Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹6.0 LAdmitted-Fee/PreQual/Technical/Finance | -11.50% | ₹6.0 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹6.5 L+₹44,167.59 (7.34%)Admitted-Fee/PreQual/Technical/Finance | -5.00% | ₹6.5 L+₹44,167.59 (7.34%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹6.8 L+₹77,870.86 (12.9%)Admitted-Fee/PreQual/Technical/Finance | -0.04% | ₹6.8 L+₹77,870.86 (12.9%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L4₹7.5 L+₹1.5 L (24.3%)Admitted-Fee/PreQual/Technical/Finance | +10.00% | ₹7.5 L+₹1.5 L (24.3%) | L4 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹6.8 L
EMD Value
₹13,600
Closing Date
12 Aug 2026, 4:00 pmClosed
Xen RnB Div Tangdar
Xen RnB Div Tangdar
Construction of Bound wall at High School Gundi Shart Karnah
2026_PWDJK_317250_3
ENIT 35 RnB Div Tangdar 2026-27 RDD Ele Edu
Open Tender
Civil Works
Percentage
tangdar
Please refer Tender documents.
2 documents required · 2 mandatory
₹300
Yes
Convener, purchase committee, Directorate of ISM
₹13,600
Yes
13 Aug 2026
22 Jul 2026
13 Aug 2026
22 Jul 2026
12 Aug 2026
22 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavating, supplying and filling of local earth (including royalty)by mechanical transport upto a lead of 5 km also including ramming and watering of the earth in layers not exceeding 20 cm in trenches, plinth, sides of foundation etc. complete | 168.9 | cum | 276.6 | ₹46,717.74 |
| 2 | Earthwork in excavation by mechnical means in trenches for foundations, drains, pipes, cables etc (not exceeding 1.5 mtr in width) and for shafts , wells, cesspits and the like not exceeding 10 sqm on plan, depth upto 1.5 mtr including disposal of excavated earth upto 1mtr for cutting edges, disposed earth is to be leveled and neatly dressed in.All kind of soil | 17.09 | Cum | 256.85 | ₹4,389.57 |
| 3 | P/L of stone soling hand packed complete inclusive of all leads lifts loading unloading cost of carriage of materials form approv ed nearest source to site of work complete | 16.99 | Cum | 900 | ₹15,291 |
| 4 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | 57.91 | cum | 5,733.6 | ₹3,32,032.78 |
| 5 | Centering and shuttering including Strutting, Propping etc and removal of form work for foundation footing basis of columns | 211.35 | Sqm | 286.35 | ₹60,520.07 |
| 6 | Brick work with F.P.S. bricks of class designation 75 in foundation and plinth in: cement mortar 1:6 (1 cment : 6coarse sand) including extra for brick work in superstructure above plinth level upto floor V-Lavel | 16.94 | Cum | 7,571.55 | ₹1,28,262.06 |
| 7 | P/L 50mm thick Cement concrete coping with cement conc. 1:2:4 (1 cement : 2 coarse sand : 4 graded crushed stone agg. 20mm nominal size | 10.69 | Sqm | 461 | ₹4,928.09 |
| 8 | 12 mm thick cement plaster of mix 1:6 (1 cement: 6 coarse sand), | 67.94 | Sqm | 266.2 | ₹18,085.63 |
| 9 | P/F of PVC piping to be inserted inside the weep holes 3 inch dia as per the direction of engineer incharge etc complete job. | 15.24 | RM | 200 | ₹3,048 |
| 10 | carriage of sand/ Bajree MT 10 km | 78.18 | Cum | 279.04 | ₹21,815.35 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.00 MB
BOQ_1038831.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .