_TSAG_28854_1
SAG/EE-ED/TECH/F08/26-27/224_6
Open Tender
Miscellaneous Works
Percentage
180 days
Canacona
Please refer Tender documents.
2 documents required · 2 mandatory
₹10,000
₹1.6 L
20 May 2026
22 Apr 2026
30 Apr 2026
22 Apr 2026
29 Apr 2026
22 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Earthwork in excavation by mechanical means (hydraulic excavator)/manual means in foundation pipeline trenches drain (not exceeding 1.5 m in width or 10 sq.m. on plan) including dressing of sides and ramming of bottoms, refilling, lift upto 1.5 m including getting out the excavated soil and disposal of surplus excavated soil as directed within a lead of 50 m. (a) All kinds of soil | |||||
| 2Rubble packing with hard laterite stone under floors including watering ramming and consolidating etc. in pipeline trenches and other foundations complete. | |||||
| 3Providing & laying cement concrete 1:2:4 (1 cement: 2 coarse sand: 4 graded granitic or basaltic stone aggrt. 20 mm. nominal size) excluding cost of centering, shuttering and finishing in: (a)All works upto plinth level | |||||
| 4Laterite masonry in neatly dressed stones of size as specified in cement mortar 1: 4 (1 cement : 4 coarse sand) in foundation and basement. | |||||
| 5Centering & shuttering including Strutting, Propping & removal of forms for : Foundations, Footings, Bases for columns | |||||
| 5.1 | Columns, Piers, Pillars, Abutments, Posts and struts (square rectangle polygon in plan) | - | Sqm | - | - |
| 5.2 | Sides and Soffits of beams, Beam Haunchings, Cantilever, Girders, Bressumers and Lintels plinth beams not exceeding 1m in depth | - | Sqm | - | - |
| 5.3 | Staircases (except spiral staircases) excluding landing. | - | Sqm | - | - |
| 5.4 | Suspended floors, roofs landings, shelves & their supports | - | Sqm | - | - |
| 6Supplying and filling in plinth under floors, trenches including watering ramming consolidating, dressing complete. B) Moorum | |||||
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.32 MB
Tendernotice_2.pdf
PDF • 0.44 MB
BOQ_29290.xls
BOQ • 0.36 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].