Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹14.5 LAccepted-Finance | ₹14.5 L | L1 | Accepted-Finance L1 |
| 2 | L2₹15.0 L+₹52,971.23 (3.66%)Rejected-Finance | ₹15.0 L+₹52,971.23 (3.66%) | L2 | Rejected-Finance L2 |
| 3 | L3₹15.1 L+₹67,809.11 (4.69%)Rejected-Finance | ₹15.1 L+₹67,809.11 (4.69%) | L3 | Rejected-Finance L3 |
| 4 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| 5 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹14.8 L
EMD Value
₹14,838
Closing Date
4 May 2026, 5:30 pmClosed
Addl.C.E.O
Z.P.LATUR
STRENGHENING TO C.D.WORK AND ROAD MSH - 6 HASALA HIPPARSOGA GONDRI TO SH-236 LODGA ROAD (ODR-116) KM 3/500 TO 6/200 UNDER- DPDC (3054-3462) YEAR- 2025-26
2026_LATUR_1294214_1
ZPL/W/E-T/76/2025-26
Open Tender
Civil Works
Percentage
180 days
TQ AUSA
Please refer Tender documents.
4 documents required · 4 mandatory
₹580
₹14,838
13 Aug 2026
20 Apr 2026
6 May 2026
20 Apr 2026
4 May 2026
20 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness. | 1 | SQM | - | - |
| 2 | Excavation for foundation in earth, soil of all types, sand, gravel and soft murum, including removing the excavated material up to a distance of 50 m. beyond the building area & stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etc. complete. (Lift upto 1.5 m.) By Mechanical Means | - | cum | - | - |
| 3 | Supplying hard murum/ kankar at the road site, including conveying and stacking complete. | 0.6 | cum | - | - |
| 4 | Spreading hard murum/ soft murrum/ gravel or kankar for side width complete | 0.6 | cum | - | - |
| 5 | Compacting the hard murum side widths including laying in layers on each side with power roller including artificial watering etc. complete. | 1 | SQM | - | - |
| 6 | Providing and laying cement concrete pipe of IS 458:2003 NP-2 class of 600mm diameter in proper line, level and slope including providing and fixing collars in cement mortar 1:2 and curing etc. complete. | - | RMT | - | - |
| 7 | FOR OTHER MINIRAL-SAND | - | Cubic Metre | - | - |
| 8 | Other Minerals | 1 | Cubic Metre | - | - |
| 9 | c.c.Cube M-20 | - | Per Numbers | - | - |
| 10 | ADD 18% G.S.T. | - | Per Numbers | - | - |
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.58 MB
Tendernotice_2.pdf
PDF • 0.75 MB
BOQ_2223879.xls
BOQ • 0.27 MB
DDBELOW.pdf
Other Document • 0.08 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .