Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.4 CrAdmitted-Finance DN 52 P S SRIJAN TECH PARK 6TH FLOOR SALTLAKE SECTOR V KOLKATA 700091 | KOLKATA | KOLKATA | WEST BENGAL | 700091 | ₹9.4 Cr | L1 | Admitted-Finance |
| 2 | L2₹14.1 Cr+₹4.7 Cr (50.7%)Admitted-Finance | ₹14.1 Cr+₹4.7 Cr (50.7%) | L2 | Admitted-Finance |
| 3 | L3₹17.5 Cr+₹8.1 Cr (86.9%)Admitted-Finance 10 5 CEINSYS TECH LIMITED CEINSYS TECH LTD 440022 NAGPUR MAHARASHTRA 440022 | NAGPUR | MAHARASHTRA | 440022 | ₹17.5 Cr+₹8.1 Cr (86.9%) | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | CyberSWIFT Infotech Pvt. ltd. L1 | Vishwanath Projects Limited L2 | Ceinsys Tech Limited L3 |
|---|---|---|---|---|---|---|
| 1.00PRICE AND QUANTITY OF SOFTWARE AND EQUIPMENTFOR IMPLEMENTATION OF TAMS SCHEME SCHEDULE- I (A) | ||||||
| 1.10FOR HQ / CONTROL CENTRES | ||||||
| 1.20SOFTWARE | ||||||
| 1.30 | Supply of Geospatial Web Server & Desktop Software as per Web GIS software capabilities mentioned in the Bid Document
(One Server license + Four desktop license each) | 1 | set | - | - | - |
| 1.40 | Multi user Mobile application software for maintenance Work
Reporting integrated with TAMS (Android &Ios) | 1 | set | - | - | - |
| 1.50 | Database server SQL server
standard edition (One License) | 1 | set | - | - | - |
| 2.00AT FIELD OFFICES | ||||||
| 2.10EQUIPMENT | ||||||
| 2.20 | Differential Global Positioning System (DGPS) with RTK and all accessories & associated software at field offices
(The minimum configuration is
indicated in Annexure- III of Section-IV) | 1 | Nos. | - | - | - |
| 2.30 | Hand held Differential Global Positioning System (DGPS) with all accessories & associated software at field offices
(The minimum configuration is indicated in Annexure- II of
Section-IV) | 33 | Nos. | - | - | - |
Tender Value
₹15 Cr
EMD Value
₹30 L
Closing Date
25 May 2019, 5:00 pmClosed
CE PROCUREMENT JABALPUR
CE PROCUREMENT JABALPUR MPPTCL SHAKTI BHAWAN JABALPUR
Asset Mapping of various Transmission lines and Substations using modern DGPS Survey Techniques and Web based Transmission Asset Management Systems
2019_MPPTC_18222_1
TR-17/2019
Open Tender
Electrical Works
Item Wise
1850 days
anywhere in mp
as per tender document
5 documents required · 5 mandatory
₹22,400
Payable To
₹30 L
Yes
CE PROCUREMENT MPPTCL JABALPUR
24 Jan 2020
22 Feb 2019
28 May 2019
22 Feb 2019
25 May 2019
9 Apr 2019
7 Mar 2019
PRICE AND QUANTITY OF SOFTWARE AND EQUIPMENTFOR IMPLEMENTATION OF TAMS SCHEME SCHEDULE- I (A)
FOR HQ / CONTROL CENTRES
SOFTWARE
Supply of Geospatial Web Server & Desktop Software as per Web GIS software capabilities mentioned in the Bid Document (One Server license + Four desktop license each)
Multi user Mobile application software for maintenance Work Reporting integrated with TAMS (Android &Ios)
Database server SQL server standard edition (One License)
AT FIELD OFFICES
EQUIPMENT
Differential Global Positioning System (DGPS) with RTK and all accessories & associated software at field offices (The minimum configuration is indicated in Annexure- III of Section-IV)
Hand held Differential Global Positioning System (DGPS) with all accessories & associated software at field offices (The minimum configuration is indicated in Annexure- II of Section-IV)
PRICE SCHEDULE TOWARDS SERVICES FOR INSTALLATION, TESTING, COMMISSIONING AND IMPLEMENTATION OF TAMS SCHEME SCHEDULE- I (B)
Field Work
Base Map preparation on 100 meter of both side of the transmission network covering villages, towns, cities, approach roads, National highways, express high way, rivers, terrain, hills, costal area, forest area, desert, dams etc. from Open Source freely available Satellite Imagery like Google/Bing or similar
Surveying for data collection using DGPS at each & every towers in the alignment of transmission lines and LT/HT/EHT electric lines, railway lines, water body, buildings/structures other than the line‘s towers, forest etc in Right of Way and establishment of GCP
Development of the Sub-Station Land Utilization Plan (LUP) Map including Single Line Diagram (SLD) through DGPS survey upto a desired accuracy level and vectorization of the same on GIS layers with proper labelling and standard symbology so that area of the assets can be assessed on demand in metric units
Establishing reinforced cement concrete pillar as per drawing at each substation as secondary Grid Control Point and depending upon, after,on an average of every 10 Km of transmission lines, which will be known as tertiary control points and other important points as per requirement of MPPTCL which also includes supply of required material like cement, sand, metal, reinforcement bars, steel plates, bolts/Nuts etc. and associated work of excavation, verticality & levelling, PCC & RCC concrete, fixing of reinforcement tore bars & bolts/nuts, backfilling, curing, marking of point of reading, numbering, painting etc.
Installation, Testing, Commissioning, and implementation
Development, Installation, Customization & Deployment of TAMS on Web server
Integration of TAMS with ERP
Development of Dash Board
Hosting of Towers, Transmission Lines & Substations in the Geo Portal, Development of geo-relation database for report generation, querying database in user- friendly manner, integration of data base on application software/s for analyzing & output as per MPPTCL‘s requirements
Security Audit of the Application for Hosting on NIC Server of as suggested by MPPTCL
Installation, Testing, Commissioning, and implementation of Mobile Application for all officers (meeting all requirements as per Section-I & Section-IV).
Onsite at least 03 days Training at 4 Location for Web GIS Application, Mobile Application and technique of DGPS Survey
PRICE SCHEDULE FOR ANNUAL MAINTENANCE SERVICES FOR TAMS (FOR HEAD QUARTER AND CONTROL CENTRES AND ALL FIELD UNITS) SCHEDULE- I©
Comprehensive AMC for all hardware /Web Application software / equipments installed under TAMS for 1st Year after Defect Liability period
Comprehensive AMC for all hardware / Web Applicationsoftware / equipments installed under TAMS for 2nd Year after Defect Liability period
Comprehensive AMC for all hardware / Web Applicationsoftware / equipments installed under TAMS for 3rd Year after Defect Liability period
Comprehensive AMC for all hardware / Web Applicationsoftware / equipments installed under TAMS for 4th Year after Defect Liability period
Comprehensive AMC for all hardware / Web Applicationsoftware / equipments installed under TAMS for 5thYear after Defect Liability period
Vishwanath Projects Limited
Ceinsys Tech Limited
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.93 MB
Tender.pdf
Tender Documents • 2.79 MB
NIT.pdf
Tender Documents • 0.92 MB
BOQ_20190.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .