| 1 | L1₹22.5 LAccepted-AOC 224 KAILASH NAGAR SHOBHAPUR COLONY DISTRICT BETUL MADHYA PRADESH PIN 460449 | BETUL | MADHYA PRADESH | 460449 | ₹22.5 L | L1 | Accepted-AOC L1 Bidder |
| 2 | L2₹24.0 L+₹1.5 L (6.78%)Rejected-AOC | ₹24.0 L+₹1.5 L (6.78%) | L2 | Rejected-AOC L2 Bidder |
| 3 | Rejected-Technical D TYPE COLONY OD 46 SAMI 460447 | BETUL | MADHYA PRADESH | 460447 | - | - | Rejected-Technical DISQUALIFIED |
| Sl No | Description | Qty | Unit | M/S TIRUPATI CONSTRUCTION CO L1 | M/S HARI ENTERPRISES L2 |
|---|---|---|---|---|---|
| 1.00 | NON SOR ITEM:- Stripping & cleaning of area for foundation of the bound, dressing of benches and foundation, rehandling and removal of stripped manterial from site i/c all lead and lifts as per specification and direction of Engineer-in-charge.
Part (B/1) 390.00 M³ (Base rate 20.00 / M³) | 390 | cum | 3 ₹1,170 Lowest | 30 ₹11,700 |
| 2.00 | NON SOR ITEM:- Preparation of foundation i/c compation to achieve dry density not less than 95% of the maximum dry density with approved roller or any other mechanical means i/c all labour materials equipment, tools & plants all lead lift, safeguard etc. complete as per specification drawing and as directed by the Engineer-in-charge.
Part (B/2) 360.00 M² (Base rate 4.00/ M²) | 360 | sqm | 28 ₹10,080 | 10 ₹3,600 Lowest |
| 3.00 | NON SOR ITEM:- Excavation in all type of soil/hard moorum/ ash with 100m lead and 1.50 m lift with dressing as per direction of Engineer-in-charge.
Part (B/3) = 560.00 M³ (Base rate 55.00/ M³) | 560 | cum | 70 ₹39,200 Lowest | 80 ₹44,800 |
| 4.00 | NON SOR ITEM:- Earthwork/Ash work in excavation/ embankment with approved quality soil/ Ash by means of earth / Ash i/c cleaning of borrow pit/ foundation area by uprooting of all type of vegitation, grass bushes, sapling etc. by any means and stripping of top layer of min 20 cm to such depth as decided by the Engineer-in-charge, depending upon the suitability of ash to be used in forming ash embankment key etc. i/c disposal of all unsuitable materials out side the working zone area with all lead and lifts complete as per direction of Engineer-in-charge i/c loading, transportation unloading suitable/ selected excavated materials on the bank in layers not exceeding 250 mm thick for forming the embankment with all lead, lifts breaking clods/ lumps watering compaction etc. to achieve dry density not less than 95% standared proctor with approved mechanical means, Triming of slopes to theoritical profile i/c all other incidential charges such as watering etc. Cost of labour, equipment and materials etc. complete as per specification drawing and direction of Engineer-in-charge.
EARTH:- Part (B/4) = 867.00 M³ (Base rate 140.00/M³) | 867 | cum | 170 ₹1,47,390 | 160 ₹1,38,720 Lowest |
| 5.00 | NON SOR ITEM:- Supply & forming sand blanket / chimney filter in the embankment by using clean, sound and well graded coarse sand of approved quality form approved source i/c all transportation loading, unloading, cost of materials, T&P royaty all taxes etc. with all leads and lifts, placing in position as described in the drawing, specification, compaction with approved equipments to achieve relative density not less then 70% etc. complete i/c cost of labour, excavation in earth, where ever required for placing disposal of excavated materials to specified places with all lead, lifts, equipment, T&P safe guard incidentals etc. complete as per specification and as directed by Engineer-in-charge for horizontal & vertical filter.
Part (B/6) = 3.60 M³ (Base rate 800.00 / M³) | 3.6 | cum | 1,600 ₹5,760 | 1,400 ₹5,040 Lowest |
| 6.00 | NON SOR ITEM:- Construction of rock toe in earthen / Ash embankment with materials of hard stone veriety, ranging in size from 100 mm to 450 mm as per drawing and specification from specified quarry i/ccost of labour, materials, all lead lifts, transportation, placing in position (layers not exceeding 300mm) hand packing, wedging dressing over surface etc. complete as per direction of Engineer-in-charge.
Part (B/5) 20.00 M³ (Base rate 1250.00/ M³) | 20 | cum | 1,500 ₹30,000 Lowest | 1,600 ₹32,000 |
| 7.00 | NON SOR ITEM:- Supplying & forming graded aggregate filter satisfying the filter criteria as indicated in drawing with well graded hard stone matel of max. size 40mm to min size relatained on 4.75 mm screen around as indicated in the drawing i/c all transportation loading unloading all lead and lifts cost of materials royalty all taxes duties placing in position as described in the specification compacting with approved compaction equipment i/c all cost of labour etc. complete as per the direction of Engineer-in-charge.
Part (B/7) 3.00 M³ (Base rate 1500.00 / M³) | 3 | cum | 1,500 ₹4,500 Lowest | 1,800 ₹5,400 |
| 8.00 | NON SOR ITEM:- Supplying and laying of Doob-grass on the ash bund slopes as per specification & i/c all lead and lifts, watering to ensure grass development, maintenance etc. complete.
Part (B/8) 136.00 M² (Base rate 9.00/ M2) | 136 | sqm | 50 ₹6,800 | 20 ₹2,720 Lowest |
| 9.00 | NON SOR ITEM:- Supplying and laying in position plain cement concrete in 1:4:8 mix levelling course/ fill under or arround foundation etc. with 40 mm down graded course aggregates i/c curing vibrating dewatering as necessary required form work etc. complete.
Part (A/1) = 4.5 M³
(A/6) = 8.00 M³
(A/13) = 8.00 M³
= 20.50 M³ (Base rate 3450.00 / M³) | 20.5 | cum | 4,500 ₹92,250 | 4,000 ₹82,000 Lowest |
| 10.00 | NON SOR ITEM:- Supplying and laying in position approved quality fly Ash bricks as per IS-3812 specification in cement sand morton 1:4 for trapozoled toe drain at the toe/ top of the bund for pannel walls for slope protection and steps along the bund surface i/c curning with all lifts raking joints, materials etc. complete as per specification drawing and direction of Engineer-in-charge.
Part (B/9) 4.50 M³ (Base rate 3100.00 / M³) | 4.5 | cum | 4,500 ₹20,250 | 3,600 ₹16,200 Lowest |
Tender Value
₹27 L
EMD Value
₹54,000
Closing Date
11 Jul 2022, 3:00 pmClosed
CE GEN
CE EGN ATPS
Dismantling of spillway and construction of new spillway in pond no 1 of ash dyke phase III at ATPS Chachai
2022_MPPGC_202853_1
206
Open Tender
Civil Works - Others
Item Rate
60 days
ATPS Chachai
AS PER NIT
13 documents required · 13 mandatory
₹1,000
₹54,000
Yes
6 Aug 2026
22 Jun 2022
12 Jul 2022
22 Jun 2022
11 Jul 2022
22 Jun 2022
Amount
NON SOR ITEM:- Stripping & cleaning of area for foundation of the bound, dressing of benches and foundation, rehandling and removal of stripped manterial from site i/c all lead and lifts as per specification and direction of Engineer-in-charge. Part (B/1) 390.00 M³ (Base rate 20.00 / M³)
NON SOR ITEM:- Preparation of foundation i/c compation to achieve dry density not less than 95% of the maximum dry density with approved roller or any other mechanical means i/c all labour materials equipment, tools & plants all lead lift, safeguard etc. complete as per specification drawing and as directed by the Engineer-in-charge. Part (B/2) 360.00 M² (Base rate 4.00/ M²)
NON SOR ITEM:- Excavation in all type of soil/hard moorum/ ash with 100m lead and 1.50 m lift with dressing as per direction of Engineer-in-charge. Part (B/3) = 560.00 M³ (Base rate 55.00/ M³)
NON SOR ITEM:- Supply & forming sand blanket / chimney filter in the embankment by using clean, sound and well graded coarse sand of approved quality form approved source i/c all transportation loading, unloading, cost of materials, T&P royaty all taxes etc. with all leads and lifts, placing in position as described in the drawing, specification, compaction with approved equipments to achieve relative density not less then 70% etc. complete i/c cost of labour, excavation in earth, where ever required for placing disposal of excavated materials to specified places with all lead, lifts, equipment, T&P safe guard incidentals etc. complete as per specification and as directed by Engineer-in-charge for horizontal & vertical filter. Part (B/6) = 3.60 M³ (Base rate 800.00 / M³)
NON SOR ITEM:- Construction of rock toe in earthen / Ash embankment with materials of hard stone veriety, ranging in size from 100 mm to 450 mm as per drawing and specification from specified quarry i/ccost of labour, materials, all lead lifts, transportation, placing in position (layers not exceeding 300mm) hand packing, wedging dressing over surface etc. complete as per direction of Engineer-in-charge. Part (B/5) 20.00 M³ (Base rate 1250.00/ M³)
NON SOR ITEM:- Supplying & forming graded aggregate filter satisfying the filter criteria as indicated in drawing with well graded hard stone matel of max. size 40mm to min size relatained on 4.75 mm screen around as indicated in the drawing i/c all transportation loading unloading all lead and lifts cost of materials royalty all taxes duties placing in position as described in the specification compacting with approved compaction equipment i/c all cost of labour etc. complete as per the direction of Engineer-in-charge. Part (B/7) 3.00 M³ (Base rate 1500.00 / M³)
NON SOR ITEM:- Supplying and laying of Doob-grass on the ash bund slopes as per specification & i/c all lead and lifts, watering to ensure grass development, maintenance etc. complete. Part (B/8) 136.00 M² (Base rate 9.00/ M2)
NON SOR ITEM:- Supplying and laying in position plain cement concrete in 1:4:8 mix levelling course/ fill under or arround foundation etc. with 40 mm down graded course aggregates i/c curing vibrating dewatering as necessary required form work etc. complete. Part (A/1) = 4.5 M³ (A/6) = 8.00 M³ (A/13) = 8.00 M³ = 20.50 M³ (Base rate 3450.00 / M³)
NON SOR ITEM:- Supplying and laying in position approved quality fly Ash bricks as per IS-3812 specification in cement sand morton 1:4 for trapozoled toe drain at the toe/ top of the bund for pannel walls for slope protection and steps along the bund surface i/c curning with all lifts raking joints, materials etc. complete as per specification drawing and direction of Engineer-in-charge. Part (B/9) 4.50 M³ (Base rate 3100.00 / M³)
NON SOR ITEM:- Supplying and laying of 75 mm thick dry fly Ash bficks pitching as per IS-3812 over slope layer, cost of bricks, transportation, loading unloading, intertiecs between the bricks to be filled with sand i/c pannel works as per drawings etc. complete and direction of Engneer-in-charge. Part (B/8) 135.00 M² (Base rate 170.00 / M² )
NON SOR ITEM:- 25 mm thick plaster over the slope in 1:6 cement mortar i/c smooth finish memberance curing with materials labour etc. complete. Part (B/11) 135.00 M² (Base rate 100.00 / M²)
NON SOR ITEM:- Supplying and placing rainforced cement concrete of grade M-25 using 20 mm down graded coarse aggregate with minimum cement content as per table 5&6 of IS-456, 2000 of concrete for works below ground level excluding rainforcement and form work but i/c vibrating curing dewatering as necessary, providing, constructing joints, finishing, providing pockets/ cut outs placing of inserts/ embankment etc. complete as per specification and as per direction of the Engineer for the foundation for the collecting wells, circular shaft of the collecting wells and misc. work. Part (A/2) = 16 M³ (A/5) = 21.00 (A/8) = 17.00 (A/11) = 15.50 (A/16) = 30.50 = 100.00 M³ (Base rate 4700.00/ M³)
NON SOR ITEM:- Supplying, cleaning, cutting, lapping, bending as per drawing and placing in position at all location & level i/c binding with, soft annealed 16 guage black wire etc. complete for the following (b) Highyield strength deformed bars conforming to IS-1786. Part (A/3) = 3477.9184 kg (A/7) = 740.000 kg (A/10) = 2796.00 kg (A/14) = 2479.00 kg = 9492.9184 kg or 9.4929 MT (Base rate 65000.00 / MT)
NON SOR ITEM:- Providing erecting and removing form work at all elevation below or above ground for concrete work i/c scaffolding, centering bracing providing open cut out / pockets etc. complete as per specification an as directed by Engineer in charge form work to give fair and smooth finish using sheeting formed from ply wood / steel sheets as per specification direction of Engineer-in-charge. = Part (A/4) = 93.50 M² = Part (A/9) = 67.00 M² = Part (A/12) = 91.00 M² = Part (A/15) = 139.50 M² = 391.00 M² (Base rate 252.00 /M² )
NON SOR ITEM:- Providing crushed stone eggregate, depositing on a prepared surface by hauling vehicles, spreading and mixing with a motor grader, watering and compacting with a vibratory roller to clause 410 to form a layer of sub-base/ base in accordance to Table No. 400-10, 400-15 and as per clause of section 407 of specification and as per direction of Engineer-in-charge. For 53MM maximum size = Part (B/12) = 12.00 M³ (Base rate 1300.00/ M³ )
NON SOR ITEM:- Providing, laying spreading and compacting stone aggregate of specific sizes to water bound macadam specification including vibratory roller 8-10 tonenes in stages to propoer grade and camber, applying and brooming requisite type of screening/binding materials to fill up the interstices of coarse aggregate, watering and compacting to the required density as per clause 404 of specification. Part(B/13)(i)Grade-I(63 to 45mm)(a)Using screening type A(13.2mm aggregate)=4.50 CUM(Base rate1630.00/cum)
= Part (B/13) (ii) Grade-II (53 to 22.4 mm) type B (11.2 mm aggregate = 4.50 M³ (Base rate 1630.00/M³)
NON SOR Item:- Demolishing cement concrete / manually/ by mech. Means including disposal of material with in 50 m lead as per direction of Engineer in charge. Nominal concrete 1:4:8 or leaner mix (including equivalent design mix) Part (A/1) 4.50 M3 Part (A/6) 8.00 M3 Part (A/13) 8.00 M3 =20.50 M³ (Base rate 399.00 / M³ )
NON SOR Item:- Demolishing RCC work manually/ by mech. Means including stacking of steel barsand disposal of un-serviceable material with in 50 m lead as per direction of Engineer in charge. Part (A/2) 16.00 M3 Part (A/5) 20.691 M3 Part (A/9) 17.00 M3 Part (A/11) 15.50 M3 Part (A/16) 30.50 M3 = 99.691 M3 (Base rate 945.00/ M³ )
M/S HARI ENTERPRISES
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .