Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.7 LAccepted-AOC 194 IIND FLOOR POCKET 9 SECTOR 24 ROHINI DELHI 110085 | DELHI | NORTH WEST DELHI | DELHI | 110085 | L1 | Accepted-AOC Lowest | |
| 2 | L2₹6.8 L+₹9,694 (1.44%)Rejected-Finance CHANDIGARH | CHANDIGARH | CHANDIGARH | 160001 | L2 | Rejected-Finance Other than lowest | |
| 3 | L3₹7.4 L+₹69,020 (10.3%)Rejected-Finance 50 SARASWATI VIHAR SINGHAWALA AMBALA CITY | AMBALA CITY | L3 | Rejected-Finance Other than lowest |
| Sl No | Description | Qty | Unit | R N Enterprises L3 | Jai Maa Electrical Works L2 | JYOTI CONTRACTORS AND TRADERS L1 |
|---|---|---|---|---|---|---|
| 1.00 | Excavation in trenches not exceeding 1.5 metre wide and not exceeding 1.5 metre deep in loose/soft soil and getting out for underground cable/erection of poles, stays, trench etc complete all as specified and as directed. | 138 | Cubic Metre | 80 ₹11,040 Lowest | 100 ₹13,800 | 80 ₹11,040 Lowest |
| 2.00 | All as per item sr no 1 here-in-before but exceeding 1.5 metre deep but not exceeding 3.0 metre deep complete all as specified and directed. | 0.5 | Cubic Metre | 200 ₹100 | 100 ₹50 Lowest | 120 ₹60 |
| 3.00 | Material and labour, sand cushioning with a layer of dry river sand, 80 mm thick before laying of cable and 150 mm thick after laying of cables (punned down to 180 mm thick), in trenches/ducts, complete all as specified and directed.
Note : Punned down thickness (overall 18 cm), shall be considered for measurement and payment. | 37 | Cubic Metre | 350 ₹12,950 | 300 ₹11,100 Lowest | 450 ₹16,650 |
| 4.00 | Material and labour, locally available, sub class `B’ bricks (old size), laid flat and dry perpendicular to the direction of cable adjacent to each other, in trenches over the cable for protection, complete all as specified and directed. | 7 | Cubic Metre | 3,550 ₹24,850 | 1,500 ₹10,500 Lowest | 4,000 ₹28,000 |
| 5.00 | Returning, filling in including spreading, leveling, watering and well ramming in layers not exceeding 25 cm thick layers complete all as specified and as directed. | 90 | Cubic Metre | 5 ₹450 Lowest | 50 ₹4,500 | 10 ₹900 |
| 6.00 | Removal of excavated material not exceeding 50 metre away and depositing where directed at a level not exceeding 1.5 metre above from starting point complete all as specified and as directed. | 43 | Cubic Metre | 5 ₹215 Lowest | 50 ₹2,150 | 20 ₹860 |
| 7.00 | Supply and laying, connecting and testing XLPE underground cable insulated, and overall sheathed with aluminium conductor heavy duty 1100 volts grade 25 sqmm 3.5 core laid in trenches/ on poles/ road crossing or passing through existing/new pipe under road crossing, clamping on wall etc complete all as specified and directed.
Note: (i) Earth work, removing, returning filling and pipe will be measured and paid separately.
(ii) Cost of laying electrical cable through new/existing pipe under road, buildings, railway tracks, highways are incl in the quoted rates.
(iii) All equipments , machinery or tools if required for laying electrical cable through new/existing pipes are provided by the contractor without any extra cost. | 650 | Running Metre | 129 ₹83,850 | 175 ₹1,13,750 | 115 ₹74,750 Lowest |
| 8.00 | Supply and erection in true vertical position steel tubler swaged pole type 410 SP-22 8.5 metre long complete with cast iron base plate and final taper plug, bolts, nuts, washers and screws complete all as specified and as directed.
Note:- (i) Earth work and PCC shall be measured and paid separately. | 19 | Each | 19,250 ₹3,65,750 | 14,500 ₹2,75,500 | 13,000 ₹2,47,000 Lowest |
| 9.00 | Material and labour plain cement concrete 1:2:4 type B-1 using 20mm graded crushed stone aggregate as in coping of poles etc including necessary form work, complete all as specified and directed. | 1.5 | Cubic Metre | 2,250 ₹3,375 | 1,500 ₹2,250 Lowest | 5,200 ₹7,800 |
| 10.00 | Material and labour for plain cement concrete 1:4:8 type D-2 using 40mm graded crushed stone aggregate as in foundation filling and mass concrete, complete all as specified and directed. | 11.5 | Cubic Metre | 1,750 ₹20,125 Lowest | 2,000 ₹23,000 | 3,800 ₹43,700 |
Tender Value
₹9.6 L
EMD Value
₹19,300
Closing Date
21 Aug 2025, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
AGE (I) Highground
AGE (I) Highground Chandigarh
PROVN OF LIGHTS AT CERTAIN LOCATIONS AT AIR FORCE STATION HIGHGROUND UNDER AGE (I) HIGHGROUND CHANDIGARH
2025_MES_722319_1
AGE (I)/HG CHD/T-15/2025-26
Open Tender
Electrical and Maintenance Works
Works
180 days
AGE (I) Highground Chandigarh
Please refer Tender documents.
8 documents required · 8 mandatory
₹500
AGE (I) Highground
₹19,300
Yes
27 Oct 2025
24 Jul 2025
28 Aug 2025
24 Jul 2025
21 Aug 2025
7 Aug 2025
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .